[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-664029-105":59,"doc-detail-664029-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","dubai-development-authority-design-revision-and-building-modification-submission-requirements","Dubai Development Authority - Design Revision and Building Modification Submission Requirements","","This document outlines the mandatory structural drawing requirements for design revisions, redesigns, and building modifications submitted to the Dubai Development Authority. It provides a comprehensive checklist of required documentation, categorizing drawings into approved and proposed versions. Key components include general notes, foundation plans, floor layouts, structural schedules, and relevant technical details. The submission guidelines explicitly mandate that all modifications be clearly clouded on the drawings, utilizing yellow clouds for latest approved stamped versions and red clouds for proposed changes. This structured approach ensures compliance with regional building standards and streamlines the regulatory review process for developers and engineering consultants operating within the authority's jurisdiction, facilitating accurate assessment of proposed structural alterations and ensuring project safety.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/dubai-development-authority-design-revision-and-building-modification-submission-requirements/664029/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/dubai-development-authority-design-revision-and-building-modification-submission-requirements/664029.png","ImageObject",300,407,{"name":92,"@type":93},"Riley","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What are the specific color-coding requirements for marking drawings?","Question",{"text":112,"@type":113},"All modifications must be clearly clouded on the drawings, with the latest approved stamped drawings marked in yellow clouds and proposed drawings marked in red clouds.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What structural drawings are required for submission?",{"text":117,"@type":113},"Required drawings include General Notes, Typical Details, Foundation plans, Floor Plans, Schedules, and any other relevant drawing types, provided in both approved and proposed versions.",{"name":119,"@type":110,"acceptedAnswer":120},"Which organization oversees these submission requirements?",{"text":121,"@type":113},"The requirements are mandated by the Dubai Development Authority (DDA) for design revisions and building modifications.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},664029,1793236884,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81},1374391975076,"https://ap-avatar.wpscdn.com/avatar/14000253ca4ec9f6853?x-image-process=image/resize,m_fixed,w_180,h_180&k=1783305029341752051","| DESIGN REVISION/ RE-DESIGN/ BUILDING MODIFICATION SUBMISSION REQUIRED DRAWINGS (STRUCTURAL)\u003Cbr>** All modifications must be clouded clearly on drawings\u003Cbr>Latest Approved Stamped drawings ( YELLOW cloud) Proposed drawings ( RED cloud) |  |\n| --- | --- |\n| Drw. No. | Name |\n| S-00-XXX | General Notes (Approved) |\n| S-00-XXX | General Notes (Proposed) |\n| S-01-XXX | Typical Details (Approved) |\n| S-01-XXX | Typical Details (Proposed) |\n| S-02-XXX | Foundation (Approved) |\n| S-02-XXX | Foundation (Proposed) |\n| S-03-XXX | Floor Plans (Approved) |\n| S-03-XXX | Floor Plans (Proposed) |\n| S-04-XXX | Schedules (Approved) |\n| S-04-XXX | Schedules (Proposed) |\n| S-05-XXX | Details (Approved) |\n| S-05-XXX | Details (Proposed) |\n| S-06-XXX | Any different type of drawings (Approved) |\n| S-06-XXX | Any different type of drawings (Proposed) |","cbCaimXRuYFVWx3l","https://ap.wps.com/l/cbCaimXRuYFVWx3l","pdf",251407,"English","# Drawing Submission Requirements\n## Required Structural Drawings\n## Modification Marking Guidelines","[{\"question\":\"What are the specific color-coding requirements for marking drawings?\",\"answer\":\"All modifications must be clearly clouded on the drawings, with the latest approved stamped drawings marked in yellow clouds and proposed drawings marked in red clouds.\"},{\"question\":\"What structural drawings are required for submission?\",\"answer\":\"Required drawings include General Notes, Typical Details, Foundation plans, Floor Plans, Schedules, and any other relevant drawing types, provided in both approved and proposed versions.\"},{\"question\":\"Which organization oversees these submission requirements?\",\"answer\":\"The requirements are mandated by the Dubai Development Authority (DDA) for design revisions and building modifications.\"}]","Dubai Development Authority - Design Revision and Building Modification Submission Requirements | PDF"]