[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-365694-105":59,"doc-detail-365694-en":131},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":124,"head_meta":126,"extra_data":128,"updated_unix":130},105,"en","dremc-general-requirements-for-residential-electrical-installations-2022","DREMC - General Requirements for Residential Electrical Installations - 2022","","DREMC defines installation requirements for residential electrical services that must be followed in addition to the National Electrical Code, National Electrical Safety Code, and applicable state and local building codes. The specifications cover overhead residential and non-residential service attachment heights and clearances, underground trenching and backfilling responsibilities, required conduit types and installation practices, and separation distances from other utilities and DREMC equipment. The document also addresses manufactured/modular homes and temporary service placement, directing members to consult DREMC engineers for meter-base location and clearance determinations.",{"@graph":69,"@context":123},[70,84,106],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/dremc-general-requirements-for-residential-electrical-installations-2022/365694/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/dremc-general-requirements-for-residential-electrical-installations-2022/365694.png","ImageObject",300,407,{"name":92,"@type":93},"Pentious","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-21","2026-09-23",true,{"@type":102,"interactionType":103,"userInteractionCount":105},"InteractionCounter",{"@type":104},"ViewAction",16,{"@type":107,"mainEntity":108},"FAQPage",[109,115,119],{"name":110,"@type":111,"acceptedAnswer":112},"What codes and standards must be followed for residential electrical installations?","Question",{"text":113,"@type":114},"Installations must follow the National Electrical Code, the National Electrical Safety Code, and applicable state and local building codes, along with DREMC installation requirements.","Answer",{"name":116,"@type":111,"acceptedAnswer":117},"What are the member responsibilities for underground services?",{"text":118,"@type":114},"The member is responsible for trenching and backfilling, including inspection of the trench depth by DREMC prior to backfilling and using clean, rock-free backfill with specified gravel bedding.",{"name":120,"@type":111,"acceptedAnswer":121},"How are conduit requirements specified for below-grade and pole installations?",{"text":122,"@type":114},"Below grade, the conduit is 3-inch schedule 40 PVC (grey electrical conduit) for certain service entrances, while pole conduits use 3-inch rigid metal conduit with defined bend-radius requirements; additional conduit types apply inside pad-mount transformer or underground secondary boxes.","https://schema.org",{"og:url":83,"og:type":125,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":127,"canonical":83},"index,follow",{"doc_id":129,"site_id":62},365694,1790466347,{"code":4,"msg":5,"data":132},{"doc_id":129,"user_id":133,"nickname":92,"user_avatar":134,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":105,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":52,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145,"preview_page_count":19,"preview_urls":146},1374404730887,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","General Requirements for Residential Electrical  \nInstallations  \n2022  \nDREMC General Requirements for Residential Electrical Installations  \nIn addition to the National Electrical Code, National Electrical Safety Code, and state and local building codes, DREMC has installation requirements which must be followed.  \nPlease check with an DREMC engineer or representative before locating the meter base or if you have questions about requirements or specifications.  \nGeneral Specifications  \nA. Overhead Residential Services  \n1. Where a DREMC engineering representative specifies an eyebolt for service attachment, install the eyebolt at a point lower than the weatherhead and no more than 18” horizontally from the weatherhead.  \n2. Where a DREMC engineering representative specifies a service mast for service attachments, install 2 1/2-inch rigid metal conduit (RMC) fastened with a minimum of 2 mast clamps bolted through the wall on all residential services.  \n3. In no case shall a residential point of attachment be less than 12 ft.  \n4. All services must comply with Codes requirements for clearance. Codes can require more than 12’ of clearance at midspan in many situations. DREMC’s engineering representative will assist in determining the required clearance.  \n5. See DR-91 for additional specification details.  \nB. Overhead Non-Residential Services  \n1. Where a DREMC engineering representative specifies an eyebolt for service attachment, install the eyebolt at a point lower than the weatherhead and no more than 18” horizontally from the weatherhead.  \n2. Where a DREMC engineering representative specifies a service mast for service attachments, install 2 1/2-inch rigid metal conduit (RMC) fastened with a minimum of 2 mast clamps bolted through the wall on all residential services.  \n3. All services must comply with Codes requirements for clearance.  \n4. The DREMC Service conductor must maintain a minimum 16 ft. ground clearance at midspan on all non-residential service lines. See an DREMC engineering representative to confirm that the proposed point of attachment height will achieve sufficient ground clearance. If the point of attachment does not comply with the clearance requirements, DREMC will not energize the service.  \n5. See DR-91 for additional specification details.  \nC. Underground Services  \nResponsibility of the Member:  \nTrench:  \n1. The Member will be responsible for the trenching and backfilling necessary for the installation of underground facilities.  \n2. The trench is to be 30” in depth and must be inspected by DREMC prior to backfilling.  \n3. The trench must be backfilled with clean, rock free dirt or bedded 6” above and below the conduit with fine (1/4” down) gravel.  \n4. No large rock, brick, trash, or debris will be permitted as backfill.  \n5. A joint-use trench with gas, water, and sewer will not be allowed. Where gas, water and sewer run parallel to a secondary conduit, a minimum of 48” horizontal separation is required. Where gas, water, and sewer cross a secondary conduit, a minimum of 12”vertical separation is required.  \n6. A joint-use trench with communications (telephone and cable television) must have a minimum 12” vertical separation from the secondary conduit.  \n7. Communications (telephone and cable television), gas, water, and sewer conduits, equipment and meters must be located a minimum of 48” horizontally from DREMC’s secondary boxes.  \nConduit System  \n1. All conduits shall be supplied by the Member.  \n2. The conduit used below grade shall be 3” schedule 40 PVC, grey electrical conduit for  \n400 amps and less service entrances.  \n3. The conduit located on the pole shall be 3” rigid metal conduit, the length of which will be specified on a per job basis. The elbow at the pole shall be rigid metal conduit with a minimum bend radius of 24”. The conduit attached to the house, below the meter base, shall be 3” rigid metal conduit securely fastened with two straps, two feet apart. The elbow at the met","cbCaihz7btvBOQOp","https://ap.wps.com/l/cbCaihz7btvBOQOp","pdf",653663,"English","# General Requirements for Residential Electrical Installations\n## General Specifications\n### A. Overhead Residential Services\n### B. Overhead Non-Residential Services\n### C. Underground Services\n### D. Manufactured and Modular Home Services\n### E. Temporary Services","[{\"question\":\"What codes and standards must be followed for residential electrical installations?\",\"answer\":\"Installations must follow the National Electrical Code, the National Electrical Safety Code, and applicable state and local building codes, along with DREMC installation requirements.\"},{\"question\":\"What are the member responsibilities for underground services?\",\"answer\":\"The member is responsible for trenching and backfilling, including inspection of the trench depth by DREMC prior to backfilling and using clean, rock-free backfill with specified gravel bedding.\"},{\"question\":\"How are conduit requirements specified for below-grade and pole installations?\",\"answer\":\"Below grade, the conduit is 3-inch schedule 40 PVC (grey electrical conduit) for certain service entrances, while pole conduits use 3-inch rigid metal conduit with defined bend-radius requirements; additional conduit types apply inside pad-mount transformer or underground secondary boxes.\"}]","DREMC - General Requirements for Residential Electrical Installations - 2022 | PDF",1790161842,25,[147,151,155,159],{"page_no":8,"url":148,"width":149,"height":150},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/530b3e61b2dd434d4fceb91ca76349cc.webp",983,1272,{"page_no":14,"url":152,"width":153,"height":154},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/d9c46f328f53d4ee5a55e3c56f94fd9e.webp",982,1270,{"page_no":81,"url":156,"width":157,"height":158},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/826269ef6aadb6024f24737cae8ec4d2.webp",981,1269,{"page_no":19,"url":160,"width":161,"height":162},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/76af5f2b56924152d32364029f6e7633.webp",980,1268]