[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-664022-105":59,"doc-detail-664022-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","electrical-planning-requirements-514-provide-project-electrical-information","Electrical Planning Requirements - 5.14 - Provide Project Electrical Information","","Electrical Planning Requirements form for Grimsby Power Inc. requesting specific project details to assess impacts on the Electrical Distribution System and to help the Engineering Department prepare information for the developer. The document instructs applicants to submit preliminary electrical site plan drawings upon return, provide approval drawings before any job tenders or construction, and submit as-built drawings after completion in Autocad DWG format. It includes required project location, applicant contact data, service classification and voltage selection, metering and switchboard options, service capacity, metering type, sub-service breakdown, and a signed date.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/electrical-planning-requirements-514-provide-project-electrical-information/664022/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/electrical-planning-requirements-514-provide-project-electrical-information/664022.png","ImageObject",300,407,{"name":92,"@type":93},"Liam","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What information is this form intended to collect from the applicant?","Question",{"text":112,"@type":113},"It collects details needed to assess the proposed project’s impact on the Electrical Distribution System and to allow Grimsby Power Inc.’s Engineering Department to prepare relevant information for the developer.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"When must preliminary electrical site plan drawings be submitted?",{"text":117,"@type":113},"Preliminary electrical site plan drawings are to be submitted when the form is returned to Grimsby Power Inc.",{"name":119,"@type":110,"acceptedAnswer":120},"What format are as-built electrical site plan drawings required to be in?",{"text":121,"@type":113},"As-built electrical site plan drawings must be submitted after project completion in an Autocad DWG format.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},664022,1793236687,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81},8796095461564,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","GRIMSBY POWER INC.  \n231 Roberts Road, Grimsby, Ontario L3M 5N2 Phone: (905) 945-5437 Fax: (905) 945-9933  \nElectrical Planning Requirements 5.14  \nIt is essential that the following information be provided to:  \na) enable an assessment to be made on the impact of the proposed project on our Electrical Distribution System.  \nb) enable Grimsby Power Inc.'s Engineering Department to prepare pertinent information for the developer.  \nPlease supply answers to the following questions as soon as possible as Site Planning approval cannot be authorized until this information has been reviewed by our staff.  \nPreliminary electrical site plan drawings are to be submitted when this form is returned to Grimsby Power Inc. Electrical drawings are to be submitted to Grimsby Power Inc. for approval prior to any related job tenders or the commencement of any electrical construction. The drawings shall be drawn to a scale usable by Grimsby Power Inc., shall show local pole locations, proposed transformer location, proposed electrical room/metering location and show how access to the metering would be gained (i.e.: the path to the metering) .  \nAs-Built electrical site plan drawings are to be submitted to Grimsby Power Inc. after completion of the project in an Autocad™ DWG format.  \nProject Location:   Name of Project:   Name of Applicant:    \nContact Name:   Address of Contact:    \nTelephone:  ( )  Fax:  ( )   \nService Classification ( 􀀺 as many as apply):  \n􀂅 Low Density Residential  \n􀂅 Freehold Townhouses  \n􀂅 Townhouse Corporation  \n􀂅 Apartments  \n􀂅 Non-Residential  \nWhat service voltage is required ( 􀀺 one only):  \n􀂅 120/240 Volt Single Phase  \n􀂅 120/208 Volt Three Phase  \n􀂅 347/600 Volt Three Phase  \nService Entrance Switchboard with Utility 􀂅 Yes 􀂅 No  \nCT and PT Compartment  \nCapacity of Main Service (in Amperes):  \nMaximum rated capacity:    \nMetering Type ( 􀀺 one only):  \n􀂅 Bulk metering (Non-Residential Only)  \n􀂅 Individual metering Number of sub-services  \n100A or less:    \n101A to 200A:    \nmore than 200A:    \nComments:    \nSigned:   Date:    \n(Representative of Applicant)  \nName:   Title:    \n(Please Print)","cbCailIIeYVPeP6E","https://ap.wps.com/l/cbCailIIeYVPeP6E","pdf",90373,"English","# Project submission and approval workflow\n## Preliminary drawings\n## Approved electrical drawings\n## As-built drawings\n# Project and applicant information\n## Project location\n## Applicant and contact details\n# Electrical service requirements\n## Service classification\n## Required service voltage\n## Service entrance switchboard with utility\n## CT and PT compartment and main service capacity\n## Metering type and sub-service details\n# Signature and date","[{\"question\":\"What information is this form intended to collect from the applicant?\",\"answer\":\"It collects details needed to assess the proposed project’s impact on the Electrical Distribution System and to allow Grimsby Power Inc.’s Engineering Department to prepare relevant information for the developer.\"},{\"question\":\"When must preliminary electrical site plan drawings be submitted?\",\"answer\":\"Preliminary electrical site plan drawings are to be submitted when the form is returned to Grimsby Power Inc.\"},{\"question\":\"What format are as-built electrical site plan drawings required to be in?\",\"answer\":\"As-built electrical site plan drawings must be submitted after project completion in an Autocad DWG format.\"}]","Electrical Planning Requirements - 5.14 - Provide Project Electrical Information | PDF"]