[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-663347-105":59,"doc-detail-663347-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","document-control-plan-pmp-appendix-l-draft-report","DOCUMENT CONTROL PLAN - PMP Appendix L - Draft Report","","This deliverable explains how CRC Program records are managed, controlled, and maintained in line with technical, management, and legal requirements. It outlines compliance commitments tied to federally assisted programs, including Title VI protections against discrimination. It also provides accessibility guidance for alternative document formats under ADA provisions and includes contact points and communication routing. The document further establishes a structured approach for record handling across correspondence types, web-publicized materials, NDA categories, and sensitive security information.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/document-control-plan-pmp-appendix-l-draft-report/663347/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/document-control-plan-pmp-appendix-l-draft-report/663347.png","ImageObject",300,407,{"name":92,"@type":93},"Maya Linwood","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":8},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the purpose of the Document Control Plan deliverable?","Question",{"text":112,"@type":113},"It describes the way CRC Program records are managed, controlled, and maintained according to technical, management, and legal requirements.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How does the project team address Title VI compliance?",{"text":117,"@type":113},"The team ensures full compliance with Title VI of the Civil Rights Act of 1964 by prohibiting discrimination by race, color, national origin, or sex in federally assisted programs and activities.",{"name":119,"@type":110,"acceptedAnswer":120},"What accessibility and alternate-format information is provided?",{"text":121,"@type":113},"Readers can request copies in alternative formats by contacting the CRC project office, and people who are deaf or hard of hearing can use the Telecommunications Relay Service by dialing 7-1-1.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},663347,1793226888,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144},962084928432,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","Road Map Item \\#: 5.2  \nProduct Name: DOCUMENT CONTROL PLAN  \nPMP Appendix: APPENDIX L  \nSubmittal Date: May 1, 2013  \nABSTRACT: This deliverable describes the manner in which records of the CRC Program will be managed, controlled, and maintained in accordance with technical,  \nmanagement, and legal requirements.  \nFFGA SUBMITTAL MAY 2013  \nDOCUMENT CONTROL PLAN  \nDraft Report  \nTitle VI  \nThe Columbia River Crossing project team ensures full compliance with Title VI of the Civil Rights Act of 1964 by prohibiting discrimination against any person on the basis of race, color, national origin or sex in the provision of benefits and services resulting from its federally assisted programs and activities. For questions regarding WSDOT’s Title VI Program, you may contact the Department’s Title VI Coordinator at (360) 705-7098. For questions regarding ODOT’s Title VI Program, you may contact the Department’s Civil Rights Office at (503) 986-4350.  \nAmericans with Disabilities Act (ADA) Information  \nIf you would like copies of this document in an alternative format, please call the Columbia River Crossing (CRC) project office at (360) 737-2726 or (503) 256-2726. Persons who are deaf or hard of hearing may contact the CRC project through the Telecommunications Relay Service by dialing 7-1-1.  \n¿Habla usted español? La informacion en esta publicación se puede traducir para usted. Para solicitar los servicios de traducción favor de llamar al (503) 731-4128.  \nTABLE OF CONTENTS  \n1. INTRODUCTION .................................................................................................................................... 1-1  \n1.1 Purpose ................................................................................................................................................. 1-1  \n1.2 Scope .................................................................................................................................................... 1-1  \n1.3 References ............................................................................................................................................ 1-1  \n1.4 Document Maintenance ......................................................................................................................... 1-2  \n2. ORGANIZATION AND RESPONSIBILITIES ................................................................................................2-1  \n2.1 Project Director ......................................................................................................................................2-1  \n2.2 Document Control Manager...................................................................................................................2-1  \n2.3 Public Disclosure Lead ..........................................................................................................................2-1  \n2.4 CAD Manager ........................................................................................................................................2-1  \n2.5 CRC Project Team Members.................................................................................................................2-1  \n2.6 Non Disclosure Agreement (NDA) Team ...............................................................................................2-1  \n2.7 Field Office Project Team ......................................................................................................................2-2  \n2.8 WSDOT IT .............................................................................................................................................2-2  \n3. MANAGEMENT OF PROJECT RECORDS .................................................................................................3-1  \n3.1 Document Control System .....................................................................................................................3-1  \n3.2 Project Records ....................................","cbCaisO2lxzBEyEv","https://ap.wps.com/l/cbCaisO2lxzBEyEv","pdf",1083301,43,"English","# INTRODUCTION\n## Purpose\n## Scope\n## References\n## Document Maintenance\n# ORGANIZATION AND RESPONSIBILITIES\n## Project Director\n## Document Control Manager\n## Public Disclosure Lead\n## CAD Manager\n## CRC Project Team Members\n## Non Disclosure Agreement (NDA) Team\n## Field Office Project Team\n## WSDOT IT\n# MANAGEMENT OF PROJECT RECORDS\n## Document Control System\n## Project Records\n## Project File Processes\n## Hardcopy Correspondence\n## Electronic Correspondence\n## Email used to Transmit Documents\n## Architectural and Engineering (A & E) Drawings\n## Web Publicized Documents Including Wiki Site Documents\n## Web Publicized Documents Process\n## Non Disclosure Agreements (NDA)\n## Internal NDA Agreements\n## Third Party NDA Agreements\n## Sensitive Security Information (SSI)\n## Identifying and Designating SSI\n## Marking SSI","[{\"question\":\"What is the purpose of the Document Control Plan deliverable?\",\"answer\":\"It describes the way CRC Program records are managed, controlled, and maintained according to technical, management, and legal requirements.\"},{\"question\":\"How does the project team address Title VI compliance?\",\"answer\":\"The team ensures full compliance with Title VI of the Civil Rights Act of 1964 by prohibiting discrimination by race, color, national origin, or sex in federally assisted programs and activities.\"},{\"question\":\"What accessibility and alternate-format information is provided?\",\"answer\":\"Readers can request copies in alternative formats by contacting the CRC project office, and people who are deaf or hard of hearing can use the Telecommunications Relay Service by dialing 7-1-1.\"}]","DOCUMENT CONTROL PLAN - PMP Appendix L - Draft Report | PDF",108]