[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-650497-105":59,"doc-detail-650497-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","electrical-service-requirements-esr-2022-fourth-quarter-issue","Electrical Service Requirements (ESR) - 2022 Fourth Quarter Issue","","Revision summary for Southern California Edison’s Electrical Service Requirements (ESR) covering the 2022 fourth quarter issue effective October 28, 2022. The document explains the purpose of communicating new ESR revisions, describes four revision types (Admin, Technical, New, Pilot), and clarifies how change bars indicate administrative and technical updates. It also provides a table of chapter-level updates with revision descriptions and includes guidance for addressing technical questions, contacting standards staff, and submitting address corrections.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/electrical-service-requirements-esr-2022-fourth-quarter-issue/650497/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/electrical-service-requirements-esr-2022-fourth-quarter-issue/650497.png","ImageObject",300,407,{"name":92,"@type":93},"Cart","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the effective date and scope of this ESR revision summary?","Question",{"text":112,"@type":113},"The revision summary is effective October 28, 2022 and covers the 2022 fourth quarter issue changes to the Electrical Service Requirements (ESR).","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How does the document define the four revision types?",{"text":117,"@type":113},"It defines four types: Admin (does not significantly affect design/operations and does not require SRT or management approval), Technical (engineering changes requiring SRT and management approval), New (new standard requiring approval), and Pilot (in-field evaluation marked with a PILOT watermark).",{"name":119,"@type":110,"acceptedAnswer":120},"How are change bars used to identify revisions?",{"text":121,"@type":113},"Admin and Technical revisions to existing standards or pilot projects are identified with change bars in the left margin, while new standards and pilot projects do not receive change bars; editorial corrections also do not receive change bars.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},650497,1792833934,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145},18829141979164,"https://eur-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","SOUTHERN CALIFORNIA EDISON  \nTRANSMISSION AND DISTRIBUTION  \nElectrical Service Requirements  \n(ESR)  \n2022—FOURTH QUARTER ISSUE  \nOctober 28, 2022  \nNote: Printed and downloaded versions of this document are uncontrolled. In the case of a conflict between printed/downloaded and electronic versions of this document, the controlled version published on the Company portal prevails.  \n►SCE Public◄  \nCopyright © 2022 Southern California Edison. All rights reserved.  \nNo part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, without the prior written permission of Southern California Edison.  \nDirect technical questions/comments to:  \nAlaira Bilek, Manager, T/D Standards & Tech Transfer Engineering  \nPAX 54156 • Voice: (714) 702-4763 • [Email:](Email: Alaira.Bilek@sce.com)[ Alaira.Bilek@sce.com](Email: Alaira.Bilek@sce.com)  \nPublished by:  \nTransmission & Distribution • Southern California Edison  \nStandards & Publications, 1 Innovation Way, Pomona, California 91768-2560  \nElectrical Service Requirements  \n(ESR)  \nRevision Summary  \n2022 Fourth Quarter Issue  \nEffective Date: October 28, 2022  \nOverview  \nThe main purpose of this revision summary is to describe new revisions to this manual. (Some or all of the information may have been previously communicated to field personnel by other means.)  \nTable 1 lists the revisions. Clickable page/sheet numbers link directly to individual revisions or the first of a series of revisions.  \nTable 2 defines four types of revisions: (1) Admin (Administrative),(2) Technical,(3) New, and (4) Pilot.  \nNote: Admin and Technical revisions to existing standards or existing Pilot projects are identified with change bars  in the left margin. New standards (as well as new pilot projects) do not receive  \nchange bars. Editorial revisions, such as corrections to spelling, do not receive change bars. A Getting Help section provides contact information.  \nTable 1: Revisions  \n\n| Chapter | Page | Description | Type |\n| --- | --- | --- | --- |\n| ESR-1 | 4, 5 | Updated service center phone number for Huntington Beach, Kernville, and Tehachapi. | Admin |\n| ESR-1 | 25, 26 | Updated customer NGOM labeling requirements. | Admin |\n| ESR-3 | 15 | Added clarity to the requirements and specifications of electric meter room doors. | Admin |\n| ESR-3 | 18 | Added verbiage to indicate that Multi Family units require a unit identification at each entry/door. | Admin |\n| ESR-3 | 46, 47 | Updated Note 11 to include detailed\u003Cbr>requirements/specifications for labeling. | Admin |\n| ESR-4 | 11 | Added new Note 6 to indicate that the Applicant shall provide the location of the required personnel door and the additional equipment doors on the drawings. | Admin |\n| ESR-5 | 14 | Updated meter room specifications to require panic-bar hardware to be used in all mater room locations. | Admin |\n| ESR-6 | 14, 15 | Added new Note 14 to indicate that switchgear rated 800 A and below shall be provided with a lug landing device in the Utility Pull Section. | Admin |\n| ESR-9 | 8 | Updated COTR requirement \\#17 to indicate that the Applicant shall provide the location of the required personnel door and the additional equipment doors on the drawings. | Admin |\n\nElectrical Service Requirements  \nPage 1 ►SCE Public◄  \nTable 1: Revisions (Continued)  \n\n| Chapter | Page | Description | Type |\n| --- | --- | --- | --- |\n| ESR-9 | 7, 8 | Corrected typos | Admin |\n\nElectrical Service Requirements  \nPage 2 ►SCE Public◄  \n| Table 2: Revision Types\u003Cbr>Type Definition Admin Administrative revisions do not significantly affect design, construction, maintenance or operation of the electrical distribution, substation, and transmission systems. They do not require Standards Review Team (SRT) or management approval; however, they have been approved by other organizations, as appropriate. They may include updates to material codes, updates to references, updates to standards for clarity, or deletion","cbCailljyxujR1ma","https://ap.wps.com/l/cbCailljyxujR1ma","pdf",28558512,282,"English","# Revision Summary\n## Overview\n## Revision Types\n## Table 1: Revisions\n## Table 2: Revision Types\n## Getting Help","[{\"question\":\"What is the effective date and scope of this ESR revision summary?\",\"answer\":\"The revision summary is effective October 28, 2022 and covers the 2022 fourth quarter issue changes to the Electrical Service Requirements (ESR).\"},{\"question\":\"How does the document define the four revision types?\",\"answer\":\"It defines four types: Admin (does not significantly affect design/operations and does not require SRT or management approval), Technical (engineering changes requiring SRT and management approval), New (new standard requiring approval), and Pilot (in-field evaluation marked with a PILOT watermark).\"},{\"question\":\"How are change bars used to identify revisions?\",\"answer\":\"Admin and Technical revisions to existing standards or pilot projects are identified with change bars in the left margin, while new standards and pilot projects do not receive change bars; editorial corrections also do not receive change bars.\"}]","Electrical Service Requirements (ESR) - 2022 Fourth Quarter Issue | PDF",1792830068,711]