[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-108676-en":3,"doc-seo-108676-105":30,"detail-sidebar-cat-0-en-105":92},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":4,"category_id":11,"category_name":12,"doc_title":13,"doc_description":14,"doc_content":15,"file_id":16,"file_url":17,"file_type":18,"file_size":19,"view_count":20,"is_deleted":4,"is_public":21,"is_downloadable":21,"audit_status":21,"page_count":22,"language":23,"language_code":24,"site_id":25,"html_lang":24,"table_of_contents":26,"faqs":27,"seo_title":13,"seo_description":14,"update_tm":28,"read_time":29},108676,7971461740909,"Levi","https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d",8,"Research & Report","EGYPT CCDR Annex - Investments and EPM Summary Tables","Annex tables for Egypt CCDR present quantified investment needs across key sectors and scenarios. The investments section summarizes totals expressed in USD$ with a cumulative discounted investment using a 6% discount rate, highlighting costs for cities, water and sanitation, energy transition, transport, and related examples of financing. The annex also includes an EPM results summary for Egypt, comparing the Current Policies Scenario (CPS) and the Net-zero 100% Scenario (NZ100) with targets for renewable capacity and emissions abatement through 2050, including model parameters and annual growth rates.","Disclosure Authorized Pub lic Disclosure Authorized  \nEGYPT CCDR  \nAnnex  \nNovember8,2022  \nAuthorized Public  \nPub lic Disclosure  \n© 2022 The World Bank Group  \n1818 H Street NW, Washington, DC 20433 Telephone: 202-473-1000; [Internet: ](Internet: www.worldbank.org)[www.worldbank.org](Internet: www.worldbank.org)  \nThis work is a product of the staff of The World Bank Group with external contributions.“The World Bank Group” refers to the legally separate organizations of the International Bank for Reconstruction and Development (IBRD), the International Development Association (IDA), the International Finance Corporation (IFC), and the Multilateral Investment Guarantee Agency (MIGA) .  \nThe World Bank Group does not guarantee the accuracy, reliability or completeness of the content included in this work, or the conclusions or judgments described herein, and accepts no responsibility or liability for any omissions or errors (including, without limitation, typographical errors and technical errors) in the content whatsoever or for reliance thereon. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of the World Bank Group concerning the legal status of any territory or the endorsement or acceptance of such boundaries. The findings, interpretations, and conclusions expressed in this volume do not necessarily reflect the views of the organizations of the World Bank Group, their respective Boards of Executive Directors, and the governments they represent.  \nThe contents ofthis work are intended for general informational purposes only and are not intended to constitute legal, securities, or investment advice, an opinion regarding the appropriateness of any investment, or a solicitation of any type. Some of the organizations of the World Bank Group or their affiliates may have an investment in, provide other advice or services to, or otherwise have a financial interest in, certain of the companies and parties named herein.  \nNothing herein shall constitute or be construed or considered to be a limitation upon or waiver of the privileges and immunities of any of the organizations of The World Bank Group, all of which are specifically reserved.  \nRights and Permissions  \nThe material in this work is subject to copyright. Because The World Bank Group encourages dissemination of its knowledge, this work may be reproduced, in whole or in part, for noncommercial purposes as long as full attribution to this work is given and all further permissions that may be required for such use (as noted herein) are acquired. The World Bank Group does not warrant that the content contained in this work will not infringe on the rights of third parties, and accepts no responsibility or liability in this regard.  \nAll queries on rights and licenses should be addressed to World Bank Publications, The World Bank Group, 1818 H Street NW, Washington, DC 20433, USA; e-mail: [pubrights@worldbank.org](pubrights@worldbank.org).  \nAnnex  \n1.1. Investments Table  \nTotal investments are expressed in USD$ billion and with a cumulative discounted investment, using a 6% discount rate. This table is not intended to provide a comprehensive summary of all investments needed, but instead to illustrate some of the costs of key actions needed and highlighted in this report.  \n\n| Investments | Total investments /USD$ billion | Examples of successful financing |\n| --- | --- | --- |\n| Cities | Total investment needs for 2022- 2030 are ~US$105bn (in 2022 constant/real prices and discounted 6%) of which\u003Cbr>o $5 .6bn is from NbS and Strategic SWD network\u003Cbr>o $32 .4bn for Integrating green housing & EE with urbanization\u003Cbr>o $57bn for urban mobility and landform changes\u003Cbr>o $8 .4bn for waste management & resource circularity\u003Cbr>• Note that estimates for water and sanitation investments are provided below An additional $4 .32bn is needed to meet the O&M needs of the infrastructure created over the perio","cbCaiphZ80bmQUqv","https://ap.wps.com/l/cbCaiphZ80bmQUqv","pdf",583599,6,1,29,"English","en",105,"# Annex\n## 1.1. Investments Table\n## 1.2. Summary Table of EPM results","[{\"question\":\"What discount rate and units are used for the investment figures in the annex?\",\"answer\":\"Total investments are expressed in USD$ billion and use a cumulative discounted investment calculated with a 6% discount rate.\"},{\"question\":\"Which sectors are covered in the Investments Table?\",\"answer\":\"The annex covers investments for cities, water and sanitation, energy transition, and transport, including examples of financing and projects.\"},{\"question\":\"How do the CPS and NZ100 scenarios differ in the EPM summary table?\",\"answer\":\"The CPS targets a renewable energy share in the capacity mix proportion of peak demand by 2035 and extrapolates to 2050, while NZ100 models a net-zero pathway aiming for 100% abatement of annual system emissions by 2050.\"}]",1784473154,73,{"code":4,"msg":31,"data":32},"ok",{"site_id":25,"language":24,"slug":33,"title":13,"keywords":34,"description":14,"schema_data":35,"social_meta":87,"head_meta":89,"extra_data":91,"updated_unix":28},"egypt-ccdr-annex-investments-and-epm-summary-tables","",{"@graph":36,"@context":86},[37,54,69],{"@type":38,"itemListElement":39},"BreadcrumbList",[40,44,48,51],{"item":41,"name":42,"@type":43,"position":21},"https://docshare.wps.com","Home","ListItem",{"item":45,"name":46,"@type":43,"position":47},"https://docshare.wps.com/document/","Document",2,{"item":49,"name":12,"@type":43,"position":50},"https://docshare.wps.com/document/research-report/",3,{"item":52,"name":13,"@type":43,"position":53},"https://docshare.wps.com/document/egypt-ccdr-annex-investments-and-epm-summary-tables/108676/",4,{"url":52,"name":13,"@type":55,"author":56,"headline":13,"publisher":58,"fileFormat":61,"inLanguage":24,"description":14,"dateModified":62,"datePublished":63,"encodingFormat":61,"isAccessibleForFree":64,"interactionStatistic":65},"DigitalDocument",{"name":9,"@type":57},"Person",{"url":41,"name":59,"@type":60},"DocShare","Organization","application/pdf","2026-07-31","2026-07-19",true,{"@type":66,"interactionType":67,"userInteractionCount":20},"InteractionCounter",{"@type":68},"ViewAction",{"@type":70,"mainEntity":71},"FAQPage",[72,78,82],{"name":73,"@type":74,"acceptedAnswer":75},"What discount rate and units are used for the investment figures in the annex?","Question",{"text":76,"@type":77},"Total investments are expressed in USD$ billion and use a cumulative discounted investment calculated with a 6% discount rate.","Answer",{"name":79,"@type":74,"acceptedAnswer":80},"Which sectors are covered in the Investments Table?",{"text":81,"@type":77},"The annex covers investments for cities, water and sanitation, energy transition, and transport, including examples of financing and projects.",{"name":83,"@type":74,"acceptedAnswer":84},"How do the CPS and NZ100 scenarios differ in the EPM summary table?",{"text":85,"@type":77},"The CPS targets a renewable energy share in the capacity mix proportion of peak demand by 2035 and extrapolates to 2050, while NZ100 models a net-zero pathway aiming for 100% abatement of annual system emissions by 2050.","https://schema.org",{"og:url":52,"og:type":88,"og:title":13,"og:site_name":59,"og:description":14},"article",{"robots":90,"canonical":52},"index,follow",{"doc_id":7,"site_id":25},{"code":4,"msg":5,"data":93},[94,98,102,106,111,115,120,123,128,131,135],{"id":21,"doc_module":4,"doc_module_name":46,"category_name":95,"show_sort_weight":96,"slug":97},"Story & Novel",90,"story-novel",{"id":47,"doc_module":4,"doc_module_name":46,"category_name":99,"show_sort_weight":100,"slug":101},"Literature",80,"literature",{"id":53,"doc_module":4,"doc_module_name":46,"category_name":103,"show_sort_weight":104,"slug":105},"Exam",70,"exam",{"id":107,"doc_module":4,"doc_module_name":46,"category_name":108,"show_sort_weight":109,"slug":110},5,"Comic",60,"comic",{"id":20,"doc_module":4,"doc_module_name":46,"category_name":112,"show_sort_weight":113,"slug":114},"Technology",50,"technology",{"id":116,"doc_module":4,"doc_module_name":46,"category_name":117,"show_sort_weight":118,"slug":119},7,"Healthcare",40,"healthcare",{"id":11,"doc_module":4,"doc_module_name":46,"category_name":12,"show_sort_weight":121,"slug":122},30,"research-report",{"id":124,"doc_module":4,"doc_module_name":46,"category_name":125,"show_sort_weight":126,"slug":127},9,"Religion & Spirituality",20,"religion-spirituality",{"id":126,"doc_module":4,"doc_module_name":46,"category_name":129,"show_sort_weight":126,"slug":130},"World Cup","world-cup",{"id":132,"doc_module":4,"doc_module_name":46,"category_name":133,"show_sort_weight":132,"slug":134},10,"Lifestyle","lifestyle",{"id":136,"doc_module":4,"doc_module_name":46,"category_name":137,"show_sort_weight":107,"slug":138},19,"General","general"]