[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-232790-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-232790-en":131},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","epic-17-08-14-ice-foia-20180920-7thinterim-production-pt5-amendment-of-solicitationmodification-of-contract-p00004","EPIC-17-08-14-ICE-FOIA-20180920-7thInterim-Production-pt5 - Amendment of Solicitation/Modification of Contract - P00004","","Administrative amendment form for a federal solicitation/modification of contract, issued under a specific contract ID and amendment number. It identifies the contracting activities, effective date, and the contractor’s name and address, and records the governing authority and clause basis. The document specifies an administrative modification to correct an identified error in a prior amendment, describes the list of changes, and provides amendment and award reference details, including performance period and continuation-sheet information.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/epic-17-08-14-ice-foia-20180920-7thinterim-production-pt5-amendment-of-solicitationmodification-of-contract-p00004/232790/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/epic-17-08-14-ice-foia-20180920-7thinterim-production-pt5-amendment-of-solicitationmodification-of-contract-p00004/232790.png","ImageObject",300,407,{"name":42,"@type":43},"Himbo","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-19","2026-09-10",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",12,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What is the purpose of this amendment document?","Question",{"text":63,"@type":64},"It records an administrative modification to correct an error identified in a prior amendment by finance under a referenced clause and contract line item context.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"Which contractor is listed on the form?",{"text":68,"@type":64},"The contractor name shown is Palantir Technologies Inc, along with its address details.",{"name":70,"@type":61,"acceptedAnswer":71},"What section explains the specific changes made by this amendment?",{"text":72,"@type":64},"The document’s Item 14, “Description of Amendment Modification,” provides the reason and description of the administrative changes and the related DUNS and exempt action information.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},232790,1789073660,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,106,111,115,120,123,127],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},6,"Technology",50,"technology",{"id":107,"doc_module":4,"doc_module_name":25,"category_name":108,"show_sort_weight":109,"slug":110},7,"Healthcare",40,"healthcare",{"id":112,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":113,"slug":114},8,30,"research-report",{"id":116,"doc_module":4,"doc_module_name":25,"category_name":117,"show_sort_weight":118,"slug":119},9,"Religion & Spirituality",20,"religion-spirituality",{"id":118,"doc_module":4,"doc_module_name":25,"category_name":121,"show_sort_weight":118,"slug":122},"World Cup","world-cup",{"id":124,"doc_module":4,"doc_module_name":25,"category_name":125,"show_sort_weight":124,"slug":126},10,"Lifestyle","lifestyle",{"id":128,"doc_module":4,"doc_module_name":25,"category_name":129,"show_sort_weight":97,"slug":130},19,"General","general",{"code":4,"msg":82,"data":132},{"doc_id":79,"user_id":133,"nickname":42,"user_avatar":134,"doc_module":4,"category_id":112,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":140,"language":141,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":142,"faqs":143,"seo_title":144,"seo_description":12,"update_tm":80,"read_time":145,"preview_page_count":4},687197100911,"https://ap-avatar.wpscdn.com/avatar/a000239b6f1da00475?x-image-process=image/resize,m_fixed,w_180,h_180&k=1785132997149421697","| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT   |  |  |  | 1.CONTRACT ID CODE   |  | PAGE OF PAGES   |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- |\n|  |  |  |  |  |  | 1   |  | 2   |\n| 2.AMENDMENTMODIFICATION NO.  \u003Cbr>P00004   | 3.EFFECTIVE DATE  \u003Cbr>See Block 16C   | 4.REQUSITIONPURCHASE REQ.NO.  \u003Cbr>192114V三Q6ISI0013   |  |  | 5.PROJECT NO.jifappicable)   |  |  |  |\n| 6.ISSUEDBY  \u003Cbr>CODE  \u003Cbr>ICE/Info Tech Svs/I!Service  \u003Cbr>Imrigracion and Customs Enfor  \u003Cbr>Office of Acquisition Managem  \u003Cbr>801 I Street NW,h)6)/h)Y7VC  \u003Cbr>Washington DC 20336   | ICE/TC/IT SERVTCE.   | CODE  \u003Cbr>7.ADMINISTERED BY(Foher than ifem 6j   |  |  |  |  | ICF./TC/T SERVICES   |  |\n|  | s  \u003Cbr>cement  \u003Cbr>ent   | ICE/Info Tech Svs/IT Services  \u003Cbr>Imunigratior ard CLstons Bzforcement  \u003Cbr>Office of Acqu:siticn Managemezt  \u003Cbr>801 I Street NW,b)6)(bY7YC)  \u003Cbr>Aztn:b)(6)(b)(7)(C)  \u003Cbr>Washington DC 20536   |  |  |  |  |  |  |\n| 8.NAME AND ADDRESS OFCONTRACTOR pMo.teet couny.State ene ZPCodce)  \u003Cbr>ALANTIR TECHNOLCGIES INC  \u003Cbr>00 HAMILTON AVENUE  \u003Cbr>SDTE 300  \u003Cbr>AJO ALTO CA 943011650   |  | ×)   | SA AMENDMENT OF SOUCITATIONNO.   |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |\n|  |  |  | 98.DATED {SEE ITEM11)   |  |  |  |  |  |\n|  |  | x   | 10A MODIFICATION OF CONTRACT/ORDER NO.  \u003Cbr>CS-35F-0086U  \u003Cbr>HSCETC-13-F-00030   |  |  |  |  |  |\n|  |  |  | 10B.DATED(SEE/TEM 13)  \u003Cbr>06/13/2013   |  |  |  |  |  |\n| CODE  \u003Cbr>36213095200C0   | FACILITY CODE   |  |  |  |  |  |  |  |\n\n2  \nP  \n# 11.THSTTEM ONLYAPPLIES TO AMENDMENTSOF SOLICITATIONS\n\n□The above numbered solicilation is amended as sat forth in ltem 14.The hour and date specried for receipt of Ofors  \n□is ex:ended.□is nol exlended.  \nOffers mustacknowlscgo receictofthisomondnent pnio to the hourand date spectied in tns solctadion or as amended,by one of the foilowing methods:(a)By conpletinglems8and 15,and retuning     cogies of tne arnencment,(b)By acknowedning receipt of this amendment on each ocpy of the oller sumitted;αx(c)Byseparate lerter or telegram which includes a reference io he solicilation and amendment rumbers.FALURE OFYOURACKNOWLEDGEMENT TOBE RECEIVEDATTHE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER If byvirtue of this amendment you desire to change anoffer alreasy submitted,sLcn change may se made ty telegram or letler,provided each telegram or let:er makes referenceto the solicitation and this amendmcnt,and is received prior to the opening hour and cate spocifiea                                   \n# 12.ACCOUNTINGAND APPROPRIATION DATA(\\#required)\n\nSee Scnedule  \n13.THISTEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.IT MODIFES THE CONTRACT/ORDER ND.AS DESCRIBED IN ITEM14.  \n\n| CHECK ONE   | A THIS CHANGE ORDERIS ISSUED PURSUANT TO:fSpeciy authenty)THE CHANGES SETFORTH IN ITEM14ARE MADEINTHE CONTRACT  \u003Cbr>ORDERNO.IN ITEM 10A.   |\n| --- | --- |\n|  |  |\n|  | B.THEABOVE NUMBERED CONTRACT/ORDERISMODIFIEDTOREFLECITHEADMINISTRATIVE CHANGES such as chenges in payingofice.  \u003Cbr>aopropriason date,etc.)SETFORTH INITEM 14.PURSUANT TO THE AUTHORITY OFFAR 43.103(D).   |\n| X   | C.THIS SUPPLEMENTALAGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITYOF:  \u003Cbr>Pursuant to FAR 52.217-9(Option co Extend the Tern of Lhe Contract)clause   |\n|  | D.OTHER{Specify type of mozication and authority)   |\n\n0  \ncopies lo the issuing ofice.  \nE.IMPORTANT:  \n冈is nol  广is required to sign chis document anc retun.  \nConractor  \n14.DESCRIPTION OFAMENDMENTMODTFICATION fOrganized by UCF secfion heaings,inchuching solictationcontract subjeat mattor where easibfe.)  \nDUNS Number;  3621.30952  \nExempt Action:N  \nThis is an administrative modification to correct an crror idenitifed in P00003 by financeunder CLIN 1007.The obligation anont(Colunn F)shouid have read D(4)    vice  \n$0.00.  PO00C3 and POO0C4 are being subnitted simultaneously for processing since allfunding was placed on P00003.  \n三IST OF CHAKGES:  \nReason for Mod","cbCaiphkP4OHgpJU","https://ap.wps.com/l/cbCaiphkP4OHgpJU","pdf",7076785,114,"English","# Amendment of Solicitation/Modification of Contract\n## Form Items and Identification Fields\n## Signer Information and Description of Amendment\n## Continuation Sheet","[{\"question\":\"What is the purpose of this amendment document?\",\"answer\":\"It records an administrative modification to correct an error identified in a prior amendment by finance under a referenced clause and contract line item context.\"},{\"question\":\"Which contractor is listed on the form?\",\"answer\":\"The contractor name shown is Palantir Technologies Inc, along with its address details.\"},{\"question\":\"What section explains the specific changes made by this amendment?\",\"answer\":\"The document’s Item 14, “Description of Amendment Modification,” provides the reason and description of the administrative changes and the related DUNS and exempt action information.\"}]","EPIC-17-08-14-ICE-FOIA-20180920-7thInterim-Production-pt5 - Amendment of Solicitation/Modification of Contract - P00004 | PDF",287]