[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-650056-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-650056-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","enlarged-plans-plumbing-construction-documents","ENLARGED PLANS - PLUMBING - CONSTRUCTION DOCUMENTS","","Enlarged plumbing plans for a fully sprinklered laboratory addition project, including plumbing drawings, location and project identifiers, and multiple floor plan references. Plumbing fixture and medical gas system equipment schedules specify alarm panel functionality, pressure monitoring behavior, alarm indication and testing provisions, and responsibilities for wiring diagrams and coordination. Backflow preventer devices are detailed with mounting constraints, required strainers and valves, approved listings, and performance ratings including pressure drop limits and factory testing requirements for double check and reduced pressure zone assemblies.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/enlarged-plans-plumbing-construction-documents/650056/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/enlarged-plans-plumbing-construction-documents/650056.png","ImageObject",300,407,{"name":42,"@type":43},"naya.afterrain","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-24",true,{"@type":52,"interactionType":53,"userInteractionCount":33},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What does the medical gas alarm panel monitor and how does it indicate abnormal conditions?","Question",{"text":62,"@type":63},"It monitors carbon dioxide changeover/reserve and line pressure states. Abnormal pressure triggers an audible warning and an “abnormal” red light, while a green light indicates normal systems.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"How is wiring responsibility divided between trades for the medical gas alarm system?",{"text":67,"@type":63},"Alarm wiring serving central equipment and alarm panels is the plumbing contractor’s responsibility, as is wiring for pressure switches, actuators, sensors, and any other required medical gas and alarm components.",{"name":69,"@type":60,"acceptedAnswer":70},"What installation requirements apply to the backflow preventer assemblies shown in the schedule?",{"text":71,"@type":63},"Backflow preventers must be mounted within 60\" of the finished floor, with upstream strainers and additional valves upstream of each strainer, and submittal of flow pressure drop curves.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},650056,1792815773,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":33,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":79,"read_time":144},962094248482,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","|  |\n| --- |\n| 1\u003Cbr>2 3 4 5 6 7 8 9\u003Cbr>10\u003Cbr>|\n| D\u003Cbr>E\u003Cbr>F\u003Cbr>C:\\Revit Local Files\\[MEPT17_17002202.00_VA SIOUX FALLS LAB ADDITION_keith.m.padgett@imegcorp.com.rvt 1/10/2019 9:24:28 AM](MEPT17_17002202.00_VA SIOUX FALLS LAB ADDITION_keith.m.padgett@imegcorp.com.rvt 1/10/2019 9:24:28 AM)\u003Cbr>\u003Cbr>~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~  EE\u003Cbr>\u003Cbr>3/4\" RO  \u003Cbr>  1 1/2\" HW ~~ ~~   \u003Cbr>2 1/2\" CW ~~ ~~ ~~ ~~ 3/4\" HW\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>8\" STS\u003Cbr>3/4\" HWC\u003Cbr> 1/2\" CW UP\u003Cbr>3/4\" CW\u003Cbr>\u003Cbr>\u003Cbr>1 ~~ ~~\"~~ ~~=-0\"~~ ~~FLOOR~~ ~~PLAN-PLUMB~~I~~NG-ENLARGED~~ ~~PLAN\u003Cbr>\u003Cbr>\u003Cbr>2\" SAN\u003Cbr>1\" CW UP WC\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>4\" SAN 4\" SAN\u003Cbr>BFP-1\u003Cbr>\u003Cbr>2 ~~ ~~\"~~ ~~=~~ ~~-0\"~~ ~~FLOOR~~ ~~PLAN-PLUMB~~I~~NG-ENLARGED~~ ~~PLAN~~ 2~~\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>3 ~~ ~~\"~~ ~~=~~ ~~-0\"~~ ~~FLOOR~~ ~~PLAN-PLUMB~~I~~NG-ENLARGED~~ ~~PLAN~~ 3~~\u003Cbr>\u003Cbr>CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP \u003Cbr>Drawing Title\u003Cbr>ENLARGED PLANS-PLUMBING\u003Cbr>Approved: Phase\u003Cbr>CONSTRUCTION DOCUMENTS Project Title\u003Cbr>CONSTRUCT LABORATORY ADDITION Project Number\u003Cbr>438-440 \u003Cbr>15 SUNNEN DR SUITE 104\u003Cbr>SAINT LOUIS, MO 63143\u003Cbr>\u003Cbr>PH: 