[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-663121-105":59,"doc-detail-663121-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","erection-notes-responsibilities","ERECTION NOTES - Responsibilities","","Erection Notes outlines required erection standards for metal buildings, including permanent bracing, temporary support provisions, alignment and correction of minor misfits, and tolerance limits tied to referenced ANSI/AISC steel building codes and sections. It covers roof and sprinkler/tributary live load items, erection tolerance conditions for crane support systems, and field-welding constraints with qualification requirements (AWS D1.1/D1.3) using approved WPS and PQR. It specifies customer responsibility for documentation and handling claims, inspection and correction notice rules, limits on shop-work misfits, alteration control in contract documents, field-modification policy, warranty disclaimers for third-party modifications, and protective peel-off film warnings for panels and trim.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/erection-notes-responsibilities/663121/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/erection-notes-responsibilities/663121.png","ImageObject",300,407,{"name":92,"@type":93},"naya.afterrain","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":81},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What bracing requirements must be installed during metal building erection?","Question",{"text":112,"@type":113},"All bracing shown and provided by the Metal Building Provider is required and must be installed by the erector as a permanent part of the structure.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Are field welding activities allowed when assembling a metal building system?",{"text":117,"@type":113},"Field welding is generally not used to assemble the system, but if drawings indicate it or approved corrections are made by field welding, welders must be qualified and all welds must follow a documented approved WPS supported by a PQR when not prequalified.",{"name":119,"@type":110,"acceptedAnswer":120},"How should the customer handle claims or correction requests for misfits?",{"text":121,"@type":113},"Claims or shortages must be reported to the Metal Building Provider within seven working days after delivery, and correction claims for alleged misfits require prior notice and reasonable inspection approval; alleged misfits cannot result in charges or return without prior approval.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},663121,1793225192,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":81,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144},962094248482,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","# ERECTION NOTES\n\n1.All bracing shown and provided by the Metal Building Provider(MBP)for this building is required and shall be instlled by the erectoras a permanent part of the structure(\"Code of Standard Practice for Steel Buildings\"in the ANSI/ASC 303-16;Section 7.10).  \n2.Temporary supports,such as guys,braces,falsework,cribbing or other elements required for the erection operation shall bedetermined and furnished by the erector(\"Code of Standard Practice for Steel Buildings and Bridges\"in the ANSI/AISC 303-16;Section 7.10.3).  \nBuilding Code:  \nHot-rolled version:  \nCold-formed version:  \n3.Normal erection operations include the correction of minor misfits by moderate amounts of reaming,grinding,welding or cutting,andthe drowing of elements into line through use of drift pins.Erors which require mojor changes in the member configuration ore tobe reported immediately to the Metal Building Provider by the customer to enable whoever is responsible either to correct the error orto approve the most efficient and economic method of corection to be used by others(\"Code of Standard Practice for SteelBuildings and Bridges ”in the ANSI/AISC 303-16;Section 7.14).  \nRoof Collateral Load:  \nSprinkler Load:  \nRoof Live Load:  \n4.Erection tolerances are set forth in the \"Code of Standaord Practice for Steel Buildings and Bridges \"in the ANSI/ASC 303-16;Section  \nTributary Live Load Reduction:  \n7.13 note that individual members are considered plump,level and aligned if the deviation does not exceed 1:500.Voriations infinished overall dimensions of structure steel framing are deemed within the limits of good practice when they do not exceed thecumulative effect of rolling,fabricoting,and erection tolerances.  \nRainfall Intensity:  \n4.1.  When crane support systems are part of the metal building system erection tolerances Section 6.8,Erection Tolerances,2018MBMA Metal Building Systems manual shall apply.To achieve the required tolerances grouting of the columns and shimming ofthe runway beams may be required.The customer shall provide grout if required.The contractor erecting the runway beams isresponsible for shimming,plumbing,and leveling of the runway system.When aligning the runway beams the alignment shall beewith respect to the beam webs so that the center of the aligned rail is over the runway web.  \n5.As a general rule field welding is not used to ossemble a metal building system.In cases where the drowings indicate field weldingand in cases where approved corrections are to be made by field welding the following requirements shall be met;  \nWind Condition:  \nInternal Pressure Coefficient:  \n5.1.  welders must be qualified by an independent testing agency,with suitable documentation to AWS D1.1 Structural Welding Code -Steel or AWS D1.3 Structural Welding Code -Sheet as applicable,for the processes,positions,and materials involved.  \nEdge Zone Width:  \n5.2.All welds must be made in conformance to a documented and approved Welding Procedure Specificotion(WPS).All joints whichare not prequalified must be supported by a certified Procedure Qulification Record(PQR)by an independent testing agency.  \nSNOW LOAD  \n6.All documentation and records shall be the responsibility of the customer.  \nRoof Snow Load:  \n7.  Any cloims or shortages by buyer must be made to the Metal Buiding Provider within seven(7)working doys fter delivery,or suchhclaims will be considered to have been waived by the customer and disallowed.All claims should be directed to the Metal BuildingProvider's Customer Service Department.  \nImportance Factor:  \nExposure Factor:  \nThermal Factor:  \n8.Claims for correction of alleged misfits will be disllowed unless the Metal Building Provider shall have received prior notice thereofand allowed reasonable inspection of such misfits.Ordinary inaccuracies of shop work shall not be construed as misfits.No part ofthe building may be returned or charges assessed for alleged misfits without prior approval from the Metal Building Pr","cbCaidFnPVzCv9JA","https://ap.wps.com/l/cbCaidFnPVzCv9JA","pdf",4536074,15,"English","# ERECTION NOTES\n## Responsibilities","[{\"question\":\"What bracing requirements must be installed during metal building erection?\",\"answer\":\"All bracing shown and provided by the Metal Building Provider is required and must be installed by the erector as a permanent part of the structure.\"},{\"question\":\"Are field welding activities allowed when assembling a metal building system?\",\"answer\":\"Field welding is generally not used to assemble the system, but if drawings indicate it or approved corrections are made by field welding, welders must be qualified and all welds must follow a documented approved WPS supported by a PQR when not prequalified.\"},{\"question\":\"How should the customer handle claims or correction requests for misfits?\",\"answer\":\"Claims or shortages must be reported to the Metal Building Provider within seven working days after delivery, and correction claims for alleged misfits require prior notice and reasonable inspection approval; alleged misfits cannot result in charges or return without prior approval.\"}]","ERECTION NOTES - Responsibilities | PDF",38]