[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-160040-en":3,"doc-seo-160040-105":31,"detail-sidebar-cat-0-en-105":97},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":4,"category_id":11,"category_name":12,"doc_title":13,"doc_description":14,"doc_content":15,"file_id":16,"file_url":17,"file_type":18,"file_size":19,"view_count":20,"is_deleted":4,"is_public":21,"is_downloadable":21,"audit_status":21,"page_count":22,"language":23,"language_code":24,"site_id":25,"html_lang":24,"table_of_contents":26,"faqs":27,"seo_title":28,"seo_description":14,"update_tm":29,"read_time":30},160040,1374391974468,"Eden","https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0",4,"Exam","ESCC Basic Specification 25600 - Issue 2 - Requirements for Process Capability Approval","This ESCC Basic Specification defines the requirements for Process Capability Approval (PCA) for suppliers performing manufacturing, assembly, and test operations for electrical, electronic, or electromechanical (EEE) components intended for space applications. It clarifies the scope, applicable documents, key definitions, and the process capability domain. It establishes supplier and domain evaluation, PCA approval testing, testing documentation, approval validity, and procedures for extension, re-certification, suspension, and non-conformance handling, including supporting forms and flow charts.","REQUIREMENTS FOR PROCESS CAPABILITY  \nAPPROVAL  \nESCC Basic Specification No. 25600  \nPage 1  \nof 16  \n\n| Issue 2 | October 2018 |\n| --- | --- |\n\nDocument Custodian: European Space Agency – see [https://escies.org](https://escies.org)  \nLEGAL DISCLAIMER AND COPYRIGHT  \nEuropean Space Agency, Copyright © 2018. All rights reserved.  \nThe European Space Agency disclaims any liability or responsibility, to any person or entity, with respect to any loss or damage caused, or alleged to be caused, directly or indirectly by the use and application of this ESCC publication.  \nThis publication, without the prior permission of the European Space Agency and provided that it isnot used for a commercial purpose, may be:  \n− copied in whole, in any medium, without alteration or modification.  \n− copied in part, in any medium, provided that the ESCC document identification, comprising the ESCC symbol, document number and document issue, is removed.  \nDOCUMENTATION CHANGE NOTICE  \n(Refer to [https://escies.org](https://escies.org) for ESCC DCR content)  \n\n| DCR No. | CHANGE DESCRIPTION |\n| --- | --- |\n| 1050 | Specification upissued to incorporate changes per DCR. |\n\nTABLE OF CONTENTS  \n1 PURPOSE AND SCOPE 6  \n1.1 APPLICABLE DOCUMENTS 6  \n2 TERMS, DEFINITIONS, ABBREVIATIONS, SYMBOLS AND UNITS 6  \n2.1 DEFINITIONS 6  \n2.2 ABBREVIATIONS 6  \n3 INTRODUCTION 6  \n4 DEFINITION OF THE PROCESS CAPABILITY DOMAIN 7  \n4.1 CAPABILITY ABSTRACT 7  \n4.2 PROCESS IDENTIFICATION DOCUMENT 7  \n5 EVALUATION OF THE SUPPLIER 8  \n5.1 GENERAL 8  \n5.2 SUPPLIER’S DESIGN FACILITIES 8  \n6 EVALUATION OF THE PROCESS CAPABILITY DOMAIN 8  \n6.1 GENERAL 8  \n6.2 EVALUATION TEST STRUCTURES 9  \n6.3 COMPLETION OF EVALUATION 9  \n7 PROCESS CAPABILITY APPROVAL TESTING 9  \n7.1 GENERAL 9  \n7.2 TEST STRUCTURES FOR PCA TESTING 9  \n7.3 PROCESS CAPABILITY APPROVAL TESTING 10  \n7.4 TEST REPORT 10  \n7.5 ESCC CERTIFICATION AND LISTING 10  \n8 PROCEDURES 10  \n8.1 REQUEST FOR PROCESS CAPABILITY APPROVAL 10  \n8.2 VALIDITY OF PROCESS CAPABILITY APPROVAL 11  \n8.3 EXTENSION OF PROCESS CAPABILITY APPROVAL VALIDITY 11  \n8.4 ESCC RE-CERTIFICATION AND LISTING 11  \n8.5 LAPSE OF PROCESS CAPABILITY APPROVAL VALIDITY 12  \n8.5.1 Renewal after Lapse of Process Capability Approval 12  \n8.6 LOSS, RESTRICTION OR SUSPENSION OF PROCESS CAPABILITY APPROVAL 12  \n8.7 REDUCTION, EXTENSION AND CHANGE OF PROCESS CAPABILITY APPROVAL 12  \n8.8 QUALITY CONFORMANCE REQUIREMENTS 13  \n8.8.1 Certificate of Conformity 13  \n8.8.2 Records 13  \n8.8.3 Failures 13  \n8.8.4 Alert Procedure 14  \n8.8.5 ESCC Non-Conformance System 14  \n9 ADDITIONAL DOCUMENTATION 14  \n9.1 ANCILLARY SPECIFICATIONS 14  \n9.2 FORMS AND TEMPLATES 14  \n10 CHARTS 15  \n10.1 PROCESS CAPABILITY APPROVAL FLOW CHART 15  \n1  PURPOSE AND SCOPE  \nThe purpose of this specification is to define the requirements for the Process Capability Approval (PCA) of suppliers involved in the manufacturing, assembly and test operations necessary for the provision of electrical, electronic, or electromechanical (EEE) components intended for space application.  \nThe certification given to a supplier for Process Capability Approval does not include nor enable the ESCC Qualification of his products. The ESCC Qualification of products may be achieved through methodologies specified in ESCC documents No. 20100 , 24300 and 25400.  \n1.1 APPLICABLE DOCUMENTS  \nThe following ESCC Specifications form part of, and shall be read in conjunction with, this specification. The relevant issues shall be those in effect on the date of commencement of the PCA of the Manufacturer.  \nESCC 20200 Component Manufacturer Evaluation.  \nESCC 21300 Terms, Definitions, Abbreviations, Symbols and Units.  \nESCC 22700 Requirements and Guidelines for the Process Identification Document.  \nESCC 22800 ESCC Non-Conformance Control System  \nESCC 23100 Recommendations on the Use of the ESCC Specification System for the  \nEvaluation and Procurements of Unqualified Components.  \nESCC 24600 Minimum Quality Management System Requi","cbCaihj0pIE7JWdp","https://ap.wps.com/l/cbCaihj0pIE7JWdp","pdf",182065,8,1,16,"English","en",105,"# TABLE OF CONTENTS\n## 1 PURPOSE AND SCOPE\n## 1.1 APPLICABLE DOCUMENTS\n## 2 TERMS, DEFINITIONS, ABBREVIATIONS, SYMBOLS AND UNITS\n## 2.1 DEFINITIONS\n## 2.2 ABBREVIATIONS\n## 3 INTRODUCTION\n## 4 DEFINITION OF THE PROCESS CAPABILITY DOMAIN\n## 4.1 CAPABILITY ABSTRACT\n## 4.2 PROCESS IDENTIFICATION DOCUMENT\n## 5 EVALUATION OF THE SUPPLIER\n## 5.1 GENERAL\n## 5.2 SUPPLIER’S DESIGN FACILITIES\n## 6 EVALUATION OF THE PROCESS CAPABILITY DOMAIN\n## 6.1 GENERAL\n## 6.2 EVALUATION TEST STRUCTURES\n## 6.3 COMPLETION OF EVALUATION\n## 7 PROCESS CAPABILITY APPROVAL TESTING\n## 7.1 GENERAL\n## 7.2 TEST STRUCTURES FOR PCA TESTING\n## 7.3 PROCESS CAPABILITY APPROVAL TESTING\n## 7.4 TEST REPORT\n## 7.5 ESCC CERTIFICATION AND LISTING\n## 8 PROCEDURES\n## 8.1 REQUEST FOR PROCESS CAPABILITY APPROVAL\n## 8.2 VALIDITY OF PROCESS CAPABILITY APPROVAL\n## 8.3 EXTENSION OF PROCESS CAPABILITY APPROVAL VALIDITY\n## 8.4 ESCC RE-CERTIFICATION AND LISTING\n## 8.5 LAPSE OF PROCESS CAPABILITY APPROVAL VALIDITY\n## 8.6 LOSS, RESTRICTION OR SUSPENSION OF PROCESS CAPABILITY APPROVAL\n## 8.7 REDUCTION, EXTENSION AND CHANGE OF PROCESS CAPABILITY APPROVAL\n## 8.8 QUALITY CONFORMANCE REQUIREMENTS\n## 8.8.1 Certificate of Conformity\n## 8.8.2 Records\n## 8.8.3 Failures\n## 8.8.4 Alert Procedure\n## 8.8.5 ESCC Non-Conformance System\n## 9 ADDITIONAL DOCUMENTATION\n## 9.1 ANCILLARY SPECIFICATIONS\n## 9.2 FORMS AND TEMPLATES\n## 10 CHARTS\n## 10.1 PROCESS CAPABILITY APPROVAL FLOW CHART","[{\"question\":\"What is the purpose of ESCC 25600 Issue 2?\",\"answer\":\"It defines the requirements for Process Capability Approval (PCA) of suppliers involved in manufacturing, assembly, and test operations for space application EEE components.\"},{\"question\":\"Does PCA approval qualify the supplier’s products under ESCC Qualification?\",\"answer\":\"No. PCA certification to a supplier does not include or enable ESCC Qualification of products; product qualification may be achieved through other specified ESCC documents.\"},{\"question\":\"What are the main phases of a PCA programme?\",\"answer\":\"In general, the programme consists of four phases: defining the process capability domain and boundaries, evaluating the supplier, evaluating the process capability domain, and performing PCA testing.