[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-648011-105":59,"doc-detail-648011-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","egp-04-01-applicability-engineering-drawings-and-documentation","EGP-04-01 - Applicability - Engineering Drawings and Documentation","","Engineering Drawings and Documentation EGP-04-01 sets the applicability for managing engineering drawing sets across internal and external contexts within the ARTC network. It defines how publication requirements are handled and records document status and version history, including amendments from 4.0 through 4.4. The contents outline purposes, procedure ownership, definitions, applicable documents, and detailed drawing requirements covering CAD templates, drawing numbers, 3D models, version control, standard and third-party drawings, and geocentric datum.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/egp-04-01-applicability-engineering-drawings-and-documentation/648011/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/egp-04-01-applicability-engineering-drawings-and-documentation/648011.png","ImageObject",300,407,{"name":92,"@type":93},"Tirek","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-24","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the scope of EGP-04-01 applicability?","Question",{"text":112,"@type":113},"EGP-04-01 defines how engineering drawing documentation requirements apply across the ARTC network, including internal and external contexts and publication requirements.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How is version information and amendments recorded in this document?",{"text":117,"@type":113},"The document includes a version number, date reviewed, prepared by, endorsed and approved parties, and an amendment record describing clause and description changes from earlier versions.",{"name":119,"@type":110,"acceptedAnswer":120},"Which drawing topics are covered under drawing requirements?",{"text":121,"@type":113},"Drawing requirements cover general requirements, CAD drawing templates, placement of drawing numbers, 3D models, version control, standard drawings, third-party drawings, and geocentric datum requirements.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},648011,1792878106,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145},5909896572756,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","Engineering Drawings and Documentation  \nEGP-04-01  \nApplicability  \n\n| ARTC Network Wide |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- |\n| SMS |  |  |  |  |  |  |  |\n| Publication Requirement |  |  |  |  |  |  |  |\n| Internal / External |  |  |  |  |  |  |  |\n| Primary Source |  |  |  |  |  |  |  |\n| (Reference to previous source version of same document that has been superseded, such as new name or number, or consolidation of number of procedures into one version. Leave blank if not applicable) |  |  |  |  |  |  |  |\n| Document Status |  |  |  |  |  |  |  |\n| Version \\# | Date Reviewed |  |  | \u003Cbr>Prepared by\u003Cbr>|  | \u003Cbr>Endorsed\u003Cbr>| Approved |\n| 4.4 | 3 Dec 25 |  |  | Network Information Administrator |  | Manager Integrated Systems Framework | GM Technical Services & Assurance 18/12/2025 |\n| Amendment Record |  |  |  |  |  |  |  |\n| Amendment Version \\# |  | Date Reviewed | \u003Cbr>Clause |  | Description of Amendment |  |  |\n| 4.0 |  | 17 Jan 22 | \u003Cbr>Various |  | Significant re-write of procedure. |  |  |\n| 4.1 |  | 22 Apr 22 | 2.3 |  | Drawing Number inclusion in template clarified. |  |  |\n| 4.2 |  | 23 Jun 22 | 2. 1, 2.8, 3.2,\u003Cbr>5. 1, 5.4, 5.6 |  | Clarified use of PTV drawing template for IFC and AsCommissioned drawings. Included ability for secure digital signature into acceptance of large drawing sets. Added geocentric datum requirements for survey & GIS drawings. |  |  |\n| 4.3 |  | 15 Feb 24 | 1.5, 2.4, 4.2,\u003Cbr>Appendix C |  | Update applicable documents.\u003Cbr>Provide further detail on 3D model requirements. Note added for revised designs and NSW signal requirements updated. |  |  |\n\n4.4 3 Dec 25 Various Technical Note EGN-04-01 and large-scale projects master file  \nsubmission exception details added. Checking, Review and Approval of drawings updated. Reference documents, project repository references and drawing roles updated.  \nTable of Contents  \nTable of Contents .............................................................................................................................................3  \n1 Introduction.............................................................................................................................................5  \n1.1 Purpose ..........................................................................................................................................5  \n1.2 Procedure Owner ...........................................................................................................................5  \n1.3 Overview ........................................................................................................................................5  \n1.4 Definitions.......................................................................................................................................6  \n1.5 Applicable Documents ...................................................................................................................7  \n2 Drawing Requirements ..........................................................................................................................8  \n2.1 General Requirements ...................................................................................................................8  \n2.2 CAD Drawing Templates................................................................................................................9  \n2.3 Drawing Numbers Location on Template.......................................................................................9  \n2.4 3D Models .................................................................................................................................... 10  \n2.4.1 Track Design and Alignment Models ............................................................................................ 11  \n2.5 Version Control............................................................................................................................. 11  \n2.6 ","cbCaiu40l0s1ZB4d","https://ap.wps.com/l/cbCaiu40l0s1ZB4d","pdf",3656245,52,"English","# 1 Introduction\n## 1.1 Purpose\n## 1.2 Procedure Owner\n## 1.3 Overview\n## 1.4 Definitions\n## 1.5 Applicable Documents\n# 2 Drawing Requirements\n## 2.1 General Requirements\n## 2.2 CAD Drawing Templates\n## 2.3 Drawing Numbers Location on Template\n## 2.4 3D Models\n## 2.5 Version Control\n## 2.6 Standard Drawings\n## 2.7 Third Party Drawings\n## 2.8 Geocentric Datum\n# 3 Drawing Management Systems\n## 3.1 ARTC Drawing Management System\n## 3.2 Public Transport Victoria (PTV) Drawing Management System\n# 4 Drawing Stages\n## 4.1 Design Iterations\n## 4.2 Issued-for-Construction (IFC) / As-Designed\n## 4.3 As-Commissioned / As-Constructed\n## 4.4 As-Built / Works-As-Executed\n# 5 Drawing Approvals and Acceptance\n## 5.1 ARTC Competency Assessment","[{\"question\":\"What is the scope of EGP-04-01 applicability?\",\"answer\":\"EGP-04-01 defines how engineering drawing documentation requirements apply across the ARTC network, including internal and external contexts and publication requirements.\"},{\"question\":\"How is version information and amendments recorded in this document?\",\"answer\":\"The document includes a version number, date reviewed, prepared by, endorsed and approved parties, and an amendment record describing clause and description changes from earlier versions.\"},{\"question\":\"Which drawing topics are covered under drawing requirements?\",\"answer\":\"Drawing requirements cover general requirements, CAD drawing templates, placement of drawing numbers, 3D models, version control, standard drawings, third-party drawings, and geocentric datum requirements.\"}]","EGP-04-01 - Applicability - Engineering Drawings and Documentation | PDF",1792791727,131]