[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-664597-105":59,"doc-detail-664597-en":134},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":127,"head_meta":129,"extra_data":131,"updated_unix":133},105,"en","developers-guide-ttc-review-submission-requirements","DEVELOPER’S GUIDE - TTC Review Submission Requirements","","DEVELOPER’S GUIDE outlines TTC submission requirements for developments adjacent to or connecting with TTC structures or right-of-way, including developments within 60 metres and special proximity rules. It explains how TTC planning review and TTC technical review operate alongside the City of Toronto’s planning and building permitting process, what modifications may be required, and how written responses to technical comments are handled. It also details preliminary coordination steps, access to TTC facility drawings via an NDA, review-level initiation, and preliminary meetings for higher review levels.",{"@graph":69,"@context":126},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/developers-guide-ttc-review-submission-requirements/664597/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/developers-guide-ttc-review-submission-requirements/664597.png","ImageObject",300,407,{"name":92,"@type":93},"Bintang","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118,122],{"name":109,"@type":110,"acceptedAnswer":111},"What is the purpose of a TTC review for nearby development proposals?","Question",{"text":112,"@type":113},"The TTC review ensures proposed developments do not adversely impact TTC’s current and future operations, or the integrity of TTC facilities, property, and structures.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How are TTC planning review and TTC technical review handled in the overall approval process?",{"text":117,"@type":113},"The guide states TTC planning review and TTC technical review are conducted alongside the municipal approval process, running concurrently with the City Planning & Building permitting process.",{"name":119,"@type":110,"acceptedAnswer":120},"What steps are required to start the TTC technical review process?",{"text":121,"@type":113},"The guide requires contacting the TTC Development Coordinator for preliminary information, submitting the Request for Review Level form with associated materials to initiate the technical review, and providing additional steps such as preliminary meetings for certain higher review levels.",{"name":123,"@type":110,"acceptedAnswer":124},"How does a third party obtain TTC facility drawings needed for the review?",{"text":125,"@type":113},"A third party must execute a Non-Disclosure Agreement (NDA) with the TTC, then visit the TTC office to view and select archived contract library drawings; selected drawings are emailed after the visit, and release is subject to fees and TTC consent on reproduction or transmission.","https://schema.org",{"og:url":83,"og:type":128,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":130,"canonical":83},"index,follow",{"doc_id":132,"site_id":62},664597,1793261313,{"code":4,"msg":5,"data":135},{"doc_id":132,"user_id":136,"nickname":92,"user_avatar":137,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":138,"file_id":139,"file_url":140,"file_type":141,"file_size":142,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":143,"language":144,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":145,"faqs":146,"seo_title":147,"seo_description":67,"update_tm":133,"read_time":148},962085564381,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","# DEVELOPER’S GUIDE\n\nTTC Submission Requirements for Developments  \nAdjacent or Connecting to TTC Structures or Right-of-Way  \n## Table of Contents\n\n1.0 Purpose of a TTC Review  \n2.0 Expediting TTC Reviews  \n3.0 Planning Review  \n3.1 Land Transfer/Exchange Agreement  \n3.2 Construction Agreement  \n3.3 Mutual Easement and Shared Facilities Agreement (MESFA)  \n3.4 Mutual Easement and Shared Facilities Agreement (MESFA) for Entrance Connections  \n4.0 Technical Review  \n4.1 Technical Review Classification  \n5.0 Cost Reimbursable Technical Reviews  \n6.0 Costs Not Covered By Technical Review Fees  \n7.0 Technical Review Submission Requirements  \n7.1 Level 1 & 2 Reviews – Developments Within 60-Metres of TTC Structures or R-O-W  \n7.2 Level 3 & 4 Reviews – Developments Founded Near TTC Structures or R-O-W  \n7.3 Level 5 & 6 Reviews – Developments Overtop of or within 1 metre of a TTCStructure and/or Connecting to TTC Structure  \n7.4 Property Protection Technical Review Submissions  \n7.5 Entrance Connection Technical Review Submissions  \n7.6 Technical Review Drawing & Report Submission Requirements  \n8.0 TTC Contact for Review Process  \nAppendices  \nI Non-Disclosure Agreement  \nII Land Surveys and Associated Submittals  \nIII Monitoring Plan – Review and Alert Levels and Action Protocol  \nIV Requirements for Condition Survey of TTC Structures  \nV Building Adjacent to TTC Substations – A Guideline  \nVI Submission Requirements for Developments Adjacent or Overtop of Planned or Future TTCStructures or Right of Way (R-O-W) .  \nDecember 2018 Page 1 of 37  \nThe Toronto Transit Commission (TTC) reviews development proposals which are locatedwithin 60 metres of a TTC structure or right-of-way (R-O-W) . This review ensures that aproposed development will not adversely impact TTC’s current and future operations orimpact the integrity of TTC’s facilities, property, and structures.  \nThe TTC review of a development proposal is broken down into two separate review types:TTC Planning Review - examining transportation/urban planning and TTC Technical Review  \n– examining the technical engineering aspects of the proposal. This review process followsthe municipal approval process running concurrently with the City Planning & Buildingpermitting process.  \nThe following graphic depicts, in general terms, the TTC reviewprocess which runs concurrently with the City of Torontoplanning application and building permitting.  \nDecember 2018 Page 2 of 37  \nAs a result of the Planning or Technical Review, modification of the development proposalmay be required in order to bring the development into conformance with TTC requirements,and/or reduce or eliminate any impact(s) on TTC operations, facilities, property, and/orstructures. For developments that are subject to a TTC Technical Review, written responsesto comments will be required, explaining rationale or indicating agreement to make changes .Upon receipt of technical documents that address technical comments satisfactorily, TTCwill provide written notice to the Developer. The City of Toronto requires TTC’s writtennotice of the satisfactory completion of the Technical Review prior to entering into a siteplan agreement and prior to issuing a shoring/building permit for the proposed development.  \n## 2.0 TTC Reviews\n\nPrior to the submission of a planning application it is recommended that the Developercontact the TTC’s Development Coordinator to discuss the proposal and potential impactsupon TTC property, facilities, and/or structures.  \nThe following steps are required as part of the TTC Technical review process:  \n1. Contact the TTC’s Development Coordinator for preliminary information regarding thelocation of the development site in relation to the TTC 60m Development Review Zoneandthe need for a TTC Technical Review.  \nIn order to establish the location of TTC infrastructure, within the 60m zone ofinfluence, the third party shall obtain TTC technical information, including TTC facilitylocation, structural, elec","cbCaiep6WIL29H1e","https://ap.wps.com/l/cbCaiep6WIL29H1e","pdf",1352697,37,"English","# DEVELOPER’S GUIDE\n# Table of Contents\n## 1.0 Purpose of a TTC Review\n## 2.0 Expediting TTC Reviews\n## 3.0 Planning Review\n## 3.1 Land Transfer/Exchange Agreement\n## 3.2 Construction Agreement\n## 3.3 Mutual Easement and Shared Facilities Agreement (MESFA)\n## 3.4 Mutual Easement and Shared Facilities Agreement (MESFA) for Entrance Connections\n## 4.0 Technical Review\n## 4.1 Technical Review Classification\n## 5.0 Cost Reimbursable Technical Reviews\n## 6.0 Costs Not Covered By Technical Review Fees\n## 7.0 Technical Review Submission Requirements\n## 7.1 Level 1 & 2 Reviews – Developments Within 60-Metres of TTC Structures or R-O-W\n## 7.2 Level 3 & 4 Reviews – Developments Founded Near TTC Structures or R-O-W\n## 7.3 Level 5 & 6 Reviews – Developments Overtop of or within 1 metre of a TTCStructure and/or Connecting to TTC Structure\n## 7.4 Property Protection Technical Review Submissions\n## 7.5 Entrance Connection Technical Review Submissions\n## 7.6 Technical Review Drawing & Report Submission Requirements\n## 8.0 TTC Contact for Review Process\n## Appendices\n## I Non-Disclosure Agreement\n## II Land Surveys and Associated Submittals\n## III Monitoring Plan – Review and Alert Levels and Action Protocol\n## IV Requirements for Condition Survey of TTC Structures\n## V Building Adjacent to TTC Substations – A Guideline\n## VI Submission Requirements for Developments Adjacent or Overtop of Planned or Future TTCStructures or Right of Way (R-O-W)","[{\"question\":\"What is the purpose of a TTC review for nearby development proposals?\",\"answer\":\"The TTC review ensures proposed developments do not adversely impact TTC’s current and future operations, or the integrity of TTC facilities, property, and structures.\"},{\"question\":\"How are TTC planning review and TTC technical review handled in the overall approval process?\",\"answer\":\"The guide states TTC planning review and TTC technical review are conducted alongside the municipal approval process, running concurrently with the City Planning \\u0026 Building permitting process.\"},{\"question\":\"What steps are required to start the TTC technical review process?\",\"answer\":\"The guide requires contacting the TTC Development Coordinator for preliminary information, submitting the Request for Review Level form with associated materials to initiate the technical review, and providing additional steps such as preliminary meetings for certain higher review levels.\"},{\"question\":\"How does a third party obtain TTC facility drawings needed for the review?\",\"answer\":\"A third party must execute a Non-Disclosure Agreement (NDA) with the TTC, then visit the TTC office to view and select archived contract library drawings; selected drawings are emailed after the visit, and release is subject to fees and TTC consent on reproduction or transmission.\"}]","DEVELOPER’S GUIDE - TTC Review Submission Requirements | PDF",93]