[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-513115-105":59,"doc-detail-513115-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","dnd-yarrows-shipyard-remediation-project-overview-and-site-history","DND Yarrows Shipyard Remediation - Project Overview and Site History","","This report provides an in-depth overview of the DND Yarrows Shipyard remediation project located at CFB Esquimalt in Victoria, British Columbia. It details the project scope, which includes barrier wall construction, site restoration, and the remediation of contaminated fill beneath the historic 1924 shoreline. The document outlines the historical context of the shipyard, detailing its operational timeline from 1893 to 1994, its significance during World War II, and its eventual acquisition by the Department of National Defence. Furthermore, it chronicles the risk management and remediation efforts undertaken between 1996 and 2009, highlighting the detection of hydrocarbons, the federal funding received through the FCSAP program, and the successful completion of the restoration efforts as a model of environmental site management.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/dnd-yarrows-shipyard-remediation-project-overview-and-site-history/513115/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/dnd-yarrows-shipyard-remediation-project-overview-and-site-history/513115.png","ImageObject",300,407,{"name":92,"@type":93},"Muffet","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-16","2026-10-06",true,{"@type":102,"interactionType":103,"userInteractionCount":39},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What was the primary scope of the DND Yarrows Shipyard remediation project?","Question",{"text":112,"@type":113},"The project scope included constructing three material laydown areas, building a perimeter barrier wall, remediating contaminated fill below the 1924 shoreline, and overall site restoration.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What environmental concerns prompted the remediation of the Yarrows site?",{"text":117,"@type":113},"In 2006, high concentrations of hydrocarbons were detected in monitoring wells, and visible Bunker C fuel was identified, leading to the site being classified as a Class 1 contaminated area.",{"name":119,"@type":110,"acceptedAnswer":120},"How was the remediation project funded and overseen?",{"text":121,"@type":113},"Funding for the project was secured through the Federal Contaminated Sites Action Plan (FCSAP) program, with oversight provided by the Site Remediation Board (SRB).","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},513115,1791496632,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":39,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145,"preview_page_count":24,"preview_urls":146},962090768927,"https://ap-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","# DND YARROWS SHIPYARDREMEDIATION\n\nCHALLENGES IN BARRIER WALL  \nCONSTRUCTION AND SITE REMEDIATIONON ESQUIMALT HARBOUR  \nCFB EsquimaltVictoria,British Columbia  \n# PROJECT SCOPE\n\n·Construction of three laydown areas for sitematerial.  \n● Construction of a barrier wall around theperimeter of the site  \n● Remediation of contaminated fill below thehistoric 1924 shoreline.  \n● Site restoration.  \nCFB ESQUIMALT PROPERTIES,VICTORIA,BC  \n# Yarrows History\n\n·Operational shipyard from 1893-1994  \n·Peak operations during WW2,4300 workers  \n·Many HMC ships (22),Liberty Ships,and BC Ferries werebuilt at the Yarrows Shipyards  \n·Insolvency in 1994;in 19962 acres 'sold'to Town ofEsquimalt($1);and 12 acres to DND ($1),with knownenvironmental liability of $6-8 million (soil and sedimentcontamination)  \n·Acquisition was “A‘once in a lifetime'opportunity tolink Naden with the Dockyard“(VAdm P.W.Cairns,Commander Maritime Command,1992).  \n# DND YARROWS LOCATION\n\n# Yarrows History\n\n·Risk management strategy employed from 1996-2006  \n·In 2002 the surficial debris was removed from the site and itwas restored as a materials laydown and storage area.  \n·In 2006,high concentrations of hydrocarbons were detected in4 monitoring wells and visible Bunker C was noted in one.  \n·Site was re-evaluated and determined that remediation wasrequired(Class 1 Site)  \n·Funding for remediation was secured through FederalContaminated Sites Action Plan program,with SRB oversight  \n·Remediation and site restoration began in 2008 and wascompleted in 2009.  \n·Yarrows Remediation Project is a true FCSAP success story  \n# YARROWS SHIPYARD HISTORY\n\nYarrows Shipyard-Circa 1921  \n# YARROWS SHIPYARD州STORY\n\nYarrows Shipyard-Circa 1960's  \nTravaux publics et  \nServices gouvernementaux  \nCanada  \n# YARROWS SHIPYARD HISTORY\n\nNational DéfenseDefence nationale  \n# DND YARROWS LOCATION","cbCaibsd7DZI3zwK","https://ap.wps.com/l/cbCaibsd7DZI3zwK","pdf",6779202,45,"English","# Project Scope\n# Yarrows History\n## Risk Management and Remediation (1996-2009)\n## Historical Timeline and Significance","[{\"question\":\"What was the primary scope of the DND Yarrows Shipyard remediation project?\",\"answer\":\"The project scope included constructing three material laydown areas, building a perimeter barrier wall, remediating contaminated fill below the 1924 shoreline, and overall site restoration.\"},{\"question\":\"What environmental concerns prompted the remediation of the Yarrows site?\",\"answer\":\"In 2006, high concentrations of hydrocarbons were detected in monitoring wells, and visible Bunker C fuel was identified, leading to the site being classified as a Class 1 contaminated area.\"},{\"question\":\"How was the remediation project funded and overseen?\",\"answer\":\"Funding for the project was secured through the Federal Contaminated Sites Action Plan (FCSAP) program, with oversight provided by the Site Remediation Board (SRB).\"}]","DND Yarrows Shipyard Remediation - Project Overview and Site History | PDF",1791280363,113,[147,151,155,159,163],{"page_no":8,"url":148,"width":149,"height":150},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/98abbc2b7aa14df70c601f14f6933d74.webp",983,736,{"page_no":14,"url":152,"width":153,"height":154},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/e0c936405dafe3a3c4513dbee5c5b634.webp",982,735,{"page_no":81,"url":156,"width":157,"height":158},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/439980ab811130e095840d6e3b56db1a.webp",981,734,{"page_no":19,"url":160,"width":161,"height":162},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/b71daa3ee9f56e39cece28e51ac03820.webp",980,733,{"page_no":24,"url":164,"width":165,"height":162},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/879ba22d10ca6d8d0d64f0c2ff952b2f.webp",979]