\"}]","ESCC Basic Specification 25600 - Issue 2 - Requirements for Process Capability Approval | PDF",1788049364,40,{"code":4,"msg":32,"data":33},"ok",{"site_id":25,"language":24,"slug":34,"title":13,"keywords":35,"description":14,"schema_data":36,"social_meta":92,"head_meta":94,"extra_data":96,"updated_unix":29},"escc-basic-specification-25600-issue-2-requirements-for-process-capability-approval","",{"@graph":37,"@context":91},[38,54,74],{"@type":39,"itemListElement":40},"BreadcrumbList",[41,45,49,52],{"item":42,"name":43,"@type":44,"position":21},"https://docshare.wps.com","Home","ListItem",{"item":46,"name":47,"@type":44,"position":48},"https://docshare.wps.com/document/","Document",2,{"item":50,"name":12,"@type":44,"position":51},"https://docshare.wps.com/document/exam/",3,{"item":53,"name":13,"@type":44,"position":11},"https://docshare.wps.com/document/escc-basic-specification-25600-issue-2-requirements-for-process-capability-approval/160040/",{"url":53,"name":13,"@type":55,"image":56,"author":61,"headline":13,"publisher":63,"fileFormat":66,"inLanguage":24,"description":14,"dateModified":67,"datePublished":68,"encodingFormat":66,"isAccessibleForFree":69,"interactionStatistic":70},"DigitalDocument",{"url":57,"@type":58,"width":59,"height":60},"https://docshare.wps.com/thumbnails/escc-basic-specification-25600-issue-2-requirements-for-process-capability-approval/160040.png","ImageObject",300,407,{"name":9,"@type":62},"Person",{"url":42,"name":64,"@type":65},"DocShare","Organization","application/pdf","2026-09-11","2026-08-30",true,{"@type":71,"interactionType":72,"userInteractionCount":20},"InteractionCounter",{"@type":73},"ViewAction",{"@type":75,"mainEntity":76},"FAQPage",[77,83,87],{"name":78,"@type":79,"acceptedAnswer":80},"What is the purpose of ESCC 25600 Issue 2?","Question",{"text":81,"@type":82},"It defines the requirements for Process Capability Approval (PCA) of suppliers involved in manufacturing, assembly, and test operations for space application EEE components.","Answer",{"name":84,"@type":79,"acceptedAnswer":85},"Does PCA approval qualify the supplier’s products under ESCC Qualification?",{"text":86,"@type":82},"No. PCA certification to a supplier does not include or enable ESCC Qualification of products; product qualification may be achieved through other specified ESCC documents.",{"name":88,"@type":79,"acceptedAnswer":89},"What are the main phases of a PCA programme?",{"text":90,"@type":82},"In general, the programme consists of four phases: defining the process capability domain and boundaries, evaluating the supplier, evaluating the process capability domain, and performing PCA testing.","https://schema.org",{"og:url":53,"og:type":93,"og:title":13,"og:site_name":64,"og:description":14},"article",{"robots":95,"canonical":53},"index,follow",{"doc_id":7,"site_id":25},{"code":4,"msg":5,"data":98},[99,103,107,110,115,120,124,128,133,136,140],{"id":21,"doc_module":4,"doc_module_name":47,"category_name":100,"show_sort_weight":101,"slug":102},"Story & Novel",90,"story-novel",{"id":48,"doc_module":4,"doc_module_name":47,"category_name":104,"show_sort_weight":105,"slug":106},"Literature",80,"literature",{"id":11,"doc_module":4,"doc_module_name":47,"category_name":12,"show_sort_weight":108,"slug":109},70,"exam",{"id":111,"doc_module":4,"doc_module_name":47,"category_name":112,"show_sort_weight":113,"slug":114},5,"Comic",60,"comic",{"id":116,"doc_module":4,"doc_module_name":47,"category_name":117,"show_sort_weight":118,"slug":119},6,"Technology",50,"technology",{"id":121,"doc_module":4,"doc_module_name":47,"category_name":122,"show_sort_weight":30,"slug":123},7,"Healthcare","healthcare",{"id":20,"doc_module":4,"doc_module_name":47,"category_name":125,"show_sort_weight":126,"slug":127},"Research & Report",30,"research-report",{"id":129,"doc_module":4,"doc_module_name":47,"category_name":130,"show_sort_weight":131,"slug":132},9,"Religion & Spirituality",20,"religion-spirituality",{"id":131,"doc_module":4,"doc_module_name":47,"category_name":134,"show_sort_weight":131,"slug":135},"World Cup","world-cup",{"id":137,"doc_module":4,"doc_module_name":47,"category_name":138,"show_sort_weight":137,"slug":139},10,"Lifestyle","lifestyle",{"id":141,"doc_module":4,"doc_module_name":47,"category_name":142,"show_sort_weight":111,"slug":143},19,"General","general"]