[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-648405-105":59,"doc-detail-648405-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","division-02-existing-conditions-02-01-00-maintenance-of-existing-conditions","DIVISION 02 - EXISTING CONDITIONS - 02 01 00 MAINTENANCE OF EXISTING CONDITIONS","","DIVISION 02 provides technical requirements and coordination guidance for managing existing conditions on Rutgers University projects. It specifies design considerations and documentation placeholders for maintenance of site remediation, underground storage tank removal, facility remediation, hazardous waste drum handling, survey planning, commissioning, and assessment activities. It details scheduling coordination, authorization before survey work, survey drawing and method submittals, and surveying standards for New Jersey state plane coordinates and datum requirements. It also outlines triggers for site surveys, boundary marker decisions, and assessment needs for movement, vibration, traffic, accessibility, and environmental sampling, testing, and comparison to NJDEP standards.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/division-02-existing-conditions-02-01-00-maintenance-of-existing-conditions/648405/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/division-02-existing-conditions-02-01-00-maintenance-of-existing-conditions/648405.png","ImageObject",300,407,{"name":92,"@type":93},"FajarTechTalk","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-25","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"Who must be coordinated for maintenance of existing conditions, such as remediation and hazardous waste handling?","Question",{"text":112,"@type":113},"Maintenance of site remediation, underground storage tank removal, facility remediation, and hazardous waste drum handling must be coordinated with Rutgers University on an individual project basis.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What approvals are required before survey work begins?",{"text":117,"@type":113},"Before survey work starts, the design team must provide Rutgers Facilities Office of Planning and Development with a drawing identifying the survey area and an outline of surveying methods and anticipated information. Planning authorizes the start after review and acceptance.",{"name":119,"@type":110,"acceptedAnswer":120},"What are the surveying and geodetic requirements for site surveys in New Jersey?",{"text":121,"@type":113},"Site surveys must be prepared by a licensed New Jersey surveyor, use 1-foot contour intervals, and be spatially registered to New Jersey state plane coordinates projected in Transverse Mercator. NAD 1983 is required for the horizontal plane and NAV88 for the vertical plane, with data delivered in feet.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},648405,1792941867,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145},962094249465,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","DIVISION 02 – EXISTING CONDITIONS  \n02 01 00 MAINTENANCE OF EXISTING CONDITIONS  \nA. Design Considerations  \n1. Maintenance of site remediation, underground storage tank removal, facility remediation, and hazardous waste drum handling shall be coordinated with Rutgers University on an individual project basis.  \nB.  Special Documentation Requirements  \nRESERVED  \nC. Materials and Methods of Construction  \nRESERVED  \n02 05 00 COMMON WORK RESULTS FOR EXISTING  \nCONDITIONS  \nRESERVED  \n02 06 00 SCHEDULES FOR EXISTING CONDITIONS  \nA. Design Considerations  \n1. Scheduling of existing site investigations such as, but not limited to, survey work, environmental assessments, and subsurface investigations shall be coordinated with the Office of Planning and Development and Rutgers Environmental Health and Safety. A proposed schedule shall be submitted for approval prior to the start of any existing site investigations.  \nB.  Special Documentation Requirements  \nRESERVED  \nC. Materials and Methods of Construction  \nRESERVED  \n02 08 00 COMMISSIONING OF EXISTING CONDITIONS  \nRESERVED  \n02 21 00 SURVEYS  \nA. Design Considerations  \nRESERVED  \nB.  Special Documentation Requirements  \n1. Prior to the start of survey work, the design team shall provide Rutgers Facilities Office of Planning and Development (Planning) with a drawing identifying the area to be surveyed. In addition, an outline of surveying methods and anticipated survey information shall be provided. Upon review and acceptance of the proposed survey area and methods, Planning will authorize the start of survey work. If a geotechnical investigation is performed as part of a University project, the project’s survey should include the boring and/or test pit locations.  \na. Site Surveys: Site surveys shall be prepared by a licensed surveyor in the State of New Jersey. Surveys shall include 1-foot contour intervals, spot grades, trees and their drip lines, surface improvements including, but not limited to, roadways, curbs, sidewalks, vegetation limits, and above grade site features. Surveys shall include underground utility information available from the University and from municipal and public sources. All surveys should include information/data at least 25 feet beyond the drawing identifying the survey boundary. The surveys shall be delivered as a signed and sealed hardcopy and in Autodesk CAD format (version 2010) . Surveys must be spatially registered to New Jersey state plane coordinates (SPC) projected in Transverse Mercator. The North American Datum of 1983 is required for mapping in the horizontal plane and the North American Vertical Datum of 1988 (NAV88) is required for the vertical plane. All data should be delivered in feet.  \nC. Materials and Methods of Construction  \n1. Boundary and Survey Markers: The necessity for a boundary survey and survey markers will be determined by the Rutgers University Office of Planning and Development on an individual project basis.  \nAt Rutgers University’s discretion, control points used during the survey work should be provided by the University. The control points shall be metal pins set at agreed upon locations between the project surveyor and Rutgers University.  \n02 22 00 EXISTING CONDITIONS ASSESSMENT  \nA. Design Considerations  \n1. Depending on existing site conditions and the proposed project, existing condition assessments may be required. The need for such assessments will be determined on an individual project basis by Rutgers University.  \n2. Movement and vibration assessment to existing areas shall be preformed as required. The need for such assessments will be determined on a project by project basis by Rutgers University.  \n3. Traffic assessment to existing roads, walkways, and all other vehicular and/or bicycle/pedestrian areas shall be performed as required. The need for such assessments will be determined on an individual project basis by Rutgers University.  \n4. Accessibility assessment shall be performed as required. T","cbCairyfNK1KPG4h","https://ap.wps.com/l/cbCairyfNK1KPG4h","pdf",209136,15,"English","# DIVISION 02 – EXISTING CONDITIONS\n## 02 01 00 MAINTENANCE OF EXISTING CONDITIONS\n## 02 05 00 COMMON WORK RESULTS FOR EXISTING CONDITIONS\n## 02 06 00 SCHEDULES FOR EXISTING CONDITIONS\n## 02 08 00 COMMISSIONING OF EXISTING CONDITIONS\n## 02 21 00 SURVEYS\n## 02 22 00 EXISTING CONDITIONS ASSESSMENT\n## 02 24 00 ENVIRONMENTAL ASSESSMENT\n## 02 25 00 EXISTING MATERIAL ASSESSMENT","[{\"question\":\"Who must be coordinated for maintenance of existing conditions, such as remediation and hazardous waste handling?\",\"answer\":\"Maintenance of site remediation, underground storage tank removal, facility remediation, and hazardous waste drum handling must be coordinated with Rutgers University on an individual project basis.\"},{\"question\":\"What approvals are required before survey work begins?\",\"answer\":\"Before survey work starts, the design team must provide Rutgers Facilities Office of Planning and Development with a drawing identifying the survey area and an outline of surveying methods and anticipated information. Planning authorizes the start after review and acceptance.\"},{\"question\":\"What are the surveying and geodetic requirements for site surveys in New Jersey?\",\"answer\":\"Site surveys must be prepared by a licensed New Jersey surveyor, use 1-foot contour intervals, and be spatially registered to New Jersey state plane coordinates projected in Transverse Mercator. NAD 1983 is required for the horizontal plane and NAV88 for the vertical plane, with data delivered in feet.\"}]","DIVISION 02 - EXISTING CONDITIONS - 02 01 00 MAINTENANCE OF EXISTING CONDITIONS | PDF",1792793379,38]