314.645.1132\u003Cbr>FAX: 314.645.1173\u003Cbr>[www.imegcorp.com](www.imegcorp.com) Building Number\u003Cbr>5 FULLY SPRINKLERED Location\u003Cbr>SIOUX FALLS, SOUTH DAKOTA Drawing Number\u003Cbr>P400 Issue Date 01/11/2019 Checked\u003Cbr>PETERN Drawn\u003Cbr>DELLLE Revisions: Date:\u003Cbr>D\u003Cbr>E\u003Cbr>F\u003Cbr>VA FORM 08-6231\u003Cbr>1\u003Cbr>2 3 4 5 6 7 8 9\u003Cbr>10 |\n|  |\n\n|  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |\n| A\u003Cbr>B\u003Cbr>C\u003Cbr>D\u003Cbr>E\u003Cbr>F\u003Cbr>C:\\Revit Local Files\\[MEPT17_17002202.00_VA SIOUX FALLS LAB ADDITION_keith.m.padgett@imegcorp.com.rvt 1/10/2019 9:24:44 AM](MEPT17_17002202.00_VA SIOUX FALLS LAB ADDITION_keith.m.padgett@imegcorp.com.rvt 1/10/2019 9:24:44 AM)\u003Cbr>PLUMBING FIXTURE SCHEDULE TAG NAME DESCRIPTION MANF. & MODEL AGF-1 AIR GAP FITTING-CAST IRON CONSTRUCTION, SET SCREW OR THREADED INLET, SELECT SIZE TO MATCH INDIRECT WASTE LINE INLET AND STANDPIPE OUTLET. ZURN (Z1025), JOSAM, SMITH, WADE AP-1 COMBINATION MASTER/AREA ALARM PANEL-MODULAR IN DESIGN, DIGITAL TYPE, USED WITH REMOTE OR LOCAL SENSORS AND PRESSURE SWITCHES TO MONITOR THE FOLLOWING:\u003Cbr>CARBON DIOXIDE CHANGEOVER/RESERVE IN USE CARBON DIOXIDE LINE PRESSURE HIGH\u003Cbr>CARBON DIOXIDE LINE PRESSURE LOW\u003Cbr>CARBON DIOXIDE LINE PRESSURE\u003Cbr>ABNORMAL PRESSURE SHALL BE INDICATED IF THE PRESSURE AT ANY OF THE MEDICAL GAS SERVICES IS 20% ABOVE OR 20% BELOW THEIR NORMAL PRESSURE. EACH OF THE ITEMS MONITORED AS INDICATED ABOVE SHALL HAVE A GREEN LIGHT TO INDICATE ALL SYSTEMS ARE NORMAL. AN AUDIBLE WARNING DEVICE WILL SOUND AND THE “ABNORMAL” RED LIGHT SHALL COME ON TO INDICATE AN ALARM. A SWITCH SHALL BE PROVIDED TO SILENCE WARNING DEVICE. “ABNORMAL” RED LIGHT WILL REMAIN LIT UNTIL CONDITION HAS BEEN CORRECTED. A TEST SWITCH SHALL BE SUPPLIED TO TEST INTERNAL CIRCUITS, LIGHTS AND WARNING DEVICES. A BUILT-IN LCD WILL CONTINUOUSLY DISPLAY THE PRESSURE AT ALL TIMES.\u003Cbr>PROVIDE RELAY BOARD DRY CONTACTS FOR EACH ALARM POINT FOR CONNECTION TO THE BUILDING AUTOMATION SYSTEM.\u003Cbr>A 115 VOLT POWER SUPPLY TO THE ALARM PANEL TO BE WIRED BY THE ELECTRICAL CONTRACTOR. ALL POWER WIRING SERVING THE EQUIPMENT SHALL BE BY THE ELECTRICAL CONTRACTOR.\u003Cbr>ALL ALARM WIRING SERVING CENTRAL EQUIPMENT AND ALARM PANELS SHALL BE THE RESPONSIBILITY OF THE PLUMBING CONTRACTOR. ALL ALARM WIRING SERVING PRESSURE SWITCHES, ACTUATORS, SENSORS, AND ANY OTHER EQUIPMENT REQUIRED FOR COMPLETE MEDICAL GAS AND MEDICAL GAS ALARM SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PLUMBING CONTRACTOR.\u003Cbr>WIRING TO COMPLY WITH THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE. THE PLUMBING CONTRACTOR SHALL PROVIDE WIRING DIAGRAMS TO THE ELECTRICAL CONTRACTOR.\u003Cbr>REFER TO 11/P300 FOR MEDICAL GAS SCHEMATIC WIRING DIAGRAM. BEACON/MEDAES\u003Cbr>ALLIED\u003Cbr>HEALTHCARE/CHEMETRON SQUIRE-COGSWELL/AEROS AMICO BFP-1 BACK FLOW PREVENTER-DOUBLE CHECK, LEAD FREE BRONZE CONSTRUCTION, SAME SIZE AS PIPE, NO","cbCaibkezrEqm8rR","https://ap.wps.com/l/cbCaibkezrEqm8rR","pdf",18299511,52,"English","# Enlarged Plans - Plumbing\n## Construction Documents","[{\"question\":\"What does the medical gas alarm panel monitor and how does it indicate abnormal conditions?\",\"answer\":\"It monitors carbon dioxide changeover/reserve and line pressure states. Abnormal pressure triggers an audible warning and an “abnormal” red light, while a green light indicates normal systems.\"},{\"question\":\"How is wiring responsibility divided between trades for the medical gas alarm system?\",\"answer\":\"Alarm wiring serving central equipment and alarm panels is the plumbing contractor’s responsibility, as is wiring for pressure switches, actuators, sensors, and any other required medical gas and alarm components.\"},{\"question\":\"What installation requirements apply to the backflow preventer assemblies shown in the schedule?\",\"answer\":\"Backflow preventers must be mounted within 60\\\" of the finished floor, with upstream strainers and additional valves upstream of each strainer, and submittal of flow pressure drop curves.\"}]","ENLARGED PLANS - PLUMBING - CONSTRUCTION DOCUMENTS | PDF",131]