[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-662664-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-662664-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","electrical-project-drawings-project-scope-and-general-notes-for-bid","Electrical Project Drawings - Project Scope and General Notes - For Bid","","Electrical construction drawings and specifications for a defined project scope, including installation of new ground-mounted RTUs and a ground-mounted welding source capture system, along with new branch circuits from the existing “MDP” panel and installation of new breakers. General notes establish that EBS drawings convey design intent and required outcomes, and outline responsibilities for electrical routing, coordination, circuit sizing to NEC, outdoor labeling requirements, and grounding/bonding. Includes keyed sheet note requirements such as alternate bid for an upgraded welding source capture system.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/electrical-project-drawings-project-scope-and-general-notes-for-bid/662664/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/electrical-project-drawings-project-scope-and-general-notes-for-bid/662664.png","ImageObject",300,407,{"name":42,"@type":43},"Connor ","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":52,"interactionType":53,"userInteractionCount":30},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What does the project include under the scope of work?","Question",{"text":62,"@type":63},"The project includes installation of three new ground-mounted RTUs and one ground-mounted welding source capture system, plus new branch circuits from the existing “MDP” panel and installation of new breakers.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What is the contractor’s responsibility if field conditions require deviations from the drawings?",{"text":67,"@type":63},"If conditions require deviations, the contractor determines the appropriate deviation with approval from the owner; EBS is available to assist when issues arise.",{"name":69,"@type":60,"acceptedAnswer":70},"What requirements are stated for electrical routing and circuit sizing?",{"text":71,"@type":63},"The electrical contractor is responsible for all conduit/cable routing and must coordinate with other trades. Feeder wire and conduit sizes are referenced in the single-line diagram, and circuits not sized on the drawing must meet minimum NEC size requirements.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},662664,1793221366,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":30,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":106,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":79,"read_time":143},687207022233,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","THESE DRAW INGS AND SPECIFICAT IONS ARE NOT AUTHORIZED TO BE USED AS CONTRACT DOCUMENTS . THESE DRAW INGS HAVE BEEN PREPARED TO DEMONSTRATE COMPLIANCE WITH APPLICABLE CODES, AND ARE INTENDED TO PROV IDE THE AUTHORITIES HAVING JUR ISD ICT ION WITH INFORMATION TO DETERMINE CODE COMPL IANCE . THE INSTALLING CONTRACTOR IS RESPONSIBLE TO ENSURE THAT MEANS, METHODS, AND MATERIALS USED IN CONSTRUCT ION ARE INSTALLED IN ACCORDANCE W ITH ANY CONTRACTURAL AGREEMENT THAT MAY EX IST W ITH AN OWNER, CONSTRUCTION MANAGER, GENERAL CONTRACTOR, ETC .  \n| SCOPE OF WORK |\n| --- |\n| PROJECT INCLUDES INSTALLATION OF (3) NEW GROUND MOUNTED RTUs AND (1) GROUND MOUNTED WELDING SOURCE CAPTURE SYSTEM, INSTALLATION OF NEW BRANCH CIRCUITS FROM THE EXISTING \"MDP\" PANEL AND INSTALLATION OF NEW BREAKERS. |\n\n| GENERAL NOTES-OVERALL PROJECT |\n| --- |\n| A. EBS DRAWINGS INDICATE DESIGN INTENT AND REQUIRED OUTCOMES. IF CONDITIONS ARISE IN THE FIELD THAT REQUIRE DEVIATIONS FROM THE DRAWINGS IT IS ASSUMED THAT THE CONTRACTOR WILL DETERMINE THE APPROPRIATE DEVIATION WITH APPROVAL FROM THE OWNER. EBS IS AVAILABLE TO ASSIST WHEN REQUIRED IF ISSUES ARISE. |\n\n\n| GENERAL NOTES-POWER |  |\n| --- | --- |\n| A. | ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CONDUIT/CABLE