[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649536-105":59,"doc-detail-649536-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","door-symbol-drawing-index","Door Symbol - Drawing Index","","Door-related drawing index content lists general architectural and construction requirements for contract execution. It specifies obligations for permits, tests, licenses, notifications, and compliance with laws, while directing that work follows applicable building codes and recognized standards for accessibility and disability regulations. The notes cover verification of existing conditions, conflict resolution, prohibition of drawing scaling, protection of adjacent property, typical wall and plan assumptions, patching and repainting of concrete and steel, and requirements for life safety devices, door hardware elements, and fire-rated penetrations and assemblies.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/door-symbol-drawing-index/649536/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/door-symbol-drawing-index/649536.png","ImageObject",300,407,{"name":92,"@type":93},"fresh2021","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-25","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":8},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What responsibilities does the contractor have regarding permits, tests, and compliance?","Question",{"text":112,"@type":113},"The contractor procures and pays for required permits, tests, licenses, certificates, and registrations, and must give notices and comply with laws, ordinances, and regulations governing the work.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How should the project handle accessibility and door clearance guidance?",{"text":117,"@type":113},"The facility is designed to comply with Texas Accessibility Standards (TAS) and the Americans with Disabilities Act (ADA), with provided graphic clearance guidelines; discrepancies require notifying the architect in writing before ordering or constructing affected items.",{"name":119,"@type":110,"acceptedAnswer":120},"What rules apply to drawing dimensions and conflict resolution?",{"text":121,"@type":113},"Do not scale drawings; dimensions govern. If a conflict exists, notify the architect for resolution before proceeding.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},649536,1792920293,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145},962093912154,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","| ARCHITECTURAL SYMBOLS GENERAL NOTES DRAWING INDEX DRAWING INDEX |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| DOOR SYMBOL\u003Cbr>\u003Cbr>\u003Cbr>DOOR NUMBER\u003Cbr>|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | • THE AMERICAN INSTITUTE OF ARCHITECTS STANDARD FORM AIA DOCUMENT A201, FIFTEENTH EDITION, 1997 \"GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION,\" IS HEREBY MADE A PART OF THESE CONTRACT DOCUMENTS.\u003Cbr>• UNLESS OTHERWISE INDICATED, THE CONTRACTOR WILL PROCURE AND PAY FOR ALL PERMITS, TESTS, LICENSES, CERTIFICATES, TAP FEES, IMPACT FEES AND REGISTRATIONS REQUIRED BY ALL AUTHORITIES HAVING JURISDICTION OVER THIS PROJECT.\u003Cbr>• THE CONTRACTOR SHALL GIVE ALL NOTICES AND COMPLY WITH ALL LAWS, ORDINANCES, REGULATIONS, AND LAWFUL ORDERS OF ANY PUBLIC AUTHORITY BEARING PERFORMANCE OF THE WORK.\u003Cbr>• UNLESS OTHERWISE PROVIDED IN THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL PROVIDE AND PAY FOR ALL LABOR, MATERIALS, TEMPORARY UTILITIES, EQUIPMENT, TOOLS, CONSTRUCTION EQUIPMENT, MACHINERY, TRANSPORTATION, AND OTHER FACILITIES AND SERVICES NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF THE WORK.