[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-405280-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-405280-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","everhue-putt-installation-instructions","EverHue Putt Installation - Instructions","","EverHue Putt installation instructions provide step-by-step guidance for preparing an area for synthetic turf, from planning measurements and waste factor assumptions to setting grade and removing existing grass. The guide covers sub-base construction using aggregate spreading, compaction targets, and rock base coverage estimates, then details turf acclimation, trimming excess backing, and laying turf in the correct grain direction. It also explains cutting around obstacles, seaming techniques with tape and glue, and securing edges and perimeter with appropriately sized, rust-friendly nails.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/healthcare/","Healthcare",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/everhue-putt-installation-instructions/405280/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/everhue-putt-installation-instructions/405280.png","ImageObject",300,407,{"name":42,"@type":43},"ahduag","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-09-28",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",6,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"Who should install EverHue Putt, and what is the liability note in the guide?","Question",{"text":63,"@type":64},"EverHue Putt should be installed by qualified and experienced personnel. The guide states it is informational only and disclaims warranties and liability for injuries, property damage, or other losses resulting from installation.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What measurements and waste factor should be considered when purchasing turf rolls?",{"text":68,"@type":64},"Sketch the area and measure based on the product being directional. The waste factor is typically around 20%, and the guide recommends adding 1–2 feet to the length of each roll while planning to use about 14’ 6” of each roll’s width.",{"name":70,"@type":61,"acceptedAnswer":71},"How should the sub-base be prepared and compacted before turf is installed?",{"text":72,"@type":64},"A standard recommended base is 4”, with some climates requiring 2” or deeper. Spread aggregate evenly, keep the base at least 2” deep where recommended, and lightly compact the sub-base up to 90% while aiming for a smooth but solid surface; water may be needed for best compaction.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},405280,1791312042,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,105,109,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":107,"slug":108},7,40,"healthcare",{"id":110,"doc_module":4,"doc_module_name":25,"category_name":111,"show_sort_weight":112,"slug":113},8,"Research & Report",30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":97,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":106,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":26,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":143,"read_time":97,"preview_page_count":4},3985747870414,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","INSTRUCTIONS OVERVIEW  \nThis installation guide is intended to provide the necessary information for the proper installation of EverHue Putt. These instructions are believed to be based upon accepted industry standards and are provided for informational use only. Edgewood Matting Ltd. does not warranty any installation performed pursuant to these instructions or otherwise and specifically disclaims liability for any direct or indirect personal injury, property damage or other costs or losses resulting from installation. EverHue Putt should be installed by qualified and experienced personnel.  \nAREA MEASUREMENTS  \nWe recommend sketching out your area and taking good measurements. Take measurements based on product being directional. All rolls need to lay in the same direction so that the pile/fiber will lay the same way. The waste factor on most projects is around 20% . When purchasing your turf, we recommend adding 1-2 feet to the length of each roll. Plan to use 14’ 6” of the width of each roll.  \nSETTING GRADE AND PREP  \nSub-base heights may vary from climate to climate and from project to project. A 4” base is the standard recommended base; however, in some arid climates, the sub-base may be as low as 2”. In colder climates, a deeper base of 4” will most likely be needed to aid in the ground’s expansion and contraction due to freezing weather. The area free of any existing root base. When an existing lawn is present (even if dead or dormant) it is strongly recommended to remove at least 2 ½” of the existing grass. A sod cutter works best for large areas and can normally be rented from your local hardware or rental equipment store. In addition, you can use a vegetation killer if you want more protection, but it is not required.  \nSPREADING AGGREGATE TO CREATE SUBBASE  \nSpreading aggregate over the installation area is the first step in creating your subbase for synthetic grass. It is  \nrecommended the base be at least 2” deep. Use an asphalt or landscape rake to spread aggregate evenly and level your base. Using a sod roller or plate compactor, you will lightly compact the sub-base up to 90%. The goal is to have the sub-base as smooth as possible yet solid when walking on. You may have to wet the area to get the best compaction. The subbase gives the turf a solid foundation while providing proper drainage. As a general rule of thumb, 1 TON (2,000 LBS) of rock base will cover approximately 100 sq ft. of artificial turf a 2” sub-base. If you need a 4” base, you need 4000 LBS. Spread the subbase material around your project area evenly as possible.  \nTRIM EXCESS MANUFACTURING MATIERAL FROM TURF  \nTurf should be rolled out under the sun with blades facing down at least 1-2 hours before installation. This will allow the turf to acclimate and, as a result, make, it easier to work with. When turf is manufactured, an extra couple of inches of backing material remains along the edge of the turf. This extension runs the length of the turf roll on both sides after the last stitching row of yarn. Before you can seam two pieces of turf together you must remove the extra material. To trim the excess material, flip the turf over and work from the backside. Find the second row of stitching and start cutting between the second and third stitch row with a carpet knife. When your knife becomes dull, replace or rotate the blades to keep your cuts neat.– Do not cut turf from the top as it will sever the grass blades.  \nROLLING OUT TURF TO PREPARE FOR INSTALLATION ON THE BASE  \nAfter you have measured and marked your sections, roll the turf over the base and cut each section. It is a good idea to leave a little extra length while you position the turf. You will trim off the extra length once you have all the turf in position and are ready to cut the final shape. You will want to make sure that you roll out the turf in the same direction each time, as artificial grass is grain directional.  \nCUTTING TURF AROUND ROCKS AND OTHER ODD SHAPES  \nStart f","cbCaiaNKcturkJTO","https://ap.wps.com/l/cbCaiaNKcturkJTO","pdf",125868,"English","# Instructions Overview\n# Area Measurements\n# Setting Grade and Prep\n# Spreading Aggregate to Create Subbase\n# Trim Excess Manufacturing Material from Turf\n# Rolling Out Turf to Prepare for Installation on the Base\n# Cutting Turf Around Rocks and Other Odd Shapes\n# Seaming Two Turf Sections Together\n# Using Nails to Secure Turf Edges","[{\"question\":\"Who should install EverHue Putt, and what is the liability note in the guide?\",\"answer\":\"EverHue Putt should be installed by qualified and experienced personnel. The guide states it is informational only and disclaims warranties and liability for injuries, property damage, or other losses resulting from installation.\"},{\"question\":\"What measurements and waste factor should be considered when purchasing turf rolls?\",\"answer\":\"Sketch the area and measure based on the product being directional. The waste factor is typically around 20%, and the guide recommends adding 1–2 feet to the length of each roll while planning to use about 14’ 6” of each roll’s width.\"},{\"question\":\"How should the sub-base be prepared and compacted before turf is installed?\",\"answer\":\"A standard recommended base is 4”, with some climates requiring 2” or deeper. Spread aggregate evenly, keep the base at least 2” deep where recommended, and lightly compact the sub-base up to 90% while aiming for a smooth but solid surface; water may be needed for best compaction.\"}]","EverHue Putt Installation - Instructions | PDF",1790556168]