[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-109018-en":3,"doc-seo-109018-105":30,"detail-sidebar-cat-0-en-105":87},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":4,"category_id":11,"category_name":12,"doc_title":13,"doc_description":14,"doc_content":15,"file_id":16,"file_url":17,"file_type":18,"file_size":19,"view_count":4,"is_deleted":4,"is_public":20,"is_downloadable":20,"audit_status":20,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":27,"seo_description":14,"update_tm":28,"read_time":29},109018,1099514068365,"Aurelia","https://ap-avatar.wpscdn.com/avatar/10000253d8d9f28188e?_k=1776742907772140068",8,"Research & Report","Electronic Government Procurement Implementation Types - Options for Africa","The report examines electronic government procurement (e-GP) implementation types and evaluates practical options for African countries. It consolidates World Bank and consulting expertise, includes study context, objectives, and an overview of three implementation types, and reviews the current state of IT security relevant to e-GP. It also draws on an e-GP developers market survey and presents cost modeling, including benefit-cost ratio considerations, to support decision-making on how to structure and implement e-procurement systems.","Pub lic Disclosure Authorized Pub lic Disclosure Authorized Pub lic Disclosure Authorized Pub lic Disclosure Authorized  \nElectronic Government Procurement Implementation Types: Options for Africa  \nAUTHORS: Blandine Wu Chebili-World Bank Group Hunt La Cascia-World Bank Group François Collineau -CKS Consulting Arnaud Salomon -CKS Consulting Baptiste Calvet-CKS Consulting  \nYoann Moreau-SQUAD  \n© 2021 International Bank for Reconstruction and Development / The World Bank 1818 H Street NW, Washington DC 20433  \nTelephone: 202-473-1000; [Internet: www.worldbank.org](Internet: www.worldbank.org)  \n[Some rights reserved.](Some rights reserved.)  \nThis work is a product of the staff of The World Bank with external contributions. The findings, interpretations, and conclusions expressed in this work do not necessarily reflect the views of The World Bank, its Board of Executive Directors, or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries.  \nNothing herein shall constitute or be considered to be a limitation upon or waiver of the privileges and immunities of The World Bank, all of which are specifically reserved.  \nRights and Permissions:  \nThis work is available under the Creative Commons Attribution 3.0 IGO license (CC BY 3.0 IGO), [http:// creativecommons.org/licenses/by/3.0/igo. Under the](http:// creativecommons.org/licenses/by/3.0/igo. Under the) Creative Commons Attribution license, you are free to copy, distribute, transmit, and adapt this work, including for commercial purposes, under the following conditions:  \nAttribution—Please cite the work as follows: 2021. E-Procurement Implementation Type Report.  \nWashington, DC: World Bank.  \nTranslations—If you create a translation of this work, please add the following disclaimer along with the attribution: This translation was not created by The World Bank and should not be considered an official World Bank translation. The World Bank shall not be liable for any content or error in this translation.  \nAdaptations—If you create an adaptation of this work, please add the following disclaimer along with the attribution: This is an adaptation of an original work by The World Bank. Views and opinions expressed in the adaptation are the sole responsibility of the author or authors of the adaptation and are not endorsed by The World Bank.  \nThird-party content—The World Bank does not necessarily own each component of the content contained within the work. The World Bank therefore does not warrant that the use of any thirdparty-owned individual component or part contained in the work will not infringe on the rights of those third parties. The risk of claims resulting from such infringement rests solely with you. If you wish to reuse a component of the work, it is your responsibility to determine whether permission is needed for that reuse and to obtain permission from the copyright owner. Examples of components can include, but are not limited to, tables, figures, or images.  \nAll queries on rights and licenses should be addressed to World Bank Publications, The World Bank Group, 1818 H Street NW, Washington, DC 20433, USA; e-mail: [pubrights@worldbank.org](pubrights@worldbank.org).  \nELECTRONIC GOVERNMENT PROCUREMENT IMPLEMENTATION TYPES: OPTIONS FOR AFRICA I 3  \nAcknowledgments  \nThis report was authored by a World Bank team comprising Blandine Wu Chebili (Sr. Procurement Specialist, EPSPA) and Hunt La Cascia (Sr. Procurement Specialist, EPSPA), and team from CKS Consulting comprising François Collineau (Director Expert), Arnaud Salomon (Director Expert), Baptiste Calvet (Technology Expert) and from SQUAD company, Yoann Moreau (Security Expert) .  \nThe report benefited from the input","cbCaiibzXiKnsvuJ","https://ap.wps.com/l/cbCaiibzXiKnsvuJ","pdf",2594865,1,155,"English","en",105,"# Acknowledgments\n# Acronyms\n# Executive Summary\n# Context, objectives, and content of the study\n# The three implementation types\n# State of the art in IT security\n# e-GP developers market survey\n# Cost modeling\n# Benefit-Cost Ratio (BCR)","[{\"question\":\"What are the three e-GP implementation types presented in the report?\",\"answer\":\"The report includes a market survey of e-GP developers and incorporates cost modeling to inform decisions, including a benefit-cost ratio component.\"},{\"question\":\"How does the report address IT security for e-GP?\",\"answer\":\"It includes a section on the state of the art in IT security, aligned with the needs and risks of e-procurement systems.\"}]","Electronic Government Procurement Implementation Types - Options for Africa | PDF",1784475895,391,{"code":4,"msg":31,"data":32},"ok",{"site_id":24,"language":23,"slug":33,"title":13,"keywords":34,"description":14,"schema_data":35,"social_meta":82,"head_meta":84,"extra_data":86,"updated_unix":28},"electronic-government-procurement-implementation-types-options-for-africa","",{"@graph":36,"@context":81},[37,54,68],{"@type":38,"itemListElement":39},"BreadcrumbList",[40,44,48,51],{"item":41,"name":42,"@type":43,"position":20},"https://docshare.wps.com","Home","ListItem",{"item":45,"name":46,"@type":43,"position":47},"https://docshare.wps.com/document/","Document",2,{"item":49,"name":12,"@type":43,"position":50},"https://docshare.wps.com/document/research-report/",3,{"item":52,"name":13,"@type":43,"position":53},"https://docshare.wps.com/document/electronic-government-procurement-implementation-types-options-for-africa/109018/",4,{"url":52,"name":13,"@type":55,"author":56,"headline":13,"publisher":58,"fileFormat":61,"inLanguage":23,"description":14,"dateModified":62,"datePublished":62,"encodingFormat":61,"isAccessibleForFree":63,"interactionStatistic":64},"DigitalDocument",{"name":9,"@type":57},"Person",{"url":41,"name":59,"@type":60},"DocShare","Organization","application/pdf","2026-07-19",true,{"@type":65,"interactionType":66,"userInteractionCount":4},"InteractionCounter",{"@type":67},"ViewAction",{"@type":69,"mainEntity":70},"FAQPage",[71,77],{"name":72,"@type":73,"acceptedAnswer":74},"What are the three e-GP implementation types presented in the report?","Question",{"text":75,"@type":76},"The report includes a market survey of e-GP developers and incorporates cost modeling to inform decisions, including a benefit-cost ratio component.","Answer",{"name":78,"@type":73,"acceptedAnswer":79},"How does the report address IT security for e-GP?",{"text":80,"@type":76},"It includes a section on the state of the art in IT security, aligned with the needs and risks of e-procurement systems.","https://schema.org",{"og:url":52,"og:type":83,"og:title":13,"og:site_name":59,"og:description":14},"article",{"robots":85,"canonical":52},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":88},[89,93,97,101,106,111,116,119,124,127,131],{"id":20,"doc_module":4,"doc_module_name":46,"category_name":90,"show_sort_weight":91,"slug":92},"Story & Novel",90,"story-novel",{"id":47,"doc_module":4,"doc_module_name":46,"category_name":94,"show_sort_weight":95,"slug":96},"Literature",80,"literature",{"id":53,"doc_module":4,"doc_module_name":46,"category_name":98,"show_sort_weight":99,"slug":100},"Exam",70,"exam",{"id":102,"doc_module":4,"doc_module_name":46,"category_name":103,"show_sort_weight":104,"slug":105},5,"Comic",60,"comic",{"id":107,"doc_module":4,"doc_module_name":46,"category_name":108,"show_sort_weight":109,"slug":110},6,"Technology",50,"technology",{"id":112,"doc_module":4,"doc_module_name":46,"category_name":113,"show_sort_weight":114,"slug":115},7,"Healthcare",40,"healthcare",{"id":11,"doc_module":4,"doc_module_name":46,"category_name":12,"show_sort_weight":117,"slug":118},30,"research-report",{"id":120,"doc_module":4,"doc_module_name":46,"category_name":121,"show_sort_weight":122,"slug":123},9,"Religion & Spirituality",20,"religion-spirituality",{"id":122,"doc_module":4,"doc_module_name":46,"category_name":125,"show_sort_weight":122,"slug":126},"World Cup","world-cup",{"id":128,"doc_module":4,"doc_module_name":46,"category_name":129,"show_sort_weight":128,"slug":130},10,"Lifestyle","lifestyle",{"id":132,"doc_module":4,"doc_module_name":46,"category_name":133,"show_sort_weight":102,"slug":134},19,"General","general"]