[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-648503-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-648503-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","development-permit-applications-required-drawings","Development Permit Applications - Required Drawings","","Development permit and site plan requirements specify what drawings must accompany applications for erecting, constructing, altering, replacing, or relocating buildings and structures, and for changes in land or building use. The document lists drawing components for new signs and new construction, including scaled site plans, lot dimensions, building locations and heights, landscaping and fencing, parking, loading, driveways, outdoor storage for industrial and commercial uses, and watercourses with measured distances. It also addresses storm water management, maintenance plans, and confirms when site plan approval is needed in Hebbville.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/development-permit-applications-required-drawings/648503/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/development-permit-applications-required-drawings/648503.png","ImageObject",300,407,{"name":42,"@type":43},"Mimi","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-23",true,{"@type":52,"interactionType":53,"userInteractionCount":33},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"When is a development permit required under these rules?","Question",{"text":62,"@type":63},"A development permit is required for erecting, constructing, adding to, altering, replacing, or relocating buildings or structures, including temporary structures, and for changes in land or building use. It also applies to advertising signs and fences over six feet in height.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What drawings must be submitted for new signs with a development permit application?",{"text":67,"@type":63},"A scaled drawing must be provided that sketches the sign and the building, including where the sign will be attached to the building or located on the lot.",{"name":69,"@type":60,"acceptedAnswer":70},"What additional materials are required for a Site Plan application in Hebbville?",{"text":71,"@type":63},"A Site Plan application must include drawings for new signs and new construction plus a storm water management plan and maintenance plans. It also lists other required details such as lighting, parking and access features, landscaping, fencing, outdoor storage, and watercourses.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},648503,1792793787,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":33,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":26,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":79,"read_time":96},2336477974920,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","DEVELOPMENT PERMIT APPLICATIONS-REQUIRED DRAWINGS  \nAny person or party intending to erect,construct,add to,alter,replace,or relocate any building or part of abuldlng or structure,including temporary structures;change or alter the use of land,buildings or structuresrequires a Development Permilt.This also includes the location.of any advertising signs and fences over sixfeet in height.  \nEvery application for a Development Permit shall be accompanied by the following drawings:  \n1)   FOR NEW SIGNS-Sketch the sign and the building (scaled drawing).Show where the sign will beattached to the building or located on the lot.  \n2)   FOR NEW CONSTRUCTION(new bulldings,or additions to existing buildings)  \nProvlde a scaled drawing showing the following:  \n·The lot and the dimensions of the lot(width,length and area)  \n·The locatilon of any existing and proposed buldings (including the distance between buildingsand the distance from lot lines)  \n·The height and dimenslon of the proposed construction  \n·The proposed and existing landscaping and fencing (indicate the height of the fence)  \n·For Industrial and commerclal uses,show the outdoor storage areas.  \n·The location of any watercourses,and the distance between any proposed construction andthe watercourse,  \n·The existing and proposed parking areas,loading spaces and driveways  \n# SITE PLANS(HEBBVILLE ONLY)-REQUIRED DRAWINGS\n\nThe Village of Hebbville Land Use By-law specifies certain developments that are only permitted by SitePlans.If the property on which the construction Is proposed is not located in the Village of Hebbvlle,youwill not be requlred to obtain a Site Plan approval.if the property is located in the Village of Hebbville,please confirm with the Development Officer whether you are required to obtain either a Site Plan approvalor a Development Permit.  \nEvery application for a Site Plan shall be accompanied by the following drawings:  \n1.   FOR NEW SIGNS-Sketch the sign and the building(scaled drawing).Show where theisign will beattached to the building or located on the lot.  \n2.   FOR NEW CONSTRUCTION  \na)Ascaled drawing showlng:  \n·The true shape and dimension of the lot to be used or upon which the development isproposed to construct or locate any building or structure;  \n·The proposed location and dimenslons of any building or structure for which the proposal isapplied and the location information shall include measurements of the distance between thebuilding or structure and lot lines;  \n·The location of every building or structure already constructed,or partly constructed on such lotand location of every buildlng or structure existing upon adjacent lots;  \n·The proposed and existing location and dimensions of parking areas,parking spaces,loadingspaces,driveway accesses,pedestrian walkways and curbs;  \n·The location of existing and proposed landscaplng,fencing and outdoor storage areas;  \n·The location of proposed lighting for driveways and pedestrian ways;  \n·The location of watercourses  \nb)A storm water management plan  \nc)Maintenance plans for the above,  \nnay uot be the sane as what your.property looks líke.use thís only as a guíde andsubmit your own sketch wíth relevant inforuaton.  \nHeíght  \nOTHER REQLIRGMENTS  \n● Dimenslon ofsign  \n●  Dimension of Buíldíw  \n·Helght of sign","cbCaite9cHiKMiPm","https://ap.wps.com/l/cbCaite9cHiKMiPm","pdf",84678,"English","# Required Drawings for Development Permits\n## New Signs\n## New Construction\n# Site Plans (Hebbville Only)\n## Confirming Whether a Site Plan Is Required\n## Required Drawings for Site Plans\n### New Signs\n### New Construction\n## Storm Water Management Plan\n## Maintenance Plans\n## Other Requirements","[{\"question\":\"When is a development permit required under these rules?\",\"answer\":\"A development permit is required for erecting, constructing, adding to, altering, replacing, or relocating buildings or structures, including temporary structures, and for changes in land or building use. It also applies to advertising signs and fences over six feet in height.\"},{\"question\":\"What drawings must be submitted for new signs with a development permit application?\",\"answer\":\"A scaled drawing must be provided that sketches the sign and the building, including where the sign will be attached to the building or located on the lot.\"},{\"question\":\"What additional materials are required for a Site Plan application in Hebbville?\",\"answer\":\"A Site Plan application must include drawings for new signs and new construction plus a storm water management plan and maintenance plans. It also lists other required details such as lighting, parking and access features, landscaping, fencing, outdoor storage, and watercourses.\"}]","Development Permit Applications - Required Drawings | PDF"]