[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-663041-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-663041-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","epcikfl-roof-replacement-bid-drawings-3-29-2021","EPCIKFL Roof Replacement - Bid Drawings - 3-29-2021","","Bid drawing set for the EPCIKFL Roof Replacement project at the University of Colorado, Colorado Springs. General notes cover demolition of existing EPDM & SBS modified cap roofing and installation of a new TPO membrane roof assembly, including replacement of roof flashings and overflow drainage piping. Requirements address compliance with federal, state, and local codes; permit acquisition; dust control; coordination with an existing lightning-protection system; contractor responsibilities for inspections, testing, protection of adjacent areas, and disposal of demolition debris.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/epcikfl-roof-replacement-bid-drawings-3-29-2021/663041/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/epcikfl-roof-replacement-bid-drawings-3-29-2021/663041.png","ImageObject",300,407,{"name":42,"@type":43},"Franzy","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":52,"interactionType":53,"userInteractionCount":33},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What is included in the roof replacement scope according to the general notes?","Question",{"text":62,"@type":63},"Demolition of the existing EPDM & SBS modified cap roof and replacement with a new TPO membrane roof assembly is included, along with roof flashing replacement and overflow drainage piping.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"Which compliance requirements does the contractor need to follow?",{"text":67,"@type":63},"All work and materials must comply with current federal, state, and local codes, and required permits must be secured by the contractor.",{"name":69,"@type":60,"acceptedAnswer":70},"How must the contractor handle the existing lightning-protection system?",{"text":71,"@type":63},"The contractor must engage a qualified lightning-protection specialist, coordinate work affected by roof replacement, and ensure components remain or are replaced to bring the building into compliance with current lightning-protection standards.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},663041,1793224780,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":33,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":115,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":79,"read_time":143},2336478945519,"https://ap-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","2021- 5:07pm  \nMar  \nRoof Replacement 2020\\EPCIKFL Roof Replacement - plans.dwg  \nS:\\UCCS  \nABBREVIATIONSAND①-JUNCTION BOXANGLEJANJANITOR@JOIST4CENTER LINE\\#NUMBER OR POUNDK-    KDJOINT          KNOCKDOWN  \n# UNIVERSITY OF COLORADO,COLORADO SPRINGSKRAEMER FAMILY LIBRARY/EL POMAR CENTERROOF REPLACEMENT\n\nKITRKITCHENPROPERTY LINE  \n①-  \nA    DIAMETERLABORATORYLAVATORYANCHOR BOLTLFLINEAL FOOT,LINEAL FEETLINOLINOLEUMACOUSTIC CEILING PANELLOCKERACOUSTIC CEILING TILELIVE LOADAMERICANS W/DISABILITIES ACTLONG LEG HORIZONTALADDADDENDUMLONG LEG VERTICALADJACENTITLIGHTAEDAUTOMATIC EXTERNALDEFIBRILLATORM-MARNTMAINTAIN,MAINTENANCEABOVE FINISHED FLOORMASMASONRYAGGAGGREGATEMATLMATERIALAHJAUTHORITY HAVING JURISDICTIONMAXMAXIMUM  \nAHUAIR HANDLING UNITALTALTERNATEMBMARKER BOARDMEDIUM-DENSITY FIBERBOARDBID DOCUMENTSALUMMECHANICALANODMEMBER OR MEMBRANE  \nARCHARCHITECTURAL,ARCHITECTMFMANUFACTURERMAN HOLEPROJECT NUMBER:2021-042M21ASIARCHITECT'S SUPPLEMENTARYMINMINIMUMINSTRUCTIONSMIRRMIRRORASPHMISCMISCELLANEOUS⑧-    AUTOMATIC        MLDGMOULDINGBOARDBITUMBITUMINOUSBLDGBUILDINGMMASONRY OPENINGMARCH 29,2021MOISTURE RESISTANTMOUNTEDBLKGBLOCKINGMTLMETALBEAM     BULL NOSEMUMULLION           BOTTOM OFNNORTH  \nBOTTOMNAGENERAL NOTESDIRECTORYPROJECT SCOPE OF WORKBRGBEARINGNICNOT IN CONTRACTBSMTBASEMENTNOBTWNBETWEENNOMINAL  \n◎C&GCABCABINETCEMCEMENT◎1.   