[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-650812-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-650812-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","drawing-management-standard-version-40-may-2024","Drawing Management Standard - Version 4.0 - May 2024","","Drawing Management Standard sets out responsibilities, procedures, and processes for controlling TasNetworks drawing records across their full lifecycle. It defines purpose, scope, stakeholders, minimum requirements, and record revision history, and establishes how staff, contractors, and managers must implement required practices. The document specifies how to request existing and new drawings, provide information, manage drawing identification and numbering, process revisions and updates, and handle approvals, issues, distribution, and error rectification through EDRMS.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/drawing-management-standard-version-40-may-2024/650812/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/drawing-management-standard-version-40-may-2024/650812.png","ImageObject",300,407,{"name":42,"@type":43},"Riley West","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-24",true,{"@type":52,"interactionType":53,"userInteractionCount":30},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"Who is responsible for this drawing management standard?","Question",{"text":62,"@type":63},"Responsibility sits with the Network Asset Data Leader at Tasmanian Networks Pty Ltd, and implementation applies to all TasNetworks staff and contractors. Compliance is required by all group managers.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What minimum requirements must staff and contractors follow?",{"text":67,"@type":63},"The standard states that requirements in TasNetworks documents are minimum requirements that must be complied with by all team members, contractors, and other consultants. End users are expected to implement good practices that can reasonably be regarded as relevant to the document’s objective.",{"name":69,"@type":60,"acceptedAnswer":70},"How are drawing requests and information requirements handled?",{"text":71,"@type":63},"The document defines procedures for requests for existing drawings and the information to be provided with those requests, and it covers issuance of existing drawings as well as requests for new drawing numbers.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},650812,1793055805,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":30,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":144,"read_time":108},1099523885074,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","Standard  \nDrawing Management Standard  \nRecord Number: R2613716  \nVersion: 4.0  \nDate: May 2024  \nAuthorisations  \n\n| Action | Name and title | Date |\n| --- | --- | --- |\n| Prepared by | Greg Hall (Network Asset Data Specialist) | 02/05/2025 |\n| Reviewed by | Jennifer Roe (Leader Network Asset Data) | 02/05/2025 |\n| Authorised by | Jennifer Roe (Leader Network Asset Data) | 02/05/2025 |\n| Review cycle | 2 Years |  |\n\nResponsibilities  \nThis document is the responsibility of the Network Asset Data Leader, Tasmanian Networks Pty Ltd, ABN 24 167 357 299 (hereafter referred to as ‘TasNetworks’) .  \nPlease contact the Asset Strategy Team with any queries or suggestions.  \n• Implementation All TasNetworks staff and contractors.  \n• Compliance All group managers.  \n© Tasmanian Networks Pty Ltd 2023  \nMinimum Requirements  \nThe requirements set out in TasNetworks’documents are minimum requirements that must be complied with by all TasNetworks team members, contractors, and other consultants.  \nThe end user is expected to implement any practices which may not be stated but which can be reasonably regarded as good practices relevant to the objective of this document.  \nRecord of Revisions  \n\n| Version | Description | Date |\n| --- | --- | --- |\n| 1 | Original Issue | 23/12/2015 |\n| 2 | References to ‘TRIM’ replaced with ‘CM10’ | 10/06/2021 |\n| 3 | Document format revised | 11/04/2024 |\n| 4 | Section 3-Additional drawing types ‘OL’ and ‘WD’ added to Table 3. | 02/05/2024 |\n\nTable of Contents  \n1. General........................................................................................................................................... 4  \n1.1 Purpose ................................................................................................................................ 4  \n1.2 Scope ................................................................................................................................... 4  \n1.3 Responsibilities and Stakeholders ....................................................................................... 4  \n1.4 Definitions ........................................................................................................................... 5  \n1.5 References ........................................................................................................................... 6  \n2. Drawing Requests .......................................................................................................................... 7  \n2.1 Requests for Existing Drawings ........................................................................................... 7  \n2.2 Information to Be Provided With Requests ........................................................................ 7  \n2.3 Issue of Existing Drawings ................................................................................................... 7  \n2.3.1 Drawing Format ......................................................................................................... 7  \n2.3.2 Drawings for Project Work......................................................................................... 7  \n2.3.3 Drawings for Information Only .................................................................................. 7  \n2.4 New Drawing Number Requests ......................................................................................... 8  \n3. Drawing Identification Numbering System.................................................................................... 8  \n3.1 Drawing Sheet Numbering ................................................................................................ 10  \n4. Drawing Life Cycle Process .......................................................................................................... 11  \n4.1 Drawing Revision Identification ........................................................................................ 12  \n4.2 Concept Drawings.....................................","cbCaik9CdwH6HhoV","https://ap.wps.com/l/cbCaik9CdwH6HhoV","pdf",309749,16,"English","# 1. General\n## 1.1 Purpose\n## 1.2 Scope\n## 1.3 Responsibilities and Stakeholders\n## 1.4 Definitions\n## 1.5 References\n# 2. Drawing Requests\n## 2.1 Requests for Existing Drawings\n## 2.2 Information to Be Provided With Requests\n## 2.3 Issue of Existing Drawings\n## 2.4 New Drawing Number Requests\n# 3. Drawing Identification Numbering System\n## 3.1 Drawing Sheet Numbering\n# 4. Drawing Life Cycle Process\n## 4.1 Drawing Revision Identification\n## 4.2 Concept Drawings\n## 4.3 Design Stage\n## 4.4 Superseded or Cancelled Drawings\n## 4.5 Construction and Commissioning\n## 4.6 ‘As Installed’ Drawing Updates\n## 4.7 Drawing Updates in EDRMS\n## 4.8 Isolated Drawing Error Rectification\n## 4.9 Management of Drawings with Simultaneous Projects\n## 4.10 Drawing Check and Approval\n## 4.11 Drawing Issue and Distribution\n# 5. Drawing Management System\n# Appendix A","[{\"question\":\"Who is responsible for this drawing management standard?\",\"answer\":\"Responsibility sits with the Network Asset Data Leader at Tasmanian Networks Pty Ltd, and implementation applies to all TasNetworks staff and contractors. Compliance is required by all group managers.\"},{\"question\":\"What minimum requirements must staff and contractors follow?\",\"answer\":\"The standard states that requirements in TasNetworks documents are minimum requirements that must be complied with by all team members, contractors, and other consultants. End users are expected to implement good practices that can reasonably be regarded as relevant to the document’s objective.\"},{\"question\":\"How are drawing requests and information requirements handled?\",\"answer\":\"The document defines procedures for requests for existing drawings and the information to be provided with those requests, and it covers issuance of existing drawings as well as requests for new drawing numbers.\"}]","Drawing Management Standard - Version 4.0 - May 2024 | PDF",1792846405]