ROUTING. COORDINATE ROUTING WITH ALL OTHER TRADES AND BUILDING CONDITIONS. |\n| B. | SEE SINGLE LINE DIAGRAM FOR FEEDER WIRE AND CONDUIT SIZE. ALL CIRCUITS NOT SIZED ON DRAWING SHALL BE INSTALLED TO MEET MINIMUM SIZE REQUIRED BY NEC. |\n| C. | PROVIDE MOTOR STARTERS FOR EQUIPMENT AS INDICATED ON DRAWINGS. COORDINATE ANY INTERLOCKING WIRING WITH HVAC CONTRACTOR AND PROVIDE WIRING, COILS, AND AUXILIARY CONTACTS AS NECESSARY. SIZE ALL CIRCUITS FOR ACTUAL EQUIPMENT TO BE CONNECTED. |\n| D. | ALL PANELS AND DISCONNECTS LOCATED OUTDOORS SHALL BE LABELED NEMA 3R. |\n| E. | ROOF MOUNTED AND OUTDOOR EQUIPMENT SHALL HAVE 120V RECEPTACLE MOUNTED WITHIN 25' OF EACH PIECE. RECEPTACLES SHALL BE IN WEATHERPROOF BOX AND HAVE GFCI PROTECTION. |\n| F. | FOR ITEMS FURNISHED BY OTHER TRADES, ELECTRICAL CONTRACTOR TO FULLY COORDINATE BREAKER AND WIRE SIZES WITH ACTUAL EQUIPMENT BEING CONNECTED PRIOR TO ROUGH-IN, OR INSTALLATION. THE SIZES ON PANEL SCHEDULES REFER TO BASIS OF DESIGN SELECTIONS, AND ACTUAL ITEMS MAY DEVIATE FROM BASIS OF DESIGN. IT IS THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR TO CONFIRM REQUIRED WIRE AND BREAKER SIZES WITH THE CONTRACTOR FURNISHING THE EQUIPMENT. |\n| G. | REFER TO ARCHITECT'S PLANS AND ELEVATIONS FOR ALL DEVICE MOUNTING HEIGHTS. |\n| H. | CONTRACTOR TO PROVIDE GROUNDING AND BONDING AS REQUIRED FOR ELECTRICAL SYSTEMS. GROUNDING AND BONDING IS CONSIDERED MEANS AND METHODS OF CONSTRUCTION, AND SHOULD BE COMPLETED BY THE ELECTRICAL CONTRACTOR IN ACCORDANCE WITH NEC 250. GAS PIPING SYSTEMS MUST BE BONDED PER UTILITY PROVIDER'S INSTALLATION GUIDELINES WHERE REQUIRED. |\n\n\n| \\# KEYED SHEET NOTES\u003Cbr>|\n| --- |\n| 1. PROVIDE ALTERNATE BID FOR UPGRADED WELDING SOURCE CAPTURE SYSTEM.\u003Cbr>1.1. BLOWER MOTOR : 75HP @ 480V/3P. |\n\nShared Success Through  \nCollaboration and Efficiency  \n515 Monmouth Street, Suite 204 Newport, KY 41071 (859) 261-0585 MEP Consulting Services, Inc. in OH Copyright © 2015  \nTHIS DOCUMENT IS THE PRODUCT AND EXCLUSIVE PROPERTY OF ENGINEERED BUILDING SYSTEMS, INC. NEITHER THE DOCUMENT NOR THE INFORMATION IT CONTAINS MAY BE USED FOR OTHER THAN THE SPECIFIC PURPOSE FOR WHICH IT WAS PREPARED WITHOUT WRITTEN CONSENT OF ENGINEERED BUILDING SYSTEMS, INC.  \nMcGill S m ith P u ns ho n  \nArchitecture Engineering Landscape Architecture Planning  \nSurveying  \n3700 Park 42 Drive Suite 190B  \nCincinnati OH 45241 Phone 513.759.0004 [www.mspdesign.com](www.mspdesign.com)  \nProject Manager  \nDrawn By DWG  \nX-Ref(s)  \nJHR  \n\n| FOR BID | 1 | 03-14-22 |\n| --- | --- | --- |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n\nIssue/Revision No. Date  \nProject Number Drawing Scale Sheet Number  \nFile Number  \nAS NOTED  \nE1.0  \nTHESE DRAW INGS A","cbCainKuMrfOUseA","https://ap.wps.com/l/cbCainKuMrfOUseA","pdf",4671566,"English","# Scope of Work\n## General Notes - Overall Project\n## General Notes - Power\n# Keyed Sheet Notes\n## Electrical Legend","[{\"question\":\"What does the project include under the scope of work?\",\"answer\":\"The project includes installation of three new ground-mounted RTUs and one ground-mounted welding source capture system, plus new branch circuits from the existing “MDP” panel and installation of new breakers.\"},{\"question\":\"What is the contractor’s responsibility if field conditions require deviations from the drawings?\",\"answer\":\"If conditions require deviations, the contractor determines the appropriate deviation with approval from the owner; EBS is available to assist when issues arise.\"},{\"question\":\"What requirements are stated for electrical routing and circuit sizing?\",\"answer\":\"The electrical contractor is responsible for all conduit/cable routing and must coordinate with other trades. Feeder wire and conduit sizes are referenced in the single-line diagram, and circuits not sized on the drawing must meet minimum NEC size requirements.\"}]","Electrical Project Drawings - Project Scope and General Notes - For Bid | PDF",18]