[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-496912-105":59,"doc-detail-496912-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","el-9-monitoring-report-for-asset-maintenance-and-protection","EL-9 - Monitoring Report for Asset Maintenance and Protection","","Formal board memorandum certifying accuracy of Executive Limitation EL-9, Asset Maintenance and Protection, covering September 1, 2024 through August 31, 2025. The report explains compliance efforts typical of highly effective organizations, including proactive facilities maintenance planning, refinement of facility modification requests, and development of a “universal bathroom” standard for ADA-accessible needs. It details capital planning, GC/CM agency status, community and school construction initiatives, digital mapping and required surveys, solar sustainability additions, and updates to facility rental rates effective September 1, 2025.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/el-9-monitoring-report-for-asset-maintenance-and-protection/496912/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/el-9-monitoring-report-for-asset-maintenance-and-protection/496912.png","ImageObject",300,407,{"name":92,"@type":93},"Alexandar","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-05","2026-10-02",true,{"@type":102,"interactionType":103,"userInteractionCount":44},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What reporting period does this EL-9 monitoring report cover?","Question",{"text":112,"@type":113},"It certifies accuracy as of Aug 31, 2025 and covers the reporting period from September 1, 2024 through August 31, 2025.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How does the report describe facilities maintenance planning for the 2024-25 school year?",{"text":117,"@type":113},"It describes assessing major building systems, gathering user input from principals and building leaders, evaluating needs through a committee, and prioritizing repairs supported by a Facilities Maintenance levy over a six-year life.",{"name":119,"@type":110,"acceptedAnswer":120},"What changes were made to the facility modification request process and why?",{"text":121,"@type":113},"The report states the district refined a process for consistent implementation through monthly reviews by a multi-disciplinary team, using examples like accessibility improvements such as high-visibility contrast and bathroom remodels to meet ADA needs.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},496912,1791385562,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":44,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145,"preview_page_count":19,"preview_urls":146},962090768658,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","MEMORANDUM  \nTO: Board of Directors  \nFROM: Dr. Greg Baker, Superintendent  \nDATE: December 11, 2025  \nSUBJECT: Monitoring Report for EL-9, Asset Maintenance and Protection  \nI certify that the following is accurate as of Aug 31, 2025. The reporting period is from September 1, 2024 through August 31, 2025.  \nPolicy Type: Executive Limitation  \nPolicy: EL–9, Asset Maintenance and Protection  \nAdopted: September 10, 2009; revised August 9, 2012; June 27, 2013, September  \n11, 2014, January 12, 2017, November 1, 2017, February 27, 2019, reviewed March 16, 2022; updated September 14, 2022  \nInterpretation of Items:  \n• The ﬁve-year plan for managing, developing and improving facili;es is comprised of projects associated with bond issues approved by voters:  \no February 18, 2022 $122 million  \no February 13, 2018 $155 million  \no November 5, 2013 $160 million  \n• The Loss Experience Factor is a number calculated by the Washington State Department of Labor and Industries indica;ng the eﬀec;veness of our Workers Compensa;on Safety Program.  \nBackground Information: This report pertains to Executive Limitation 9, Asset Maintenance and Protection. It was prepared in collaboration with sta! from Operations, including Capital Projects, Facilities and Sustainability, Transportation, Safety & Security, as well as Finance, Educational Technology, and our Grant Writer and Special Projects Manager. Information indicating compliance for each of the areas is presented below.  \nDescription of Evidence of Compliance:  \n1. The superintendent shall not fail to take all reasonable and prudent actions with  \nrespect to maintaining and protecting district property that are typical for similar and highly e!ective organizations.  \nIn compliance  \nOverview of Facilities:  \nSize and Number: Bellingham Public Schools facilities include 14 elementary schools, four middle schools, four high schools, the Bellingham Family Partnership Program, the old and new district o!ices, Transportation, the Central Kitchen, Facilities and Sustainability, the Distribution Center, the environmental education property, and a building leased from WECU for the Community Transitions program. These 30 facilities include approximately 1.8 MM square feet of building space over 280 acres.  \nSchool year 2024-25 was a year of planning and preparation. We shifted our thinking about facilities maintenance and looked for ways to proactively plan and fund facility maintenance. Our Operations team ﬁrst assessed the major building systems in each facility and then interviewed principals and building leaders for user input. Using this information about each building in the district, we then led a committee to evaluate andreﬁne our assessment and made recommendations about a Capital levy. The committee recommended titling the levy e!ort our Facilities Maintenance levy as a funding strategy for proactive building maintenance. Ultimately, the work to assess needs in our buildings and the recommendation to seek levy funding allowed the Operations team to build a work plan prioritizing repairs over the 6-year life of the Facilities Maintenance levy.  \nWe also continued to reﬁne our Facility Modiﬁcation Request process to plan for consistent implementation of building changes and improvements. Each month, a multi-disciplinary team review requests for changes to buildings. Requests vary widely; examples include the desire to add a mural and the need to add high-visibility contrast on school stairs so students and sta! with vision disabilities can navigate buildings safely. A major e!ort of the year emerged as sta! requested bathroom remodels to meet the needs of students; it became clear that each school needs ADA-accessible bathrooms with appropriate space and equipment. From these requests, we identiﬁed  \na consistent need and then developed a standard for a “universal bathroom,” which includes a changing table and Hoyer lift in a private stall.  \nThe Capital Projects team also led an important ","cbCaik2hGtmrdUjK","https://ap.wps.com/l/cbCaik2hGtmrdUjK","pdf",334168,15,"English","# Monitoring Report for EL-9, Asset Maintenance and Protection\n## Policy framework and reporting period\n## Interpretation of key items\n## Overview of facilities and maintenance planning\n## Facility modifications and universal bathroom standard\n## Capital projects, GC/CM status, and construction initiatives\n## Sustainability, digital mapping, and surveys\n## Facility rental practices and rate changes","[{\"question\":\"What reporting period does this EL-9 monitoring report cover?\",\"answer\":\"It certifies accuracy as of Aug 31, 2025 and covers the reporting period from September 1, 2024 through August 31, 2025.\"},{\"question\":\"How does the report describe facilities maintenance planning for the 2024-25 school year?\",\"answer\":\"It describes assessing major building systems, gathering user input from principals and building leaders, evaluating needs through a committee, and prioritizing repairs supported by a Facilities Maintenance levy over a six-year life.\"},{\"question\":\"What changes were made to the facility modification request process and why?\",\"answer\":\"The report states the district refined a process for consistent implementation through monthly reviews by a multi-disciplinary team, using examples like accessibility improvements such as high-visibility contrast and bathroom remodels to meet ADA needs.\"}]","EL-9 - Monitoring Report for Asset Maintenance and Protection | PDF",1790943418,38,[147,151,155,159],{"page_no":8,"url":148,"width":149,"height":150},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/c1ba6cb3a031a539a40189b41653362e.webp",983,1272,{"page_no":14,"url":152,"width":153,"height":154},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/d684056608b051132717b45b9761cb19.webp",982,1270,{"page_no":81,"url":156,"width":157,"height":158},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/b4e713bcecacac7b5328e34a554d2bc8.webp",981,1269,{"page_no":19,"url":160,"width":161,"height":162},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/d47dc8aa972308c87e3b17830691d21c.webp",980,1268]