[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-650495-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-650495-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","electric-service-requirements-1100-metering-and-service-equipment-manufacturing-requirements","Electric Service Requirements - 1100 Metering and Service Equipment Manufacturing Requirements","","Electric Service Requirements section 1100 specifies metering and service equipment manufacturing requirements, including switchboard service sections and approval processes. It outlines electric utility service equipment requirements, identifies required approvals before manufacturing multi-meter panel assemblies or service sections, and describes key information that must be submitted for review. The document also defines the components and functional purpose of standard switchboard service sections, including termination bussing, current transformer mounting, test switches, meter sockets, and main disconnect or breaker arrangements.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/electric-service-requirements-1100-metering-and-service-equipment-manufacturing-requirements/650495/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/electric-service-requirements-1100-metering-and-service-equipment-manufacturing-requirements/650495.png","ImageObject",300,407,{"name":42,"@type":43},"Đào","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-24",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",6,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What does Section 1100 cover in electric service requirements?","Question",{"text":63,"@type":64},"Section 1100 covers metering and service equipment manufacturing requirements, including electric utility service equipment requirements and switchboard service sections.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"When is approval required before manufacturing multi-meter panel assemblies or service sections?",{"text":68,"@type":64},"Approval is required before manufacturing when a customer proposes to install a multi-meter panel assembly or service section, submitted to the CRA-ES Electric Meter Shop for review.",{"name":70,"@type":61,"acceptedAnswer":71},"What components are included in a standard switchboard service section?",{"text":72,"@type":64},"A standard switchboard service section includes bussing for service entrance conductor termination, bussing and mounting for current transformers, panels for test switch and meter socket installation, and a service main disconnect switch or breaker, often with distribution feeder breakers or switches.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},650495,1792963721,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":97,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":144,"read_time":145},1374402968488,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","MANUFACTURING REQUIREMENTS  \nTable of Contents-Section 1100  \nPARAGRAPH/DRAWING  \n1100.0 METERING AND SERVICE EQUIPMENT MANUFACTURING REQUIREMENTS  \n1100.1 ELECTRIC UTILITY SERVICE EQUIPMENT REQUIREMENTS  \n1100.2 REQUIRED APPROVAL FOR METERING IN SERVICE EQUIPMENT  \n1100.3 SWITCHBOARD SERVICE SECTION  \n1101.0 CRA-ES DRAWINGS-MISCELLANEOUS SERVICE EQUIPMENT  \n1101.1 LOW-PROFILE SWITCHBOARD SERVICE SECTION  \n0-3000 AMPS, 0-600 VOLTS  \n1101.2 COMBINATION INSTRUMENT TRANSFORMER & METER BOX  \n400 AMP, 0-600 VOLTS  \n1101.3 COMBINATION INSTRUMENT TRANSFORMER & METER BOX  \n600 AMP, 0-600 VOLTS  \n1102.0 EUSERC DRAWINGS-LOW VOLTAGE SERVICE EQUIPMENT  \n1102.1 SWITCHBOARD SERVICE SECTION ILLUSTRATIONS  \n1102.2 CRA-ES ADDENDUMS TO EUSERC DRAWINGS DWG 300 MISCELLANEOUS REQUIREMENTS-SHEETS 1-13  \nDWG 301 RESIDENTIAL COMBINATION METER PANEL, 100-225 AMP DWG 304 SAFETY SOCKET BOX WITH TEST-BYPASS FACILITIES, 100 AMP DWG 304 CRA-ES ADDENDUM TO EUSERC DWG 304  \nDWG 305 SAFETY SOCKET BOX WITH TEST-BYPASS FACILITIES, 200 AMP DWG 305 CRA-ES ADDENDUM TO EUSERC DWG 305  \nDWG 305A COMBINATION SAFETY-SOCKET PANEL WITH TEST BLOCKS AND SVC  \nDISCONNECT, 100 & 200 AMP  \nDWG 306 SELF-CONTAINED METERS INSTALLED IN SWITCHBOARDS  \nDWG 307 TYPICAL UNDERGROUND SERVICE AND METER POST, 100-200 AMP