[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-663603-105":59,"doc-detail-663603-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","elliston-parade-mindarie-wa-site-location-plan-development-approval","Elliston Parade - Mindarie WA Site Location Plan - Development Approval","","Development approval drawings for the Peter Moyes Anglican Community School (Stage 1) at Elliston Parade, Mindarie WA, including a site location plan and multiple site plans. The sheets specify existing conditions and proposed works, with demolition plan legends and demolition notes detailing removal scope such as flooring make-good, stairs, doors, windows, handrails, balustrades, services, and existing finishes. Scales, sheet references, drawing numbers, and phase context are provided by the architectural firm eiw architects.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/elliston-parade-mindarie-wa-site-location-plan-development-approval/663603/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/elliston-parade-mindarie-wa-site-location-plan-development-approval/663603.png","ImageObject",300,407,{"name":92,"@type":93},"Rainbow Cat","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What location and project stage do these drawings cover?","Question",{"text":112,"@type":113},"The drawings relate to Peter Moyes Anglican Community School - Stage 1 at Elliston Parade, Mindarie WA, including site location and site plans for development approval.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What is included in the demolition plan scope?",{"text":117,"@type":113},"The demolition plan notes and legend cover removal and make-good of items such as existing stairs, handrails, built-in joinery, doors and windows, existing finishes, and services made redundant by demolition.",{"name":119,"@type":110,"acceptedAnswer":120},"What drawing information is provided on the sheets?",{"text":121,"@type":113},"The document includes legends, drawing numbers (e.g., SK1.01, SK1.02, SK1.03, SK1.04, SK1.06), plot dates, scales (e.g., 1:1000, 1:200, 1:100), and checked/designed/drawn fields.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},663603,1793229521,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144},962090769181,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","SITE LOCATION PLAN LEGEND  \n□ EXISTING BUILDING  \nEXISTING BUILDING REFURBISHMENT  \nPROPOSED NEW BUILD  \nFLEPAH C:UsersDrea\\Documents\\EIW-2518-MDA_CentralBLDG-RVT25_260429_dreaSV9QQ.t  \nISSUED FOR DEVELOPMENT APPROVAL  \nISSUE  \nDESCRIPTION  \nPROJECT STATUS  \nB  \neiw  \nPROJECT.  \nANGLISCHOOLS  \nPETER MOYES ANGLICAN COMMUNITY SCHOOL-  \nSTAGE 1  \nPLOT DATE:17/06/20269:21:25AM  \nELLISTON PARADE,MINDARIE WA        \nSITE LOCATION PLAN  \n| DRAWN:  \u003Cbr>RA/DD   | DESIGNED:  \u003Cbr>PI   | CHECKED  \u003Cbr>PI/SP   | DRAWINGNo:  \u003Cbr>SK1.01   |\n| --- | --- | --- | --- |\n| JOB DATE:  \u003Cbr>11/06/2026   | SCALE:  \u003Cbr>1:1000   | JOB NUMBER:  \u003Cbr>2518   |  |\n| SHEETREFERENCE  \u003Cbr>SK1.01  \u003Cbr>2518-   |  |  |  |\n\n50m  \nPROPOSED SITE LOCATION PLAN  \nSCALE 1:1000  \nTHIS ISAREVIT DRAWING DO NOT AMEND MANUALLY eiw architects  \nSITE DEMO PLAN LEGENDDEMOLISHEXISTING BUILDING DEMOLISHEDEXISTING CONCRETE REMOVEDEXISTING LANDSCAPED AREASCLEAREDFOR PROPOSED WORKSEXISTING RETAINING/GARDENEXISTING WALLS/CURTAINWALLS/STAIRS/SAND REMOVEDWALLS/DOORSNINDOWSREMOVEDEXISTING GARDEN BEDEXISTING SPOT LEVELEXISTING SITE CONTOUREXISTING PRIMARYBUILDING双SOUTH OVAL PLAYINGEXISTING PLAYEQUIPMENT REMOVEDFIELD          ELLISTON PARADE,MINDARIE WA     ①SITE DEMOLITION PLAN200010000mmSCALE 1:200SCALE 1:200@A11  \nEXISTING TREE REMOVEDEXISTING TREEEXISTING GRASSEXISTING PAVINGEXISTING CONCRETEEXISTING ASPHALT/BITUMENEXISTING STAIREXISTING SANDREMOVED  \nEXISTING SHADE SAILS_REMOVED ANDASSOCIATEDCOLUMNS REMOVED  \nEXISTING COVERED BIKERACKS DISASSEMBLEDAND RELOCATED BYSCHOOL\\  \n45.50区P  \nEXISTING FENCEREMOVEDEXISTING SHED  \nFLE PAH C:UsersDrea\\DocumentsEIW-2518-MD-A_CentraBLDG-RVT25_260429_dreaSV6QQ  \nEXISTING GRASS  \nEXISTING FENCEREMOVED  \nOUTLINE OF PROPOSEDBUILDING EXTERNAL WALL·SHOWN DASHED  \n11/06/2026ISSUEDFOR DEVELOPMENT APPROVAL               DATEISSUEDESCRIPTIONPROJECT STATUSAeiwEXISTING HARDCOURT TOPROJECT.  \n47.75BE ENCLOSEDANGLISCHOOLS  \nPETER MOYES ANGLICAN COMMUNITY SCHOOL-STAGE 1  \nPLOTDATE:11/06/2026 12:26:57PM  \nSITE DEMOLITION PLAN  \n\n| DRAWN  \u003Cbr>RA/DD   | DESIGNED:  \u003Cbr>PI   | CHECKED:  \u003Cbr>PI/SP   | DRAWINGNo  \u003Cbr>SK1.04   |\n| --- | --- | --- | --- |\n| JOB DATE:  \u003Cbr>11/06/2026   | SCALE:  \u003Cbr>1:200   | JOB NUMBER  \u003Cbr>2518   |  |\n| SHEETREFERENCE  \u003Cbr>SK1.04  \u003Cbr>2518-   |  |  |  |\n\nTHIS IS A REVIT DRAWING DO NOT AMEND MANUALLY eiw architects  \nSITE PLAN-EX.PRIMARY BLDG  \n\n| DRAWN:  \u003Cbr>RA/DD   | DESIGNED:  \u003Cbr>PI   | CHECKED:  \u003Cbr>PI/SS   | DRAWING No  \u003Cbr>SK1.02   |\n| --- | --- | --- | --- |\n| JOB DATE:  \u003Cbr>11/06/2026   | SCALE:  \u003Cbr>1:200   | JOB NUMBER:  \u003Cbr>2518   |  |\n| SHET REFERENCE:  \u003Cbr>2518-   SK1.02   |  |  |  |\n\nTHIS ISA REVIT DRAWING DO NOT AMEND MANUALLY eiw architects  \nFILEPAT: C:UsersIreka\\DocumentsEIW-2518-MD-A_CentraIBLDG-RVT25_260429_rekaL5V4K.rv  \nPLOTDATE:17/06/2026 9:43:56 AM  \nSITE PLAN-PRIMARY EXTENSION&  \n| ENCLOS  \u003Cbr>RADD   | EDCOUR  \u003Cbr>PI   | TEcKED:  \u003Cbr>PISP   | SK1.03   |\n| --- | --- | --- | --- |\n| JOB DATE  \u003Cbr>11/06/2026   | SCALE:  \u003Cbr>1:200   | JOBNUMBER  \u003Cbr>2518   |  |\n| SHEET REFERENCE:  \u003Cbr>SK1.03  \u003Cbr>2518-   |  |  |  |\n\nSITE PLAN-PRIMARY EXTENSION &  \nENCLOSED COURT  \nSCALE 1:200  \nTHIS ISAREVIT DRAWING DO NOT AMEND MANUALLY eiw architects  \n| DEMOLITION PLAN NOTES   | DEMOLITION PLAN LEGEND   |\n| --- | --- |\n| ALLOW FOR ALLFLOORING MAKE-GOOD WORKS  \u003Cbr>REMOVE EXISTING STAIRS,HANDRAILS,  \u003Cbr>REMOVE EXISTING BUILT-IN JOINERY,SHELVING,  \u003Cbr>3→  \u003Cbr>PINBOARDS,WHITEBOARDS,BAGHOOKS AND  \u003Cbr>RESULTINGFROM DEMOLITION,INCLUDING PATCHING,  \u003Cbr>BALUSTRADES,TACTILE INDICATORS,STAIR  \u003Cbr>6→  \u003Cbr>NOSINGS,AND ASSOCIATED FINISHES AS  \u003Cbr>ASSOCIATED FIXINGS THROUGHOUT.  \u003Cbr>INFILLFLOORING,TRANSITION STRIPS AND  \u003Cbr>ASSOCIATED WORKS NECESSARY TO PROVIDE A  \u003Cbr>INDICATED.  \u003Cbr>REMOVE ALLFIXTURES,FITTING,EQUIPMENT,  \u003Cbr>COMPLETE FINISHED FLOOR SURFACE.  \u003Cbr>PIPEWORK,CONDUITS,DUCTWORKAND ASSOCIATED  \u003Cbr>REMOVE EXISTINGHANDRAILS,BALUSTRADES,  \u003Cbr>REMOVE EXISTING DOORS,WINDOWS AND ASSOCIATED  \u003Cbr>7→TACTILE INDICATORS,STAIR NORSINGS AND  \u003Cbr>4","cbCair6TveanA68f","https://ap.wps.com/l/cbCair6TveanA68f","pdf",16420273,35,"English","# SITE LOCATION PLAN\n## SITE DEMOLITION PLAN\n## SITE PLAN - PRIMARY EXTENSION & ENCLOSED COURT\n## DEMOLITION PLAN NOTES\n## SITE PLAN - EX. PRIMARY BUILDING","[{\"question\":\"What location and project stage do these drawings cover?\",\"answer\":\"The drawings relate to Peter Moyes Anglican Community School - Stage 1 at Elliston Parade, Mindarie WA, including site location and site plans for development approval.\"},{\"question\":\"What is included in the demolition plan scope?\",\"answer\":\"The demolition plan notes and legend cover removal and make-good of items such as existing stairs, handrails, built-in joinery, doors and windows, existing finishes, and services made redundant by demolition.\"},{\"question\":\"What drawing information is provided on the sheets?\",\"answer\":\"The document includes legends, drawing numbers (e.g., SK1.01, SK1.02, SK1.03, SK1.04, SK1.06), plot dates, scales (e.g., 1:1000, 1:200, 1:100), and checked/designed/drawn fields.\"}]","Elliston Parade - Mindarie WA Site Location Plan - Development Approval | PDF",88]