[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-158207-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-158207-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","document-a133-2019-standard-form-of-agreement-between-owner-and-construction-manager","Document A133°-2019 - Standard Form of Agreement Between Owner and Construction Manager","","Standard form agreement AIA Document A133°-2019 sets the contract framework between an Owner and a Construction Manager as Constructor, using the Cost of the Work plus a Fee with a Guaranteed Maximum Price. The document includes initial information defining the project, parties, and governing general conditions, plus a structured Table of Articles covering provisions, responsibilities, compensation, cost of the work, accounting records, disputes, termination, and miscellaneous terms. It further specifies project plans and milestone dates as part of the initial agreement inputs.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/document-a133-2019-standard-form-of-agreement-between-owner-and-construction-manager/158207/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/document-a133-2019-standard-form-of-agreement-between-owner-and-construction-manager/158207.png","ImageObject",300,407,{"name":42,"@type":43},"wps_ap_test_251126_0180","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-31","2026-08-29",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",9,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What payment structure does AIA Document A133°-2019 use?","Question",{"text":63,"@type":64},"The agreement states the basis of payment is the Cost of the Work plus a Fee with a Guaranteed Maximum Price.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"Which documents or conditions are incorporated by reference?",{"text":68,"@type":64},"The document adopts AIA Document A201T-2017, General Conditions of the Contract for Construction, by reference, with instructions not to use other general conditions unless modified.",{"name":70,"@type":61,"acceptedAnswer":71},"What information is required under Article 1, Section 1.1?",{"text":72,"@type":64},"Section 1.1 requires initial information such as the Owner’s program, the Project’s physical characteristics, the budget for the Guaranteed Maximum Price, milestone dates, scheduling requirements, sustainable objectives, and other project information.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},158207,1787997055,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,106,111,115,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},6,"Technology",50,"technology",{"id":107,"doc_module":4,"doc_module_name":25,"category_name":108,"show_sort_weight":109,"slug":110},7,"Healthcare",40,"healthcare",{"id":112,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":113,"slug":114},8,30,"research-report",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":97,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":112,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":113,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":80,"read_time":143,"preview_page_count":4},8796095027276,"https://avatar.qwps.com/avatar/d3BzX2FwX3Rlc3RfMjUxMTI2XzAxODA=","# Document A133°-2019\n\nStandard Form of Agreement Between Owner and Construction Manager asConstructor where the basis .of payment is the Cost of the WorkPlus a Fee with a GuaranteedMaximum Price  \nAGREEMENT made as of the day of in the year2023(In words,Indicate day,month,andyear.)  \nBEIWEEN the Owner:(Name;legal status,address,and other informatlon)  \nUpshur County-Honorable Judge Todd Tefteller100W.Tyler StreetGilcer,Texas 75644(903)843-4003  \nand the Constuction Manager:(Name,legal status,address,and othar information)  \nComplex Contracting,Ine.dba JC Stoddard Construction12445 OId OConnor RoadSan Antonio,Texas 78233(210)653-1324  \nfor the following Project;(Name,locatton,and detailed description)  \nUpsbur County Courthouse Restoration100W.Tyler StieetGilmer,Texas 75644  \nThe Architect:(Name,legal status,address,and other information)  \nKarl Komatsu-Komatsu Aichitecture;Inc.3880 Hulen Street,Suite 300Fort Worth,Texas 76107(817)332-1914  \nThe Owner and Construction Manager agree as follows.  \nADDITION8 AND DELETIONS:The aulhor of this documant hasadded Informatien needed for.tscomplalon.The author may alsohave revlsed the taxt of the orfgInalAIA standard fom.An Addiltlons andDelefions Repor that notes addedInformatlon aswell as revislons份thestandard fom fext ls avallable fromthe authorand should be reviewed.Ayertlcal line In the let margin of thsdocument indlcates where the authorhas added necassary Informalionand wharea tha authar has addedto ordeleted from the orgtnal ALA text.  \nThls document has Important legalGansequences,Consuitaton with anaftorney is encouraged with respectto its complefon ormodificallon,  \nAIA DocumenlA201T-2017,General Conditions ofthe Contactfor Constructlon,is edopted in thisdocument by reference.Do nat usewith other general canditons unlessthis documant is modifed.  \n1  \nTABLE OF ARTICLES  \n1 INITIALINFORMATION  \n2 GENERAL PROVISIONS  \n3 CONSTRUCTION MANAGER'S RESPONSIBILITIES  \n4 OWNER'S RESPONSIBILTIES  \n5 COMPENSATIONAND PAYMENTS FOR PRECONSTRUCTTON PHASE SERVICES  \n6 COMPENSATION FOR CONSTRUCTION PHASE SERVICES  \n7 COSTOF THEWORKFOR CONSTRUCTION PHASE  \n8 DISCOUNTS,REBATES,AND REFUNDS  \n9 SUBCONTRACTS AND OTHER AGREEMENTS  \n10 ACCOUNTNG RECORDS  \n41 PAYMENTS FOR CONSTRUCTON PHASE SERVICES  \n12 DISPUTE RESOLUTTON  \n13 TERMINATION OR SUSPENSION  \n14 MISCELLANEOUS PROVSIONS  \n15 SCOPE OF THE AGREEMENT  \nEXHIBTA GUARANTEED MAXIMUMPRICE AMENDMENTEXHIBITB INSURANCEAND BONDS  \nARTICLE 1 INITIAL INFORMATON  \n## §1.1 This Agreement is based oz the Initial Information set forth in this Section 1.1.\n\n(For each item in this section,insert he information or a slatement such as\"not applicable\"or\"urnknown at fime ofexecution.”  \nUpshur County Courthouse Restoration plans and specifications dated 05/19/2023.  \n### §1.1.1 The Owner's program for the Project,as described in Section 4.1.1:\n\n(Insert the Owner's program,tdentify documentation that establishes the Owmer's program,or state the manner in whichthe program wlll be developed.)  \nUpshur County Courthouse Restoratiori plans and specifications dated 05/19/2023  \n### §1.1.2The Project's physical characteristics;\n\n(ldentify or describe pertinent infornation about the Profect's physical characterlsties,such as size;locaton;dimersions;geolechnical reports;site boundaries;topographic.surveys;trafic and utilty studles;cvailablity ofpubicandprivate ufllitles and services;legal deseriptfon ofthe site,etc.)  \nAs indicated in the Upshur County Courthouse Restoration plans and specifications dated 0S/19/2023.  \n511.3 The Owner's budget for the Guaraniteed Maximum Price,as defined in Article 6:(Provlde total and,Ifknown,a line ltem břeakdown.)  \nAADocumentA133-2013.Copyrlghte199,2003;209,and2019.AD ngits resanved,Tho AnterdcanLstuta ofArehtens)Amercean Lnslkute ofArchitets;AA \"theAALoso,and \"AAConitnetDoumans cireregtsleredtadamars or The Amenean Instiuta ofActlifects.The douimentwas producede 12:54:50ETn7DZS1702undarordar No.4104237047whith expros on 113012023,ISno","cbCaibdDjxqRDYrL","https://ap.wps.com/l/cbCaibdDjxqRDYrL","pdf",1532537,"English","# Table of Articles\n## 1 Initial Information\n## 2 General Provisions\n## 3 Construction Manager's Responsibilities\n## 4 Owner's Responsibilities\n## 5 Compensation and Payments for Preconstruction Phase Services\n## 6 Compensation for Construction Phase Services\n## 7 Cost of the Work for Construction Phase\n## 8 Discounts, Rebates, and Refunds\n## 9 Subcontracts and Other Agreements\n## 10 Accounting Records\n## 11 Payments for Construction Phase Services\n## 12 Dispute Resolution\n## 13 Termination or Suspension\n## 14 Miscellaneous Provisions\n## 15 Scope of the Agreement\n## Exhibit A Guaranteed Maximum Price Amendment\n## Exhibit B Insurance and Bonds\n# Article 1 Initial Information\n## §1.1 This Agreement is based on the Initial Information set forth in this Section 1.1.\n## §1.1.1 The Owner's program for the Project\n## §1.1.2 The Project's physical characteristics\n## §1.1.3 The Owner's budget for the Guaranteed Maximum Price\n## §1.1.4 The Owner's anticipated design and construction milestone dates\n## §1.1.5 The Owner's requirements for accelerated or fast-track scheduling, or phased construction\n## §1.1.6 The Owner's anticipated Sustainable Objective for the Project","[{\"question\":\"What payment structure does AIA Document A133°-2019 use?\",\"answer\":\"The agreement states the basis of payment is the Cost of the Work plus a Fee with a Guaranteed Maximum Price.\"},{\"question\":\"Which documents or conditions are incorporated by reference?\",\"answer\":\"The document adopts AIA Document A201T-2017, General Conditions of the Contract for Construction, by reference, with instructions not to use other general conditions unless modified.\"},{\"question\":\"What information is required under Article 1, Section 1.1?\",\"answer\":\"Section 1.1 requires initial information such as the Owner’s program, the Project’s physical characteristics, the budget for the Guaranteed Maximum Price, milestone dates, scheduling requirements, sustainable objectives, and other project information.\"}]","Document A133°-2019 - Standard Form of Agreement Between Owner and Construction Manager | PDF",76]