DWG 308 NON-RESIDENTIAL SERVICE PEDESTALS, 100-200 AMP  \nDWG 309 COMMERCIAL FIXED TOP SERVICE PEDESTALS, 0 TO 200 AMPS DWG 311 TEST-BYPASS / DISCONNECT BLOCK FOR SAFETY SOCKETS  \n100 AND 200 AMP 0-600V  \nDWG 313 COMBINATION INSTRUMENT TRANSFORMER & METER BOX, 400 AMP (OVERHEAD SERVICES ONLY)  \nDWG 313 CRA-ES ADDENDUM TO EUSERC DWG 313  \nDWG 315 COMBINATION DISCONNECT DEVICE AND TERMINATING ENCLOSURE  \n0-600 VOLTS, 1200 AMP MAXIMUM  \nDWG 319 INSTRUMENT TRANSFORMER COMPARTMENT FOR SWITCHBOARDS  \n0 – 600 VOLTS, 0-1000 AMPS, 1 OR 3 PHASE, 3 WIREDWG 319 CRA-ES ADDENDUM TO EUSERC DWG 319  \nDWG 320 INSTRUMENT TRANSFORMER COMPARTMENT FOR SWITCHBOARDS  \n0-600 VOLTS, 0-1000 AMPS, 3 PHASE, 3 OR 4 WIREDWG 320 CRA-ES ADDENDUM TO EUSERC DWG 320  \nDWG 322 INSTRUMENT TRANSFORMER COMPARTMENT FOR SWITCHBOARDS  \n0-600 VOLTS, 1001-3000 AMPS, 3 PHASE, 3 OR 4 WIREDWG 322 CRA-ES ADDENDUM TO EUSERC DWG 322  \nDWG 324 INSTRUMENT TRANSFORMER COMPARTMENT FOR SWITCHBOARDS  \n0-600 VOLTS, 3001 AMPS OR LARGER, 3 PHASE, 3 OR 4 WIREDWG 324 CRA-ES ADDENDUM TO EUSERC DWG 324  \nDWG 325 STANDARD SWITCHBOARD SERVICE SECTION (WITHOUT FILLER PANEL)  \nPAGE  \n1  \n1  \n1  \n1  \n2  \n2,3  \n4  \n5 6  \n6 6  \nTable of contents (Cont’d)  \nPARAGRAPH/DRAWING PAGE  \nDWG 326 STANDARD SWITCHBOARD SERVICE SECTION (WITH FILLER PANEL) DWG 326/APS APS ADDENDUM TO EUSERC DWG 326  \nDWG 327 COMBINATION SWITCHBOARD SERVICE SECTION AND PULL SECTION  \nDWG 327/APS APS ADDENDUM TO EUSERC DWG 327  \nDWG 328A CURRENT TRANSFORMER MOUNTING BASE  \n0-600 VOLTS, 0-400 AMPS, 1 PHASE OR 3 PHASE, 3 WIREDWG 328A/APS APS ADDENDUM TO EUSERC DWG 328A  \nDWG 329A CURRENT TRANSFORMER MOUNTING BASE  \n0-600 VOLTS, 0-400 AMPS, 3 PHASE, 3 OR 4 WIREDWG 329A/APS APS ADDENDUM TO EUSERC DWG 329A  \nDWG 330 REMOVABLE LINK AND CT SUPPORT (4 INCH BUS)  \nDWG 331 REMOVABLE LINK AND CT SUPPORT (5 INCH BUS) DWG 332 15-INCH HINGED METER PANEL  \nDWG 342 COMBINATION TERMINATING ENCLOSURE AND MULTI-METER  \nPANELS FOR RESIDENTIAL SERVICES-6 METERS MAXIMUM DWG 343 WALL-MOUNTED PULL BOX WITH TERMINATING FACILITIES  \nDWG 345 UNDERGROUND SERVICE TERMINATION FOR STANDARD  \nSWITCHBOARDS, 400-2000 AMPS  \nDWG 347 UNDERGROUND SERVICE TERMINATING FACILITIES IN PULL  \nBOXES OR PULL SECTIONS  \nDWG 348 OVERHEAD SERVICE TERMINATION FOR STANDARD SWITCHBOARD  \nSERVICE SECTIONS  \nDWG 349 BUSWAY SERVICE HEAD, 1 PHASE OR 3 PHASE, 3 OR 4 WIRE  \nDWG 353 CLEARANCES, MULTIPLE METERING, RESIDENTIAL  \nDWG 354 OUTDOOR OR RAINTIGHT ENCLOSURES FOR SW  \n1103.0 EUSERC DRAWINGS-HIGH VOLTAGE SERVICE EQUIPMENT 7  \n1103.1 APS ADDENDUMS TO EUSERC DRAWINGS DWG 400 MISCELLANEOUS REQUIREMENTS-SHEETS 1-5  \nDWG 401 HIGH VOLTAGE METERING ENCLOSURE WITH VT  \nDISCONNECT COMPARTMENT (2400-27000 VOLTS) DWG 401/APS APS AD","cbCaioqQ7vypQyjx","https://ap.wps.com/l/cbCaioqQ7vypQyjx","pdf",6371181,118,"English","# 1100.0 Metering and Service Equipment Manufacturing Requirements\n## 1100.1 Electric Utility Service Equipment Requirements\n## 1100.2 Required Approval for Metering in Service Equipment\n## 1100.3 Switchboard Service Section","[{\"question\":\"What does Section 1100 cover in electric service requirements?\",\"answer\":\"Section 1100 covers metering and service equipment manufacturing requirements, including electric utility service equipment requirements and switchboard service sections.\"},{\"question\":\"When is approval required before manufacturing multi-meter panel assemblies or service sections?\",\"answer\":\"Approval is required before manufacturing when a customer proposes to install a multi-meter panel assembly or service section, submitted to the CRA-ES Electric Meter Shop for review.\"},{\"question\":\"What components are included in a standard switchboard service section?\",\"answer\":\"A standard switchboard service section includes bussing for service entrance conductor termination, bussing and mounting for current transformers, panels for test switch and meter socket installation, and a service main disconnect switch or breaker, often with distribution feeder breakers or switches.\"}]","Electric Service Requirements - 1100 Metering and Service Equipment Manufacturing Requirements | PDF",1792830061,297]