[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-621985-105":59,"doc-detail-621985-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","epq-express-scheme-of-work-teaching-and-project-plan-for-3-months","EPQ Express Scheme of Work - Teaching and project plan for 3 months","","EPQ Express Scheme of Work outlines a three-month programme that combines teaching activities with independent project work. It provides a structured time plan by weeks, supported through learning-platform assignments and classroom discussion, emphasizing inquiry, project skills, and student decision-making. The schedule progresses from early proposal preparation to research, development, and final editing, review, and presentation, with milestones for drafts and final submission. The document notes May 2020 link accuracy and allows adaptation to recorded formats such as slides or sketchbooks.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":20,"@type":76,"position":81},"https://docshare.wps.com/document/exam/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/epq-express-scheme-of-work-teaching-and-project-plan-for-3-months/621985/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/epq-express-scheme-of-work-teaching-and-project-plan-for-3-months/621985.png","ImageObject",300,407,{"name":92,"@type":93},"วิน","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-10-29","2026-10-20",true,{"@type":102,"interactionType":103,"userInteractionCount":8},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the overall duration and teaching structure of the EPQ Express scheme?","Question",{"text":112,"@type":113},"The scheme supports a three-month programme combining classroom teaching with project work. Activities can be delivered through assignments on a learning platform and interspersed with classroom discussions and face-to-face time.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What skills and outputs are targeted in Weeks 1–2?",{"text":117,"@type":113},"Weeks 1–2 focus on inquiry skills, project skills, and generating ideas. The milestone listed for this phase is a proposal form.",{"name":119,"@type":110,"acceptedAnswer":120},"What milestones and activities occur after the research phase?",{"text":121,"@type":113},"After Weeks 3–6 research for EPQ, the plan moves into development (Weeks 7–10) with a first draft of the whole project. Weeks 11–12 cover editing, review, and presentation, ending with the hand-in point for the final EPQ.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},621985,1792466130,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":19,"category_name":20,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81,"preview_page_count":4},2336475104736,"https://ap-avatar.wpscdn.com/avatar/22000c4c5e0e5b17e70?x-image-process=image/resize,m_fixed,w_180,h_180&k=1786591360781797222","EPQ Express Scheme of Work\nThe scheme of work on the second tab is designed to support a 3-month programme of teaching and project work.  The following scheme of work is designed to be taught using a sequence of activities which could be set as assignments on a learning platform, interspersed with classroom discussion activities. The focus should be on students learning for themselves and making their own decisions about how to prepare for and carry out their projects. It is anticipated that the activities will be delivered using some face to face classroom time with further work being done outside the classroom. In the first phase of the course the focus is on developing skills and preparing for the EPQ itself. The 'Project Workstream Acitivity' column contains a list of activities that could either be posted on a learning platform as assignments for students to work through or used in a lesson. As a general guide, during the taught course, one activity could be set per lesson. During this time, the teacher will be providing more direction to the class. Once EPQ work begins, the teacher's role will be to provide supervisory guidance whilst students work independently. The Project Workstream Activities during this part of the course may last a number of weeks, as shown in the table of approximate timings below. This Scheme of Work is based mainly on a written project but can be adapted to allow for the project process to be recorded in other formats as appropriate, such as using slides or a sketchbook. Please note that the links in this Scheme of Work are correct at the time of publication (May 2020).\nTIME PLAN\nACTIVITY\nAPPROXIMATE DURATION\nMILESTONES\nWeeks 1–2\nInquiry skills / Project skills / Ideas\n2 weeks\nProposal form\nWeeks 3–6\nResearch for EPQ\n4 weeks\nFirst draft of research\nWeeks 7–10\nDevelopment of EPQ\n4 weeks\nFirst draft of whole project\nWeeks 11–12\nEditing, review and presentation of EPQ\n2 weeks\nHand in point for final EPQ","cbCaijsVtfrhJNXG","https://ap.wps.com/l/cbCaijsVtfrhJNXG","docx",14067,"English","# Time plan\n## Weeks 1–2\n## Weeks 3–6\n## Weeks 7–10\n## Weeks 11–12","[{\"question\":\"What is the overall duration and teaching structure of the EPQ Express scheme?\",\"answer\":\"The scheme supports a three-month programme combining classroom teaching with project work. Activities can be delivered through assignments on a learning platform and interspersed with classroom discussions and face-to-face time.\"},{\"question\":\"What skills and outputs are targeted in Weeks 1–2?\",\"answer\":\"Weeks 1–2 focus on inquiry skills, project skills, and generating ideas. The milestone listed for this phase is a proposal form.\"},{\"question\":\"What milestones and activities occur after the research phase?\",\"answer\":\"After Weeks 3–6 research for EPQ, the plan moves into development (Weeks 7–10) with a first draft of the whole project. Weeks 11–12 cover editing, review, and presentation, ending with the hand-in point for the final EPQ.\"}]","EPQ Express Scheme of Work - Teaching and project plan for 3 months | DOCX"]