THE FOLLOWING GENERAL NOTES APPLY TO THE ENTIRE SET OF DRAWINGS AND       OWNER       PROJECT CONSISTS OF DEMOLITION OF EXISTING EPDM &SBS MOD CAP ROOFING AND REPLACING WITH NEWNOT TO SCALEARE NOT SPECIFIC TO ANY ONE DISCIPLINE.THESE NOTES SUPPLEMENT THEOF THE IBC.OVERSPECIFICATIONS.UNIVERSITY OF COLORADO,COLORADO SPRINGSTPO MEMBRANE ROOF ASSEMBLY.WORK ALSO INCLUDES REPLACEMENT OF ROOF FLASHINGS ANDOVERALL20.CONTRACTOR SHALL LEGALLY DISPOSE OF ALL DEMOLITION/CONSTRUCTIONCONTACT:LYNNETTE GALLETTAASSOCIATED ROOFING ACCESSORIES,AS WELL AS NEW OVERFLOW DRAINAGE PIPING.CERCERAMICON CENTERCFMCUBIC FEET PER MINUTE2.   ALL WORK AND MATERIAL SHALL BE IN ACCORDANCE WITH CURRENT FEDERAL,WASTE.PROJECT MANAGERBASE BID:CORNER GUARDOVERHEADSTATE,AND LOCAL CODES.1420 AUSTIN BLUFFS PKWY.15-YEAR ROOF WARRANTYCICAST IRONOPENING21.  THE CONTRACTOR SHALL KEEP AREAS FREE FROM ACCUMULATION OF DEBRISCOLORADO SPRINGS,CO 80918ADDITIVE ALTERNATE\\#1:20-YEAR ROOF WARRANTYCAST IN PLACEOPPOSITE3.   THE CONSTRUCTION,REMODEL OR DEMOLITION OF A BUILDING SHALL COMPLYAND SHALL CONTROL ALL DUST,WORK AREA MUST BE BROOM CLEAN AT THE ENDPHONE:(719)502-1433CONTROL JOINTORDOVERFLOW ROOF DRAINWITH IFC CHAPTER 14 AND NFPA 241.OF EACH DAY TO THE GREATEST EXTENT POSSIBLE.EMAIL:Igallett@uccs.eduCENTER LINETHE BUILDING HAS AN EXISTING LIGHTNING-PROTECTION SYSTEM THAT WILL BE AFFECTED BY ROOF    OUNCE          CEILING4.  THE CONTRACTOR SHALL SECURE AND PAY FOR ALL REQUIRED PERMITS,22.PROVIDE DUST CONTAINMENT DURING CONSTRUCTION ADEQUATE TO PROTECTREPLACEMENT WORK.CONTRACTOR SHALL ENGAGE A QUALIFIED LIGHTNING PROTECTION SPECIALIST TO        ARCHITECT        CONCRETE MASONRY UNITPLAMPLATE OR PROPERTY LINEUNLESS OTHERWISE SPECIFIED IN THESE DOCUMENTS,AND COORDINATE ANDALL ADJACENT AREAS AND TO MEET ALL LOCAL,REGIONAL,STATE AND FEDERALFIELD-VERIFY EXISTING CONDITIONS.TO DIRECT REMOVAL &REINSTALLATION OF EXISTING LIGHTNINGPLASTIC LAMINATESCHEDULE ALL REQUIRED INSPECTIONS AND TESTS.REQUIREMENTS FOR ENVIRONMENTAL CONTROL WHERE THERE IS CONTINUOUSHALL ARCHITECTSPROTECTION COMPONENTS TO REMAIN,AND TO DESIGN,SPECIFY,AND INSTALL NEW LIGHTNING PROTECTIONCOUNTERCHANGE ORDER OR COMPANYPLBGPLASTERFOOD PREPARATION.CONTACT:BENJAMIN KUBCZAKCOMPONENTS TO BRING THE BUILDING IN COMPLIANCE WITH CURRENT LIGHTNING PROTECTION STANDARDSPLUMBINGCOLUMNPLYWDPLYWOOD1935 DOMINION WAY,SUITE 202EXISTING LIGHTNING PROTECTION COMPONENTS SHOWN ON ROOF DEMOLITION PLANS FOR REFERENCECONC CONCRETEPNLPANELCERTIFICATE OF INSURANCE FOR ALL LIABILITIES,WITH AHOLD HARMLESS FOR23.  CONTRACTOR SHALL PROTECT ADJACENT AREAS FROM DAMAGE.ALL DAMAGECOLORADO SPRINGS,CO 80918ONLY.THE LIGHTNING PROTECTION SYSTEM","cbCaidSbFUX7n1mP","https://ap.wps.com/l/cbCaidSbFUX7n1mP","pdf",8913106,"English","# General Notes\n## Roof replacement scope and assemblies\n## Compliance, permits, and environmental control\n## Lightning-protection coordination\n## Contractor responsibilities and surface repair","[{\"question\":\"What is included in the roof replacement scope according to the general notes?\",\"answer\":\"Demolition of the existing EPDM \\u0026 SBS modified cap roof and replacement with a new TPO membrane roof assembly is included, along with roof flashing replacement and overflow drainage piping.\"},{\"question\":\"Which compliance requirements does the contractor need to follow?\",\"answer\":\"All work and materials must comply with current federal, state, and local codes, and required permits must be secured by the contractor.\"},{\"question\":\"How must the contractor handle the existing lightning-protection system?\",\"answer\":\"The contractor must engage a qualified lightning-protection specialist, coordinate work affected by roof replacement, and ensure components remain or are replaced to bring the building into compliance with current lightning-protection standards.\"}]","EPCIKFL Roof Replacement - Bid Drawings - 3-29-2021 | PDF",23]