[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-131707-105":59,"doc-detail-131707-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","developer-we-complied-with-all-requirements","Developer: We complied with all requirements","","The developer of the government’s affordable housing project in Bandar Sri Permaisuri, Cheras, states that all required approvals were obtained and that regulatory obligations were met. The developer cites eight nearby schools, including ones within walking distance, and notes that construction of the 3,438-unit development began earlier this year. In response to questions raised during the project’s ground-breaking, the developer says education facilities, clinics, and other compliance items were reviewed with DBKL and relevant authorities.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/developer-we-complied-with-all-requirements/131707/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/developer-we-complied-with-all-requirements/131707.png","ImageObject",300,407,{"name":92,"@type":93},"Ava Thompson","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-09-27","2026-08-13",true,{"@type":102,"interactionType":103,"userInteractionCount":34},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What does the developer say about approvals for the housing project?","Question",{"text":112,"@type":113},"The developer says the project obtained approvals and complied with regulatory requirements.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How does the developer address the concern about the lack of schools?",{"text":117,"@type":113},"The developer says eight schools were identified nearby, with at least one within walking distance, and that options exist to expand or build additional facilities.",{"name":119,"@type":110,"acceptedAnswer":120},"What is the developer planning to do after the Prime Minister’s remarks?",{"text":121,"@type":113},"The developer is conducting a study and is expected to present proposals by Monday, including options for incorporating a school in or adjacent to the site.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},131707,1786663446,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":34,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81},1649267921044,"https://us-avatar.wpscdn.com/avatar/1800007509477c92dfb?_k=1786009248482753345","SEKTOR DOKUMENTASI PENDIDIKANBPPDP,Kementerian Pendidikan MalaysiaAras SB-4,Blok E8,Kompleks E,Pusat Pentadbiran Kerajaan Persekutuan62604 Putrajaya.Tel:03-88846425Faks:03-88846284                     \nTARIKH:07 OGOS 2025(KHAMIS)  \nSINAR HARIAN  \nUTUSAN M'SIA  \nN.STRAITS TIMES  \nTHE STAR  \nBERITA HARIAN  \n# Developer:We complied with all requirements\n\nNST 9/82s Pg:3  \nKUALA LUMPUR:The.developerof the government's affordablehousing project in BandarSri Per-maisuri,Cheras,said the devel-opment had obtained approvalsand complied with all regulatoryrequirements,including accessto public amenities such asschools.  \nDanau Lumayan said eightschools were identified in thesurrounding area,with at leastone located within walking dis-tance of the project site.  \n“Construction for the 3,438-unit development began earlierthis year following approvalgranted well before the introduc-tion of the Madani policy frame-work,\"said its managing director,Shahril Reza Shaheen.  \n\"The project started earlier thisyear.”  \nThis comes in response to re-marks by Prime Minister DatukSeri Anwar Ibrahim yesterdayduring the project's ground-breaking,in which he questionedthe absence of provisions for  \nschools in the development.  \nThe housing project,ResidensiWilayah Aman Lumayan,Shahriladded,adhered to all planningguidelines and requirements atthe time of approval,taking intoaccount the proximity of schoolsand pre-schools.  \n\"This is a project jointly devel-oped with DBKL(Kuala LumpurCity Hall).All compliance mat-ters,from education facilities toclinics,were reviewed and metbased on what was required.  \n\"If you're talking about theneed for more schools or class-rooms,there's always the optionto either expand or build a newschool.  \n\"In terms of all the guidelinesthat have been set by DBKL andother authorities,including pro-visions for a pre-school.  \n“And for a clinic requirement,there is a clinic located 50m fromthe site.  \n\"But whether we need anotherclinic in the housing area,that issomething we need to review.  \n\"We can sit down and explore(with DBKL and authorities),butwe have gone through all thechecklists,and we have compliedwith all requirements needed toproceed with this development.  \n\"There's no issue of an over-sight here,not at all.”  \nThe developer has since metDBKL officials to discuss the con-cerns raised by Anwar and is con-ducting a study to explorewhether a school could be incor-porated either in or adjacent tothe site.  \nThe company is expected topresent its proposals to Anwar byMonday,outlining options tomake improvements and meetthe community's future needs.  \nShahril added:\"We take theprime minister's concerns seri-ously and are studying the pos-sibility of building a school aspart of the development's nextphase.”  \nThe New Straits Times has alsoreached out to DBKL for com-ment and is awaiting a response.","cbCaiq6FvMFVxVvs","https://ap.wps.com/l/cbCaiq6FvMFVxVvs","pdf",225994,"English","# Developer response to PM’s concerns\n## Approvals and regulatory requirements\n## Availability of nearby schools\n## Construction timeline and policy context\n## DBKL review and compliance measures","[{\"question\":\"What does the developer say about approvals for the housing project?\",\"answer\":\"The developer says the project obtained approvals and complied with regulatory requirements.\"},{\"question\":\"How does the developer address the concern about the lack of schools?\",\"answer\":\"The developer says eight schools were identified nearby, with at least one within walking distance, and that options exist to expand or build additional facilities.\"},{\"question\":\"What is the developer planning to do after the Prime Minister’s remarks?\",\"answer\":\"The developer is conducting a study and is expected to present proposals by Monday, including options for incorporating a school in or adjacent to the site.\"}]","Developer: We complied with all requirements | PDF"]