[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-674434-105":59,"doc-detail-674434-en":129},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":122,"head_meta":124,"extra_data":126,"updated_unix":128},105,"en","division-e-utilities-standards-and-specifications-manual","Division “E” - Utilities Standards and Specifications Manual","","Division “E” - Utilities standards and specifications manual sets out utility coordination and lighting design criteria, including requirements for submitting utility coordination drawings for municipal approval. It describes utility hierarchy, required information to be shown on plans for both underground and above-ground services, approval circulation with stamps and digital signatures, and scale and file-naming conventions. Sections cover design criteria for street lighting, municipal parking lots, and parks, plus approved manufacturers and luminaire specifications including Cobra Head, Traditional, and Contemporary styles.",{"@graph":69,"@context":121},[70,84,104],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/division-e-utilities-standards-and-specifications-manual/674434/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":98,"encodingFormat":97,"isAccessibleForFree":99,"interactionStatistic":100},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/division-e-utilities-standards-and-specifications-manual/674434.png","ImageObject",300,407,{"name":92,"@type":93},"Melati","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-04",true,{"@type":101,"interactionType":102,"userInteractionCount":4},"InteractionCounter",{"@type":103},"ViewAction",{"@type":105,"mainEntity":106},"FAQPage",[107,113,117],{"name":108,"@type":109,"acceptedAnswer":110},"What is required for Utility Coordination drawings submission to the City?","Question",{"text":111,"@type":112},"Submit a complete set of Utility Coordination drawings for City approval, and include them as a schedule in the agreement between the City and the owner. For the second submission stage, forward the utility coordination plan and all engineering drawings to participating utility companies.","Answer",{"name":114,"@type":109,"acceptedAnswer":115},"How do utility companies and the consultant handle conduit or duct structures?",{"text":116,"@type":112},"Utility companies indicate whether conduit and duct structures are required and specify their location and nature. After receiving marked-up drawings from the utilities, the consultant incorporates the duct structure design onto the originals.",{"name":118,"@type":109,"acceptedAnswer":119},"What information must be shown on the utility coordination drawings?",{"text":120,"@type":112},"The drawings must show required underground services and above-ground services, including items such as valve chambers, water service curb stops, LID and stormwater facilities, hydrants and water valves, utility route locations, power feeds to streetlights, and major utility hubs/vaults, among other listed features.","https://schema.org",{"og:url":83,"og:type":123,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":125,"canonical":83},"index,follow",{"doc_id":127,"site_id":62},674434,1793762639,{"code":4,"msg":5,"data":130},{"doc_id":127,"user_id":131,"nickname":92,"user_avatar":132,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":4,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":138,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":128,"read_time":143},962085570644,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","Division “E”  \nUtilities  \nStandards and Specifications Manual  \nDivision “E” -Utilities  \nIndex  \nSection Description  \nE1 Design Criteria-Utilities  \nE2 City of Richmond Hill Standard Drawings-Utilities  \nE-1 Utility Coordination Drawing  \nE3 Adopted Ontario Provincial Standard Drawings  \nE3 .1 OPSD Division 200-Grading Sections  \nE4 Design Criteria-Street Lighting  \nE4 .1 General Requirements  \nE4 .2 Lighting Design  \nE4 .3 Street Lighting Design Criteria and Recommended Values  \nE4 .4 Material Specifications  \nE4 .5 Standard Design-Roads  \nE4 .6 Decorative Design-Roads  \nE4 .7 Pedestrian Walkways, Sidewalks and Bikeways Design  \nE4 .8 Pole Locations  \nE4 .9 Underground Services  \nE4 .10 Means of Disconnect  \nE4 .11 Smart Lighting Control System  \nE4 .12 Standard Drawings  \nE4 .13 Submission Requirements  \nE5 Design Criteria-Municipal Parking Lots Lighting  \nE5.1 General Requirements  \nE5.2 Material Specifications  \nE5.3 Lighting Design  \nE5.4 Pole Locations  \nE5.5 Pole Number and Tagging  \nE5.6 Underground Services  \nDivision “E” -Utilities  \nSection Description  \nE5.7 Standard Design  \nE5.8 Lighting Controls  \nE5.9 Submission Requirements  \nE6 Design Criteria-Municipal Parks and Sports Facilities Lighting  \nE6.1 General Requirements  \nE6.2 Material Specifications  \nE6.3 Lighting Design  \nE6.4 Pole Locations  \nE6.5 Underground Services  \nE6.6 Pole Design  \nE6.7 Lighting Controls  \nE6.8 Submission Requirements  \nE7 Approved Manufacturers and Products  \nE7.1 City-Approved LED Roadway and Pedestrian Luminaires  \nE7.2 City-Approved Loadcentre Pedestals  \nE7.3 City-Approved Smart Control System Components  \nE7.4 City-Approved LED Municipal Parking Lot Luminaires  \nE7.5 City-Approved LED Park Luminaires & Poles  \nAppendix E-1 Materials Specifications: Cobra Head Style LED Luminaires  \nAppendix E-2 Materials Specifications: Traditional (Coach/Lantern) Style LED Luminaires  \nAppendix E-3 Materials Specifications: Contemporary Style (Shoe Box) LED Luminaires  \nDesign Criteria-Utilities  \n.1 General  \na) The developer and/or his consultants are required to submit to the City, for approval, a complete set of Utility Coordination drawings, which are to be included as a schedule to the agreement between the City and the owner.  \nb) At the second submission stage for the Municipal drawings, the Utility Coordination plan and all engineering drawings are to be forwarded to the participating utility companies. The utility companies will then identify whether or not any conduit and duct structures are required and, if so, indicate the location and nature of same. Upon return of the marked-up utility drawings to the consultant, the consultant shall incorporate the duct structure design on the originals.  \nc) The drawings are to be circulated to and approved by each right-of-way user prior to submission to the City for review. Each approval is to be indicated on a stamp that is to be included on each drawing.  \nd) Approved drawings to be circulated to all signing right-of-way users. Drawings are to be circulated electronically with a digital signature from all of the right-of-way users. The Utility Coordination drawing is also to be signed by the Developer’s Engineer. Once the drawings have final approval, a pdf copy of each is to be provided to all right-of-way users for their use.  \ne) For non-typical plant locations, a standard drawing/detail section will be required on the Utility Coordination drawing indicating the location of the respective utility’s plant and any potential conflicts with other plant that would typically be adjacent.  \nf) Utility Coordination electronic drawing file names to include the submission number (1st, 2nd, etc. ) and the date of the submission.  \ng) All Utility Coordination drawings shall be to a scale of 1:500 minimum and include the following utilities, services and appurtenances.  \n.1.1 Utility Hierarchy  \nThe following hierarchy of utilities and municipal servicing will apply when determining plant location","cbCaiaznASvIwbTw","https://ap.wps.com/l/cbCaiaznASvIwbTw","pdf",914886,61,"English","# Index\n## Section Description\n## E1 Design Criteria-Utilities\n## E2 City of Richmond Hill Standard Drawings-Utilities\n## E3 Adopted Ontario Provincial Standard Drawings\n## E4 Design Criteria-Street Lighting\n## E5 Design Criteria-Municipal Parking Lots Lighting\n## E6 Design Criteria-Municipal Parks and Sports Facilities Lighting\n## E7 Approved Manufacturers and Products\n## Appendix E-1 Materials Specifications: Cobra Head Style LED Luminaires\n## Appendix E-2 Materials Specifications: Traditional (Coach/Lantern) Style LED Luminaires\n## Appendix E-3 Materials Specifications: Contemporary Style (Shoe Box) LED Luminaires\n## Design Criteria-Utilities","[{\"question\":\"What is required for Utility Coordination drawings submission to the City?\",\"answer\":\"Submit a complete set of Utility Coordination drawings for City approval, and include them as a schedule in the agreement between the City and the owner. For the second submission stage, forward the utility coordination plan and all engineering drawings to participating utility companies.\"},{\"question\":\"How do utility companies and the consultant handle conduit or duct structures?\",\"answer\":\"Utility companies indicate whether conduit and duct structures are required and specify their location and nature. After receiving marked-up drawings from the utilities, the consultant incorporates the duct structure design onto the originals.\"},{\"question\":\"What information must be shown on the utility coordination drawings?\",\"answer\":\"The drawings must show required underground services and above-ground services, including items such as valve chambers, water service curb stops, LID and stormwater facilities, hydrants and water valves, utility route locations, power feeds to streetlights, and major utility hubs/vaults, among other listed features.\"}]","Division “E” - Utilities Standards and Specifications Manual | PDF",154]