[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-663536-105":59,"doc-detail-663536-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","element-fabrication-procedure-wi-750-001-work-instruction","ELEMENT Fabrication Procedure - WI 750-001 - Work instruction","","Work instruction WI-750-001 defines the basic flow for fabricating an unpainted product through a milling machine and establishes how fabrication processes are controlled. It sets the purpose to align customer requirements with shop execution, including communication, inspection, and verification against customer drawings. The document specifies scope covering cutting, drilling, fitting, and welding prior to painting, records machine hours on the traveler, and lists responsibilities, tools/gages/fixtures, and key safety requirements.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/element-fabrication-procedure-wi-750-001-work-instruction/663536/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/element-fabrication-procedure-wi-750-001-work-instruction/663536.png","ImageObject",300,407,{"name":92,"@type":93},"Fahsai","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":81},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the purpose of WI-750-001?","Question",{"text":112,"@type":113},"The procedure controls fabrication processes and ensures customer requirements are communicated to the shop, with inspection results provided against those requirements.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What operations are included in the scope before painting?",{"text":117,"@type":113},"Cutting, drilling, fitting, and welding operations are performed before sending the product to painting.",{"name":119,"@type":110,"acceptedAnswer":120},"How is the fabrication traveler used and what records must be maintained?",{"text":121,"@type":113},"Record machine hours on the traveler (F-750-001) until calibration, and the traveler is signed during key steps including material verification and inspections of layout, fit-up, and welds.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},663536,1793228981,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":81,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":81,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":39},549768702563,"https://ap-avatar.wpscdn.com/avatar/8000c4aa63b76e948b?x-image-process=image/resize,m_fixed,w_180,h_180&k=1786536092046926083","TITLE of ELEMENT Fabrication Procedure  \nWORK INSTRUCTION  \nWI-750-001  \n\n| Revision: 121510 Initial Trial | Page 1 of 3 |\n| --- | --- |\n\nBlue text is used as an example.  \n1.0 PURPOSE  \n1.1 (What is the reason for writing this work instruction) Start with the following statement: “The purpose of this document is to provide instructions for- - - - - - - - .”  \nThis work instruction describes the basic flow of an unpainted product through a milling machine.  \n1.2 Be as specific as you need to be to define the purpose of the document.  \nThe Purpose of this procedure is to control the fabrication processes. This procedure provides for the communication of customer requirements to the shop, and inspection of product to the customer requirements.  \n2.0 SCOPE  \n2.1 (Define the area or process that this instruction applies to)  \nCutting, drilling, fitting, and welding operations before sending to painting.  \n3.0 RECORDS  \n3.1 (Indicate specific type of records to be maintained and where they will be maintained)  \nRecord machine hours on the traveler (F-750-001) to track usage until calibration.  \n4.0 ASSOCIATED DOCUMENTS  \n4.1 (Reference upward to the procedures that the work instruction is controlled by and reference forms by control number used to create records. Also, reference other documents, standards or information that are relevant. )  \nF-750-001 Traveler, MP-750 Control of Production and Service Provision,“Rejected” Tag, Customer Drawing, etc.  \n5.0 DEFINITIONS  \n5.1 (Define any terms and phrases that might be unique to this instruction or to this particular industry)  \nAppropriate drill components to match requirements.  \n6.0 RESPONSIBILITY  \n6.1 (List department(s) or functions responsible for maintaining these instructions)  \nIt is the responsibility of the shop supervisor to maintain this procedure. The Shop supervisor is responsible to assign and train inspectors. It is the responsibility ofthe welder to fabricate the part to the customer drawing and to follow this procedure and not move on to another step without inspection. The inspector must inspect the parts to the customer drawing.  \n7.0 TOOLS, GAGES, FIXTURES  \n7.1 (List all unique tools required to perform tasks as indicated in this work instruction)  \nAppropriate drill components to match requirements.  \n8.0 SAFETY REQUIREMENTS  \n8.1 (List all necessary safety precautions that employees must comply with and all safety equipment that must be used while following the operations specified in this work instruction)  \nSafety glasses, welding shields, etc.  \nTITLE of ELEMENT Fabrication Procedure  \nWORK INSTRUCTION 12-15-2010  \n\n| Revision: 121510 Initial Trial | Page 2 of 3 |\n| --- | --- |\n\n9.0 INSTRUCTIONS  \n9.1 (List all steps to be taken to complete the scope of this work instruction, in the exact sequence necessary. Work instructions may be in the form of flow charts, bullet instructions, text, photos, digitized images, numbered instructions or any combination of all, as long as the instructions are clear, crisp and do the job as intended)  \nF-750-001 Traveler  \n9.2 The fabrication shop is given a Job Pack to fabricate a product.  \n9.3 The Shop Lead man looks at the drawings, bills of material, and cut sheets to verify that thereis adequate information to fabricate the part.  \n9.4 The shop lead man gets the materials from the storage area and verifies that they are correct to the BOM and Cut sheet requirements and signs the fabrication traveler (F-750-001) .  \n9.5 The shop lead man gives the materials and job pack to a welder to fabricate the parts to the drawings. The welder completes the layout.  \n9.6 The shop supervisor or lead man inspects the layout of the part to the drawing and signs the fabrication traveler (F-750-001) .  \n9.7 The welder cuts the material to match the drawing. The welder or cuts or drills holes in the material to match the drawing.  \n9.8 The welder fits up the parts as described on the drawing. If the welder does not understand the drawin","cbCaikGhgt5fCpqB","https://ap.wps.com/l/cbCaikGhgt5fCpqB","pdf",129095,"English","# 1.0 Purpose\n## 1.1 Purpose statement\n# 2.0 Scope\n## 2.1 Applicable operations before painting\n# 3.0 Records\n## 3.1 Traveler machine hours recording\n# 4.0 Associated Documents\n## 4.1 Referenced controlled procedures and records\n# 5.0 Definitions\n## 5.1 Industry/part-specific terms\n# 6.0 Responsibility\n## 6.1 Roles for supervisors, welders, and inspectors\n# 7.0 Tools, Gages, Fixtures\n## 7.1 Required drill components\n# 8.0 Safety Requirements\n## 8.1 PPE and safety equipment\n# 9.0 Instructions\n## 9.1 Step-by-step fabrication flow","[{\"question\":\"What is the purpose of WI-750-001?\",\"answer\":\"The procedure controls fabrication processes and ensures customer requirements are communicated to the shop, with inspection results provided against those requirements.\"},{\"question\":\"What operations are included in the scope before painting?\",\"answer\":\"Cutting, drilling, fitting, and welding operations are performed before sending the product to painting.\"},{\"question\":\"How is the fabrication traveler used and what records must be maintained?\",\"answer\":\"Record machine hours on the traveler (F-750-001) until calibration, and the traveler is signed during key steps including material verification and inspections of layout, fit-up, and welds.\"}]","ELEMENT Fabrication Procedure - WI 750-001 - Work instruction | PDF"]