[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-664622-105":59,"doc-detail-664622-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","exhibit-a-sample-contract-copy-1","Exhibit A - Sample Contract copy 1","","Agreement document template establishing the terms between San Diego Convention Center Corporation, Inc. and a named contractor. It defines foundational contract parties, effective date concepts, and project identification fields, then sets formal structure through sections such as Scope of Work and time-related obligations. The template specifies when performance must begin, how contract term and construction schedules operate, limits on overtime without written approval, and requirements for protecting adjacent active areas, with liquidated damages and bond provisions for payment and performance assurance.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/exhibit-a-sample-contract-copy-1/664622/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/exhibit-a-sample-contract-copy-1/664622.png","ImageObject",300,407,{"name":92,"@type":93},"Elsa","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"Who are the parties to the contract and how are they defined?","Question",{"text":112,"@type":113},"The contract is entered between San Diego Convention Center Corporation, Inc. and a designated contractor (Enter Contractor Name), with both parties defined as individual or collectively as the “Parties.”","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"When must the contractor begin performance and how is the contract term determined?",{"text":117,"@type":113},"Performance must commence immediately upon receipt of a fully executed contract. The term begins on the Effective Date and ends no later than one year from the Effective Date or upon completion of the scope of work, whichever is later.",{"name":119,"@type":110,"acceptedAnswer":120},"What happens if the work is not completed according to the construction schedule?",{"text":121,"@type":113},"If the work is not completed per the schedule, the corporation suffers damages. The contractor must pay fixed and liquidated damages of $1,000 U.S. per day for each calendar day of delay until completion and acceptance.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},664622,1793262770,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144},137455077381,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","CONTRACT  \nfor  \nENTER PROJECT NAME  \nbetween  \nSAN DIEGO CONVENTION CENTER CORPORATION, INC.  \nand  \nENTER CONTRACTOR NAME  \nCONTRACT NO. XX-XXXX-E  \nThis Contract (“Contract”) is entered into effective enter date (“Effective Date”) by and between the San Diego Convention Center Corporation, Inc. (“Corporation”), a California nonprofit corporation with primary offices located at 111 West Harbor Drive, San Diego City and County, California 92101 and enter contractor name with primary offices located at enter contractor address (“Contractor”), individually referred to herein as a “Party” or collectively as the “Parties.”  \nRECITALS  \nWHEREAS, Corporation operates and manages the San Diego Convention Center located at 111 West harbor Drive, San Diego, California (“Center”) and,  \nWHEREAS, Corporation desires io obtain the services of a qualified firm to provide and install enter description;  \nWHEREAS, Contractor responded to the RFP and is qualified to provide such services;  \nNOW THEREFORE, in consideration of the mutual covenants and conditions herein, the Parties agree as follows:  \nSECTION 1. SCOPE OF WORK  \nContractor shall complete the Scope of Work (“SOW”) as specified in Exhibit A-XXXXXX attached hereto and incorporated herein. Contractor shall also perform in accordance with the following Attachments and Exhibits:  \nAll attachments and exhibits are hereby incorporated into and made part of this Contract by this reference.  \nSECTION 2. TIME OF PERFORMANCE; LIQUIDATED DAMAGES; BONDS  \n2.1 Time is of the Essence. Contractor shall be required to commence performance of Contract immediately upon receipt of a fully executed copy of the Contract. Time is of the essence in the completion of the SOW.  \n2.2 Term. The term of this Contract shall commence on the Effective Date and terminate no later than one year from the Effective Date or upon completion of the SOW as set forth in the Construction Schedule, whichever is later (“Term”) . The Contract may be terminated sooner as provided in Sections 6 or 7 herein. Corporation has the option to extend the Term in its sole discretion and upon providing written notice to Contractor before the end of the Term. It is understood that except for the Term, all terms of this Contract (including payment and compensation terms) will remain the same.  \n2.3 Construction Schedule. The Construction Schedule depicts critical path activities required for the completion of the SOW and is attached as Exhibit     Contractor shall perform the SOW as outlined in the Construction Schedule. The SOW shall commence no later than [enter date] and be completed as set forthin Exhibit     There shall be no time extensions or changes to the Construction Schedule without  \nCorporation’s prior written consent. Corporation shall not be liable for any overtime costs incurred by Contractor to comply with the Construction Schedule unless prior written approval of Corporation is obtained.  \n2.4  Unauthorized Overtime. Corporation is not liable for overtime charges associated with the SOWin order to comply with the Construction Schedule unless prior written approval from Corporation or otherwise stated in this Contract within the Exhibit B.  \n2.5  Demolition and Modernization Period. Contractor work must be performed as not to affect adjacent active areas, events, pedestrian traffic, and existing surfaces and equipment. Contractor is responsible to protect and prevent damage to property during all work and shall restore to its original condition without extra costs to the Corporation any property damaged due to the acts or omissions of any employees, agents, or subcontractors of the Contractor. Such repairs shall meet the requirements of the Corporation.  \nThe work may proceed on a 7-day per week/24-hour per day basis, including weekdays, weekends, and holidays within the timeframe coordinated with Corporation’s Designated Representative to meet the completion date/time; except for those dates designated as “controlled ","cbCaijgp6FtDeT7e","https://ap.wps.com/l/cbCaijgp6FtDeT7e","pdf",274949,18,"English","# SECTION 1. SCOPE OF WORK\n# SECTION 2. TIME OF PERFORMANCE; LIQUIDATED DAMAGES; BONDS\n## 2.1 Time is of the Essence\n## 2.2 Term\n## 2.3 Construction Schedule\n## 2.4 Unauthorized Overtime\n## 2.5 Demolition and Modernization Period\n## 2.6 Liquidated Damages\n## 2.7 Payment and Performance Bonds\n### 2.7.1 Payment Bond\n### 2.7.2 Performance Bond","[{\"question\":\"Who are the parties to the contract and how are they defined?\",\"answer\":\"The contract is entered between San Diego Convention Center Corporation, Inc. and a designated contractor (Enter Contractor Name), with both parties defined as individual or collectively as the “Parties.”\"},{\"question\":\"When must the contractor begin performance and how is the contract term determined?\",\"answer\":\"Performance must commence immediately upon receipt of a fully executed contract. The term begins on the Effective Date and ends no later than one year from the Effective Date or upon completion of the scope of work, whichever is later.\"},{\"question\":\"What happens if the work is not completed according to the construction schedule?\",\"answer\":\"If the work is not completed per the schedule, the corporation suffers damages. The contractor must pay fixed and liquidated damages of $1,000 U.S. per day for each calendar day of delay until completion and acceptance.\"}]","Exhibit A - Sample Contract copy 1 | PDF",45]