[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-648135-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-648135-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","drawing-drafting-standard-version-30-record-september-2024","Drawing Drafting Standard - Version 3.0 - Record September 2024","","Drawing Drafting Standard defines minimum drawing and drafting requirements for TasNetworks staff, contractors, and consultants, covering general rules and standards compliance. It outlines the purpose and scope, supported drawing software platform, key definitions, applicable standards, and required templates. Detailed sections specify requirements for multiple drawing types including electrical schematics, critical schematics, schedules, layout drawings, and assembly drawings, with guidance on clarity such as line weight wording updates. A revision record tracks version history and document responsibilities.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/technology/","Technology",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/drawing-drafting-standard-version-30-record-september-2024/648135/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/drawing-drafting-standard-version-30-record-september-2024/648135.png","ImageObject",300,407,{"name":42,"@type":43},"hdkawk","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-26","2026-10-23",true,{"@type":52,"interactionType":53,"userInteractionCount":26},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"Who is responsible for this drawing and drafting standard?","Question",{"text":62,"@type":63},"The document states responsibility lies with the Network Asset Data Leader (Tasmanian Networks Pty Ltd). All TasNetworks staff and contractors implement the requirements, and all group managers ensure compliance.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What does the standard require organizations to do?",{"text":67,"@type":63},"Requirements set out in TasNetworks documents must be complied with as minimum requirements. The end user is expected to implement additional reasonable good practices relevant to the document’s objective even if not explicitly stated.",{"name":69,"@type":60,"acceptedAnswer":70},"What changes were made in version 3.0 compared with earlier revisions?",{"text":71,"@type":63},"The revision record shows version 3.0 includes a section update where wording in Section 8 was amended to provide more clarity for line weights.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},648135,1793030441,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,104,109,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":102,"slug":103},6,50,"technology",{"id":105,"doc_module":4,"doc_module_name":25,"category_name":106,"show_sort_weight":107,"slug":108},7,"Healthcare",40,"healthcare",{"id":110,"doc_module":4,"doc_module_name":25,"category_name":111,"show_sort_weight":112,"slug":113},8,"Research & Report",30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":101,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":26,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":144,"read_time":145},3985747859855,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","Standard  \nDrawing Drafting Standard  \nRecord Number: R2587284  \nVersion: 3.0  \nDate: September 2024  \nAuthorisations  \n\n| Action | Name and title | Date |\n| --- | --- | --- |\n| Prepared by | Greg Hall-Network Asset Data Specialist | 27/5/2024 |\n| Reviewed by | Michael Cato – Drawing Officer | 9/9/2024 |\n| Authorised by | Jennifer Roe – Leader network Asset Data | 9/9/2024 |\n| Review cycle | 2 Years |  |\n\nResponsibilities  \nThis document is the responsibility of the Network Asset Data Leader, Tasmanian Networks Pty Ltd, ABN 24 167 357 299 (hereafter referred to as ‘TasNetworks’) .  \nPlease contact the Network Asset Data Team ([drawings@tasnetworks.com.au](drawings@tasnetworks.com.au)) with any queries or suggestions.  \n• Implementation All TasNetworks staff and contractors.  \n• Compliance All group managers.  \n© Tasmanian Networks Pty Ltd 2023  \nMinimum Requirements  \nThe requirements set out in TasNetworks’documents are minimum requirements that must be complied with by all TasNetworks team members, contractors, and other consultants.  \nThe end user is expected to implement any practices which may not be stated but which can be reasonably regarded as good practices relevant to the objective of this document.  \nRecord of Revisions  \n\n| Version | Description | Date |\n| --- | --- | --- |\n| 1 | Original Issue (R383981) | 23/12/2015 |\n| 2 | Significant update to reflect changes in business requirements. | 8/12/2023 |\n| 3 | Section 8: Wording amended to provide more clarity for line weights. | 27/5/2024 |\n\nTable of Contents  \n1. General ...........................................................................................................................................5  \n1.1 Purpose ................................................................................................................................5  \n1.2 Scope....................................................................................................................................5  \n1.3 Drawing Software Platform .................................................................................................5  \n1.4 Definitions ............................................................................................................................5  \n1.5 Applicable Standards ...........................................................................................................7  \n1.6 Drawing Templates ..............................................................................................................8  \n2. General Requirements for all Drawings .........................................................................................9  \n3. Requirements for Specific Drawing Types ................................................................................... 10  \n3.1 Electrical Schematics.......................................................................................................... 10  \n3.1.1 Grids and Snaps ........................................................................................................ 10  \n3.1.2 Symbols on Electrical Circuits ................................................................................... 10  \n3.1.3 Identification of Equipment ..................................................................................... 10  \n3.2 Critical Electrical Schematics ............................................................................................. 10  \n3.2.1 Power Circuit One-Line Diagram (PCOLD) ................................................................11  \n3.2.2 Metering and Protection One-Line Diagram (MPOLD) ............................................11  \n3.2.3 Operational Diagram (OD) ........................................................................................ 12  \n3.2.4 One Line Diagram (OLD) ........................................................................................... 12  \n3.2.5 Critical Drawing Content Definition ................................","cbCaicw6nBSx1uJ6","https://ap.wps.com/l/cbCaicw6nBSx1uJ6","pdf",457303,28,"English","# 1. General\n## 1.1 Purpose\n## 1.2 Scope\n## 1.3 Drawing Software Platform\n## 1.4 Definitions\n## 1.5 Applicable Standards\n## 1.6 Drawing Templates\n# 2. General Requirements for all Drawings\n# 3. Requirements for Specific Drawing Types\n## 3.1 Electrical Schematics\n## 3.2 Critical Electrical Schematics\n## 3.3 Schedules\n## 3.4 Layout Drawings\n## 3.5 Assembly drawings\n## 3.6 Maker’s drawings","[{\"question\":\"Who is responsible for this drawing and drafting standard?\",\"answer\":\"The document states responsibility lies with the Network Asset Data Leader (Tasmanian Networks Pty Ltd). All TasNetworks staff and contractors implement the requirements, and all group managers ensure compliance.\"},{\"question\":\"What does the standard require organizations to do?\",\"answer\":\"Requirements set out in TasNetworks documents must be complied with as minimum requirements. The end user is expected to implement additional reasonable good practices relevant to the document’s objective even if not explicitly stated.\"},{\"question\":\"What changes were made in version 3.0 compared with earlier revisions?\",\"answer\":\"The revision record shows version 3.0 includes a section update where wording in Section 8 was amended to provide more clarity for line weights.\"}]","Drawing Drafting Standard - Version 3.0 - Record September 2024 | PDF",1792792427,71]