[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-663670-105":59,"doc-detail-663670-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","design-standards-and-installation-requirements-for-contractors-water-distribution-division-record-of-revisions","Design Standards and Installation Requirements for Contractors - Water Distribution Division - Record of Revisions","","Design Standards and Installation Requirements for Contractors - Water Distribution Division provides structured guidance for water distribution system design and construction. It includes an official record of revisions with major change summaries tied to specific sections, plus a detailed table of contents covering general rules, main line extension and easement requirements, and procedures for granting easements. Additional topics outline engineering standards, application processes, permits, construction procedures, points of delivery, special conditions, and exceptions.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/design-standards-and-installation-requirements-for-contractors-water-distribution-division-record-of-revisions/663670/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/design-standards-and-installation-requirements-for-contractors-water-distribution-division-record-of-revisions/663670.png","ImageObject",300,407,{"name":92,"@type":93},"Ivy","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":24},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What does the record of revisions include in this document?","Question",{"text":112,"@type":113},"It lists revision dates and descriptions of major changes, each mapped to specific sections. The updates cover added design and review requirements for facilities and installation details.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Which main areas are covered for main line extension and easements?",{"text":117,"@type":113},"The table of contents lists requirements for inside and outside Los Angeles, engineering standards to apply, application procedure, engineering, plans and specifications, permits, construction procedure, points of delivery, special conditions, and exceptions.",{"name":119,"@type":110,"acceptedAnswer":120},"How are easements related to LADWP addressed?",{"text":121,"@type":113},"The document includes a dedicated section for easements and use of LADWP property, including general guidance and procedures for granting easements during subdivision recordation and in other cases.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},663670,1793230256,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":24,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144},549758252649,"https://ap-avatar.wpscdn.com/avatar/8000253669c5317157?_k=1778319167496531819","DESIGN STANDARDS AND INSTALLATION REQUIREMENTS FOR CONTRACTORS  \nWATER DISTRIBUTION DIVISION  \n6/23/2025  \nRECORD OF REVISIONS  \n\n| Revision Date | Description of Major Change | Section |\n| --- | --- | --- |\n| July 2025 | Added review requirements for pump stations, regulator stations, tanks, and other facilities that are not covered by these standards but shall be submitted for review and approval by other Water System personnel. | Section 301.4-Pressure\u003Cbr>Regulating Stations |\n|  | Added requirement not to allow gate valves to be placedon bus pads, cross gutters, and other concrete structures. | 302.2F-Layout of the Distribution System – Line Valves |\n|  | Added requirement for design in accordance with the latest edition of LADWP's Cathodic Protection Standards. | 302.7-B.1 – Corrosion Mitigation – Cathodic Protection |\n|  | Added requirement that the service owner must clearly assign a location for the meter on the public right-of-way during the conceptual design review. If the meter service location is not on public right-of-way, an easement agreement with LADWP must be provided by the property owner. | 303.2-B – Ownership and MaintenanceMaintenance |\n|  | Added requirements for Trunk Line Design Standards and Cathodic Protection Standards. | 305.2-Other Standards to Apply |\n|  | Added additional requirements for mechanical joints and push-on joints. | 401.18-Installation of Fittings |\n\nTABLE OF CONTENTS  \nDESIGN STANDARDS AND INSTALLATION REQUIREMENTS FOR CONTRACTORS ........ 1  \nRECORD OF REVISIONS .............................................................................................................................................3  \nTABLE OF CONTENTS .......................................................................................................................................... 4  \nSTANDARD DRAWINGS INDEX............................................................................................................................ 9  \n -GENERAL ....................................................................................................................................... 11  \nSECTION 101-GENERAL ............................................................................................................................................... 12  \n Authority ................................................................................................................................................ 12  \n Effective Date of Standards ................................................................................................................... 12  \n Revisions, Amendments or Additions ..................................................................................................... 12  \n Organization and Interpretation of Standards ...................................................................................... 12  \n Definitions .............................................................................................................................................. 12  \n Abbreviations ......................................................................................................................................... 14  \n -MAIN LINE EXTENSION & EASEMENT REQUIREMENTS ................................................................... 16  \nSECTION 201-MAIN LINE EXTENSION & EASEMENT REQUIREMENTS .................................................................................... 17  \n Inside Los Angeles .................................................................................................................................. 17  \n Outside Los Angeles ............................................................................................................................... 17  \n Engineering Standards to Apply............................................................................................................. 17  \n Application Procedure ...................................","cbCaivHSTWaO4M47","https://ap.wps.com/l/cbCaivHSTWaO4M47","pdf",8690501,232,"English","# RECORD OF REVISIONS\n# TABLE OF CONTENTS\n# STANDARD DRAWINGS INDEX\n# SECTION 101 - GENERAL\n## Authority\n## Effective Date of Standards\n## Revisions, Amendments or Additions\n## Organization and Interpretation of Standards\n## Definitions\n## Abbreviations\n# SECTION 201 - MAIN LINE EXTENSION & EASEMENT REQUIREMENTS\n## Inside Los Angeles\n## Outside Los Angeles\n## Engineering Standards to Apply\n## Application Procedure\n## Engineering\n## Plans and Specifications\n## Permits\n## Construction Procedure\n## Points of Delivery\n## Special Conditions\n## Exceptions\n# SECTION 202 - EASEMENTS AND USE OF LADWP PROPERTY\n## General\n## Procedure for Granting Easements to LADWP During Recordation of Subdivision\n## Procedure for Granting Easements to LADWP Not in Connection with Recordation of Subdivision","[{\"question\":\"What does the record of revisions include in this document?\",\"answer\":\"It lists revision dates and descriptions of major changes, each mapped to specific sections. The updates cover added design and review requirements for facilities and installation details.\"},{\"question\":\"Which main areas are covered for main line extension and easements?\",\"answer\":\"The table of contents lists requirements for inside and outside Los Angeles, engineering standards to apply, application procedure, engineering, plans and specifications, permits, construction procedure, points of delivery, special conditions, and exceptions.\"},{\"question\":\"How are easements related to LADWP addressed?\",\"answer\":\"The document includes a dedicated section for easements and use of LADWP property, including general guidance and procedures for granting easements during subdivision recordation and in other cases.\"}]","Design Standards and Installation Requirements for Contractors - Water Distribution Division - Record of Revisions | PDF",585]