[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-652805-105":59,"doc-detail-652805-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","design-technology-manual-rev-5-significant-changes","Design Technology Manual - Rev. 5 - Significant Changes","","Design Technology Manual Rev. 5 (April 2026) outlines significant updates to design roles, responsibilities, and document workflows. Revision changes consolidate edited ST AEC Tech roles versus design consultants, reorganize submittal milestones and deliverables, and migrate key sections—including ISO 19650 review process, CDE content, and document review workflow—into EP-18. The update clarifies requirements language, refines multi-tabbed DWG file requirements, and adds language for ST As-built and Record Drawing Execution Plan aligned with Appendix K and inline references.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/design-technology-manual-rev-5-significant-changes/652805/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/design-technology-manual-rev-5-significant-changes/652805.png","ImageObject",300,407,{"name":92,"@type":93},"cryingin4k","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":24},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the main purpose of Design Technology Manual Rev. 5 (April 2026)?","Question",{"text":112,"@type":113},"It documents significant changes to design technology processes, roles, deliverables, and review workflows, including updates aligned to EP-18 and ISO 19650 review steps.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Which content was moved or expanded into EP-18 in Rev. 5?",{"text":117,"@type":113},"Edits to roles and responsibilities, submittal milestones and deliverables, external and internal meeting references, ISO 19650 review process content, CDE text, and the document review workflow were moved or added to EP-18.",{"name":119,"@type":110,"acceptedAnswer":120},"How does Rev. 5 address As-built and Record Drawing Execution Plan requirements?",{"text":121,"@type":113},"It adds language for ST As-built and the Record Drawing Execution Plan, aligned with Appendix K and inline with referenced standards or document sections (including the stated 01 78 39.10 reference).","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},652805,1793096549,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":24,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145},137458181193,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","Document Information  \n\n| Attribute | Information |\n| --- | --- |\n| Document title | Design Technology Manual |\n| Document number | n/a |\n| Version number | 5 |\n| Executive sponsor | Laurel Klein |\n| Document owner | Justin Lopez |\n| Approval authority | Laurel Klein |\n| Supersedes | Revision 4 |\n| Superseded by | n/a |\n| Initial release | April 2026 |\n| Last update | September 2025 |\n| Review frequency | 2 years biennial |\n| Data classiﬁcation | Unrestricted |\n\nRevision History  \n\n| Version | Revision date | Description of changes |\n| --- | --- | --- |\n| 1 | 03-2016 | Issued for Revision 1 |\n| 2 | 05-2019 | Issued for Revision 2 |\n| 3 | 12-2022 | Issued for Revision 3 |\n| 4 | 09-2025 | Issued for Revision 4 |\n| 5 | 04-2026 | Issued for Revision 5 |\n\nSUMMARY OF SIGNIFICANT CHANGES  \nDesign Technology Manual Rev. 5 – April 2026  \n• Section 1.2 Rev 4 Roles and responsibilities portions were edited and copied to EP-18 . Expanded to identify ST AEC Tech roles vs design consultants  \n• R4 various sections on submittal milestones and deliverables moved to EP-18  \n• R4 Various external and internal meetings moved to EP-18  \n• R4 Section 7.5.2 ISO 19650 Review process move to EP-18  \n• Common Data Environment text was added to EP-18  \n• R4 Document Review Workflow was added to EP-18  \n• Deliverables outlined clearly and schedule added to EP-18  \n• Refined requirements language for improved clarity and conciseness  \n• Updated multi-tabbed dwg files requirements  \n• Added language for ST As-built and Record Drawing Execution Plan – Appendix K, inline with new 01 78 39.10  \n• Created As-Built and Record Drawing Execution Plan  \n\n| Design Technology Manual\u003Cbr>APPLICABILITY OF REVISION 5\u003Cbr>Supersedes Revision 4\u003Cbr>\"For projects that have not yet commenced Preliminary Engineering as of April 16, 2026”. |  |  |  |\n| --- | --- | --- | --- |\n| East Link Extension |  |  |  |\n| Contract No. | Title | DTM Revision\u003Cbr>No. | Design Status |\n| E130 | Seattle to South Bellevue | 0\u003Cbr>WSDOT | As Built |\n| E135 | Mercer Island Transit Interchange | 0 | Record |\n\n\n| East Link Bel-Red |  |  |  |\n| --- | --- | --- | --- |\n| Contract No. | Title | DTM Revision\u003Cbr>No. | Design Status |\n| E320 | I-90 to East Main Station (South Bellevue) | 0 | Record |\n| E330 | Downtown Bellevue Tunnel | 0 | Record |\n| E335 | East Main Station to 124th (DDBT to Spring) | 0 | Record |\n| E340 | 124th to NE 20th (Bel-Red) | 0 | Record |\n| E360 | NE 20th to Overlake Transit Center Station | 0 | Completed |\n\n\n| East Link Systems |  |  |  |  |\n| --- | --- | --- | --- | --- |\n| Contract No. | Title |  | DTM Revision\u003Cbr>No. | Design Status |\n| E750 | Systems | 0 |  | As Built |\n\n\n| Lynnwood Link Extension |  |  |  |\n| --- | --- | --- | --- |\n| Contract No. | Title | DTM Revision\u003Cbr>No. | Design Status |\n| L200 | Civil – Northgate to S200th | LLE DTM | Record |\n| L300 | Civil – S200th to Lynnwood | LLE DTM | Record |\n\n\n| Lynnwood Link Systems |  |  |  |\n| --- | --- | --- | --- |\n| Contract No. | Title | DTM Revision\u003Cbr>No. | Design Status |\n| L800 | Systems | LLE DTM | As Built |\n\n\n| Downtown Redmond Link Extension |  |  |  |\n| --- | --- | --- | --- |\n| Contract No. | Title | DTM Revision\u003Cbr>No. | Design Status |\n| R200 | Downtown Redmond Link Extension | 1-2 | As Built |\n\n\n| Federal Way Link Extension |  |  |  |\n| --- | --- | --- | --- |\n| Contract No. | Title | DTM Revision\u003Cbr>No. | Design Status |\n| F100 | Advanced Demolition | 2 | As Built |\n| F200 | Design Build Guideway and Station | 2 | As Built |\n| F210 | Traffic Mitigation | 2 | Construction |\n\n\n| West Seattle Link Extension |  |  |  |\n| --- | --- | --- | --- |\n| Contract No. | Title | DTM Revision No. | Design Status |\n| W100 | West Seattle to Downtown Seattle | 5 | Final Design |\n\n\n| Ballard Link Extension |  |  |  |\n| --- | --- | --- | --- |\n| Contract No. | Title | DTM Revision No. | Design Status |\n| BLE | Downtown Seattle to Ballard | 3 | Preliminary\u003Cbr>Engineering |\n| BLE | Downtown Seattle to Ballard | 5 | Final Des","cbCaiiSNrDgYmfoP","https://ap.wps.com/l/cbCaiiSNrDgYmfoP","pdf",8990088,327,"English","# Summary of Significant Changes\n## Design Technology Manual Rev. 5\n## Applicability of Revision 5\n## Project Applicability and Contracts (DTM Revision and Design Status)","[{\"question\":\"What is the main purpose of Design Technology Manual Rev. 5 (April 2026)?\",\"answer\":\"It documents significant changes to design technology processes, roles, deliverables, and review workflows, including updates aligned to EP-18 and ISO 19650 review steps.\"},{\"question\":\"Which content was moved or expanded into EP-18 in Rev. 5?\",\"answer\":\"Edits to roles and responsibilities, submittal milestones and deliverables, external and internal meeting references, ISO 19650 review process content, CDE text, and the document review workflow were moved or added to EP-18.\"},{\"question\":\"How does Rev. 5 address As-built and Record Drawing Execution Plan requirements?\",\"answer\":\"It adds language for ST As-built and the Record Drawing Execution Plan, aligned with Appendix K and inline with referenced standards or document sections (including the stated 01 78 39.10 reference).\"}]","Design Technology Manual - Rev. 5 - Significant Changes | PDF",1792882860,824]