[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-648425-105":3,"doc-detail-648425-en":80,"detail-sidebar-cat-0-en-105":98},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","engineering-drawing-and-document-requirements-document-control","Engineering Drawing and Document Requirements - Document Control","","Engineering drawing and document practices define uniform yet flexible procedures for creating, using, interpreting, and controlling engineering drawings and associated document files. The directive specifies document history logging, revision and effective dates, purpose, applicability, authority, and cancellation. It establishes general administrative procedures, separate non-facility and facility administrative controls, and detailed engineering drawing requirements including size/format, basic requirements, and security classification, plus approval and release processes. Appendices cover file naming conventions and metadata for facility configuration management.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/technology/","Technology",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/engineering-drawing-and-document-requirements-document-control/648425/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/engineering-drawing-and-document-requirements-document-control/648425.png","ImageObject",300,407,{"name":42,"@type":43},"Eliana","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-26","2026-10-23",true,{"@type":52,"interactionType":53,"userInteractionCount":30},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What is the purpose of the engineering drawing and document directive?","Question",{"text":62,"@type":63},"It provides a uniform but flexible system for engineering drawing and document preparation, use, and interpretation, including a standard numbering system and configuration control tools.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"Which administrative areas are covered by the directive?",{"text":67,"@type":63},"It defines general administrative procedures, non-facility administrative procedures, and facility administrative procedures, each with scopes and controls for engineering drawing and document files.",{"name":69,"@type":60,"acceptedAnswer":70},"How are drawings and documents released and approved?",{"text":71,"@type":63},"Non-facility drawing and documentation control sections define drawing media, release approval, and the approval process steps for controlled issuance.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},648425,1792901819,{"code":4,"msg":81,"data":82},"success",{"doc_id":78,"user_id":83,"nickname":42,"user_avatar":84,"doc_module":4,"category_id":85,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":86,"file_id":87,"file_url":88,"file_type":89,"file_size":90,"view_count":30,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":91,"language":92,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":93,"faqs":94,"seo_title":95,"seo_description":12,"update_tm":96,"read_time":97},4398048949847,"https://ap-avatar.wpscdn.com/avatar/400002536579ef2da7f?_k=1778318612642679267",6,"Subject: Engineering Drawing and Document Requirements  \nResponsible Office: Office of the Director – Chief Engineer  \nDOCUMENT HISTORY LOG  \n\n| Document\u003Cbr>Revision | Effective\u003Cbr>Date | Description |\n| --- | --- | --- |\n| K | TBD, 2022 | Updates include:\u003Cbr>• Adding a Document History Log for Future Updates\u003Cbr>• Changes to reflects the implementation of the Facility Configuration Management System (FCMS) for facility drawings\u003Cbr>• Changes to align non-facility drawing management with current practices targeted at digital engineering practices\u003Cbr>• Changes to update SBU with CUI references\u003Cbr>• Updates to address LMS review, Chapter 2 Scope update and Section 5.3.2 updated |\n|  |  |  |\n|  |  |  |\n\nCONTENTS  \nPREFACE .........................................................................................................................................................4  \nP.1 Purpose...........................................................................................................................................................4  \nP.2 Applicability ....................................................................................................................................................4  \nP.3 Authority.........................................................................................................................................................5  \nP.4 Applicable Documents and Forms ..................................................................................................................5  \nP.5 Measurement/Verification .............................................................................................................................6  \nP.6 Cancellation ....................................................................................................................................................6  \nCHAPTER 1 – GENERAL ADMINISTRATIVE PROCEDURES......................................................................7  \n1.1 Scope ..............................................................................................................................................................7  \n1.2 Maintenance of Engineering Drawing Procedural Requirements ..................................................................7  \n1.3 Engineering Drawing and Document Files ......................................................................................................7  \n1.4 Drawing and Document Changes ...................................................................................................................8  \n1.5 Security Classification .....................................................................................................................................8  \nCHAPTER 2 – NON-FACILITY ADMINISTRATIVE PROCEDURES ............................................................10  \n2.1 Scope ............................................................................................................................................................ 10  \n2.2 Engineering Drawing and Document Files ....................................................................................................10  \nCHAPTER 3 –FACILITY ADMINISTRATIVE PROCEDURES ......................................................................13  \n3.1 Scope ............................................................................................................................................................ 13  \n3.2 Engineering Drawing and Document Files ....................................................................................................13  \nCHAPTER 4-ENGINEERING DRAWING REQUIREMENTS ......................................................................14  \n4.1 Size and Format ............................................................................................................................................ 14  \n4.2 Basic Requirements ....................................................","cbCaihXftpTppSBz","https://ap.wps.com/l/cbCaihXftpTppSBz","pdf",465656,27,"English","# Preface\n## P.1 Purpose\n## P.2 Applicability\n## P.3 Authority\n## P.4 Applicable Documents and Forms\n## P.5 Measurement/Verification\n## P.6 Cancellation\n# Chapter 1 - General Administrative Procedures\n## 1.1 Scope\n## 1.2 Maintenance of Engineering Drawing Procedural Requirements\n## 1.3 Engineering Drawing and Document Files\n## 1.4 Drawing and Document Changes\n## 1.5 Security Classification\n# Chapter 2 - Non-Facility Administrative Procedures\n## 2.1 Scope\n## 2.2 Engineering Drawing and Document Files\n# Chapter 3 - Facility Administrative Procedures\n## 3.1 Scope\n## 3.2 Engineering Drawing and Document Files\n# Chapter 4 - Engineering Drawing Requirements\n## 4.1 Size and Format\n## 4.2 Basic Requirements\n# Chapter 5 - Non-Facility Drawing and Documentation Control\n## 5.1 Definition\n## 5.2 Applicability\n## 5.3 Drawing Document Media\n## 5.4 Release Approval\n## 5.5 Approval Process\n# Appendix A - Facility Configuration Management Drawing and Document File Naming Convention\n# Appendix B - Facility Drawing/Document Metadata","[{\"question\":\"What is the purpose of the engineering drawing and document directive?\",\"answer\":\"It provides a uniform but flexible system for engineering drawing and document preparation, use, and interpretation, including a standard numbering system and configuration control tools.\"},{\"question\":\"Which administrative areas are covered by the directive?\",\"answer\":\"It defines general administrative procedures, non-facility administrative procedures, and facility administrative procedures, each with scopes and controls for engineering drawing and document files.\"},{\"question\":\"How are drawings and documents released and approved?\",\"answer\":\"Non-facility drawing and documentation control sections define drawing media, release approval, and the approval process steps for controlled issuance.\"}]","Engineering Drawing and Document Requirements - Document Control | PDF",1792793440,68,{"code":4,"msg":81,"data":99},[100,104,108,112,117,120,125,130,135,138,142],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":101,"show_sort_weight":102,"slug":103},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":105,"show_sort_weight":106,"slug":107},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":109,"show_sort_weight":110,"slug":111},"Exam",70,"exam",{"id":113,"doc_module":4,"doc_module_name":25,"category_name":114,"show_sort_weight":115,"slug":116},5,"Comic",60,"comic",{"id":85,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":118,"slug":119},50,"technology",{"id":121,"doc_module":4,"doc_module_name":25,"category_name":122,"show_sort_weight":123,"slug":124},7,"Healthcare",40,"healthcare",{"id":126,"doc_module":4,"doc_module_name":25,"category_name":127,"show_sort_weight":128,"slug":129},8,"Research & Report",30,"research-report",{"id":131,"doc_module":4,"doc_module_name":25,"category_name":132,"show_sort_weight":133,"slug":134},9,"Religion & Spirituality",20,"religion-spirituality",{"id":133,"doc_module":4,"doc_module_name":25,"category_name":136,"show_sort_weight":133,"slug":137},"World Cup","world-cup",{"id":139,"doc_module":4,"doc_module_name":25,"category_name":140,"show_sort_weight":139,"slug":141},10,"Lifestyle","lifestyle",{"id":143,"doc_module":4,"doc_module_name":25,"category_name":144,"show_sort_weight":113,"slug":145},19,"General","general"]