\u003Cbr>• UNLESS NOTED OTHERWISE, THE CONTRACTOR SHALL PROVIDE ALL RISK BUILDER'S RISK PROPERTY INSURANCE FOR THE DURATION OF CONSTRUCTION. REFER TO OWNER/CONTRACTOR AGREEMENT FOR SPECIFIC REQUIREMENTS.\u003Cbr>• ALL CONSTRUCTION SHALL BE DONE IN ACCORDANCE WITH ALL APPLICABLE BUILDING CODES AND STANDARDS REQUIRED BY ALL AUTHORITIES HAVING JURISDICTION.\u003Cbr>• THIS FACILITY HAS BEEN DESIGNED TO COMPLY WITH THE TEXAS ACCESSIBILITY STANDARDS (TAS) AND THE AMERICANS WITH DISABILITIES ACT (ADA) . GRAPHIC GUIDELINES FOR CLEARANCES AT DOORS AND TOILET ROOMS HAVE BEEN PROVIDED FOR REFERENCE. WHERE DIMENSIONS INDICATED OR PRODUCTS SPECIFIED HEREIN DO NOT COMPLY WITH GUIDELINES NOTIFY THE ARCHITECT IN WRITING PRIOR TO ORDERING THE ITEM IN QUESTION OR CONSTRUCTING THE AFFECTED ASSEMBLY.\u003Cbr>• THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND REQUIRED DIMENSIONS ASTHEY RELATE TO NEW CONSTRUCTION PRIOR TO THE START OF CONSTRUCTION. REPORT ANY DISCREPANCIES BETWEEN EXISTING WORK AND THE DRAWINGS TO THE ARCHITECT PRIOR TO COMMENCING WORK.\u003Cbr>• DO NOT SCALE DRAWINGS; DIMENSIONS GOVERN. IN THE EVENT OF A CONFLICT, NOTIFY THE ARCHITECT FOR A RESOLUTION PRIOR TO PROCEEDING.\u003Cbr>• THE CONTRACTOR SHALL NOT STORE BUILDING MATERIALS, STAGE CONSTRUCTION OPERATIONS FROM, NOR GAIN ACCESS TO THE CONSTRUCTION SITE OVER ADJACENT PROPERTIES.\u003Cbr>• ALL PLAN DETAILS AND WALL SECTIONS ARE ASSUMED TO BE TYPICAL CONDITIONS UNLESS NOTED OTHERWISE.\u003Cbr>• ALL DAMAGE TO CONCRETE FLOOR SLAB CAUSED BY THE ATTACHMENT OF FORMWORK, BRACING, CONSTRUCTION TRAFFIC, MATERIAL STORAGE OR OTHER REASONS SHALL BE CLEANED AND PATCHED.\u003Cbr>• ALL PIPING, CONDUIT, ETC. RUN ON THE EXTERIOR FACE OF THE BUILDING SHALL BE PAINTED TO MATCH THE ADJACENT SURFACE.\u003Cbr>• PROVIDE EXIT SIGNAGE, FIRE EXTINGUISHERS, AND EMERGENCY LIGHTING AS REQUIRED BY LOCAL CODES.\u003Cbr>• CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED WORK; THEY DO NOT INDICATE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE WORK AND PERSONNEL DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO BRACING, SHORING OF LOADS (FINAL AND INTERIM CONSTRUCTION), EXCAVATION PROTECTION, SCAFFOLDING AND ALL OTHER JOB SITE SAFETY ISSUES. SITE OBSERVATION BY THE ARCHITECT, OWNER OR ENGINEER SHALL NOT CONSTITUTE INSPECTION OR APPROVAL OF ABOVE ITEMS.\u003Cbr>• ALL WELD BURNS, SCRATCHES, ETC. ON STRUCTURAL STEEL AND DECKING SHALL BE CLEANED AND REPAINTED TO MATCH ADJACENT SURFACES.\u003Cbr>• WINDOW AND CURTAINWALL SYSTEMS SHOWN ARE BASED ON MANUFACTURER STANDARD DETAILS AND SHALL BE USED FORBIDDING PURPOSES ONLY. SHOP DRAWINGS SHALL BE SUBMITTED WITH THE SEAL OF A REGISTERED PROFESSIONAL ENGINEER. LOAD CALCULATIONS SHALL REFLECT DESIGN VALUES AS REQUIR","cbCaiiKu6Hb13Jpj","https://ap.wps.com/l/cbCaiiKu6Hb13Jpj","pdf",24884373,63,"English","# Door Symbol\n## Door Number\n## General Notes","[{\"question\":\"What responsibilities does the contractor have regarding permits, tests, and compliance?\",\"answer\":\"The contractor procures and pays for required permits, tests, licenses, certificates, and registrations, and must give notices and comply with laws, ordinances, and regulations governing the work.\"},{\"question\":\"How should the project handle accessibility and door clearance guidance?\",\"answer\":\"The facility is designed to comply with Texas Accessibility Standards (TAS) and the Americans with Disabilities Act (ADA), with provided graphic clearance guidelines; discrepancies require notifying the architect in writing before ordering or constructing affected items.\"},{\"question\":\"What rules apply to drawing dimensions and conflict resolution?\",\"answer\":\"Do not scale drawings; dimensions govern. If a conflict exists, notify the architect for resolution before proceeding.\"}]","Door Symbol - Drawing Index | PDF",1792801368,159]