[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-650809-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-650809-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","engineering-drafting-policies-and-procedures","Engineering Drafting Policies and Procedures","","Engineering Drafting Policies and Procedures provides direction for Airway Facilities personnel requiring engineering drafting services. It defines the purpose, distribution, cancellation of a prior order, and detailed responsibilities across Engineering Drafting Section and multiple engineering branches. The document specifies workflows for redlining drawings, indexing and filing drawing and specification data, managing drawing and specification numbers, maintaining drawing database references, and producing construction drawings using a high-speed printer, alongside budgeting, funding control, and project authorization requirements for both F&E and Operations funded work.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/engineering-drafting-policies-and-procedures/650809/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/engineering-drafting-policies-and-procedures/650809.png","ImageObject",300,407,{"name":42,"@type":43},"Alex Sinclair","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-26","2026-10-24",true,{"@type":52,"interactionType":53,"userInteractionCount":26},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What is the purpose of this order?","Question",{"text":62,"@type":63},"It provides direction to Airway Facilities personnel requiring Engineering Drafting Services.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"Which prior order does this document cancel?",{"text":67,"@type":63},"It cancels Order so 6083.1, Maintenance of Airway Facilities Drawings, dated December 11, 1981.",{"name":69,"@type":60,"acceptedAnswer":70},"How are engineering drafting costs and resources handled for F&E and Operations funded work?",{"text":71,"@type":63},"For F&E funded drafting, engineering drafting manpower and related printing/supply costs are included in F&E budget estimates with separate line items, and funding is managed within authorized limits. For Operations funded drafting, drafting manpower and costs are included in the Electronic Establishment Engineering Branch Operations Budget with requirements submitted by branches to ASO-430.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},650809,1793004226,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":26,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":144,"read_time":108},1099523882182,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","4/30/84  \n# SUBJ:ENGINEERING DRAFTING POLICIES AND PROCEDURES              \n\n## 1.  PURPOSE.  This order provides direction to Airway Facilities personnelrequiring Engineering Drafting Services.\n\n*  2.  DISTRIBUTION.  This order is distributed to Regional Airway Facilities Division,section leve1;Regional Logistics Division,section level;and all Airway FacilitiesSectors and Sector Field Offices.  \n3.  CANCELLATION.  This order cancels Order so 6083.1,Maintenance of AirwayFacilities Drawings,dated December 11,1981.  \n4.  RESPONSIBILITIES.  \na.   Engineering Drafting Section.The Engineering Drafting Section shallprovide drafting services for the Electronic Establishment Engineering Branch,Environmental Establishment Engineering Branch,Maintenance Program Branch,Programand Planning Branch,and the Airway Facilities Sectors.This section will beresponsible for the indexing and filing of drawings/aperture cards,logging andassignment of drawing numbers,logging and assignment of specification numbers,maintenance of the data base referencing of drawings,stocking of specifications,and the printing of construction drawings by the use of the \"Quantimatic\"highspeed printer.  \nb.  Electronic Establishment Engineering Branch.  The Electronic EstablishmentEngineering Branch is responsible for the development of electronic installationdesigns for the establishment and modernization of facilities under the F&E Program.Upon completion of a project,the responsible onsite engineer(work order carrier)wil1 \"redline\"two sets of drawings.  One set will remain at the site for referenceand the other set will be forwarded to the parent regional Branch office.Thedesign engineer will review the \"redlines\"and forward them to the EngineeringDrafting Section.Each design engineer has responsibility for the initiation ofdesigns that will use the most productive techniques available in the developmentof installation and regional standard drawings.  \nC.Environmental Establishment Engineering Branch.The EnvironmentalEstablishment Engineering Branch is responsible for the development of civi1,mechanical,and electrical designs for the establishment and modernization offacilities under the F&E Program.  Upon completion of a project,the responsibleonsite engineer(resident engineer)wil1 \"redline\"two sets of drawings.One setwill remain at the site for reference and the other set will be forwarded to theparent regional Branch office.The design engineer will review the \"redlines\"andforward them to the Engineering Drafting Section.Each design engineer hasresponsibility for the initiation of designs that will use the most productivetechniques available in the development of facility and regional standard drawings.  *  \n*   d.Maintenance Program Branch.The Maintenance Program Branch is responsiblefor the development of electronic,civil,structural,mechanical,and electricaldesigns for projects funded under the Operations Budget.This branch will also beresponsible for \"redlining\"two sets of all Operations Budget project drawings.One setwill be furnished to the Engineering Drafting Section and one set will be retained at thesite for reference.Each design engineer has the responsibility for the initiationof designs that will use the most productive techniques available in the develop-ment of facility improvement drawings.  \ne.  Program and Planning Branch(Facilities Planning Section).  The FacilitiesPlanning Section of the Program and Planning Branch is responsible for thedevelopment of siting plans for navigational,communications,and radar locations,and responsible for initiation of plans that use the most productive techniquesavailable in the development of the required drawings.  \nSector Field 0ffice(SFO)and facilities are all responsibile for maintaining up-to-f.Airway Facilities Sector(Field Organization).The Airway Facilities Sector,date facility drawings that are essential to the effective maintenance and restora-tion of the facility.Drawings that are revised in the field sh","cbCaimXjDWtrAM8J","https://ap.wps.com/l/cbCaimXjDWtrAM8J","pdf",1831921,16,"English","# Purpose\n# Distribution\n# Cancellation\n# Responsibilities\n## Engineering Drafting Section\n## Engineering Branches and Redlining Responsibilities\n# Budgeting, Funding, and Coding\n## F&E Funded Engineering Drafting\n## Operations Funded Engineering Drafting","[{\"question\":\"What is the purpose of this order?\",\"answer\":\"It provides direction to Airway Facilities personnel requiring Engineering Drafting Services.\"},{\"question\":\"Which prior order does this document cancel?\",\"answer\":\"It cancels Order so 6083.1, Maintenance of Airway Facilities Drawings, dated December 11, 1981.\"},{\"question\":\"How are engineering drafting costs and resources handled for F\\u0026E and Operations funded work?\",\"answer\":\"For F\\u0026E funded drafting, engineering drafting manpower and related printing/supply costs are included in F\\u0026E budget estimates with separate line items, and funding is managed within authorized limits. For Operations funded drafting, drafting manpower and costs are included in the Electronic Establishment Engineering Branch Operations Budget with requirements submitted by branches to ASO-430.\"}]","Engineering Drafting Policies and Procedures | PDF",1792846393]