[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-detail-663343-en":59,"doc-seo-663343-105":81},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":5,"data":60},{"doc_id":61,"user_id":62,"nickname":63,"user_avatar":64,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":66,"doc_content":67,"file_id":68,"file_url":69,"file_type":70,"file_size":71,"view_count":24,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":72,"language":73,"language_code":74,"site_id":75,"html_lang":74,"table_of_contents":76,"faqs":77,"seo_title":78,"seo_description":66,"update_tm":79,"read_time":80},663343,962084926284,"Aria Callaghan","https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","Design Engineering Guide - Document Identifier 331-87 - Revision 11","Design Engineering Guide with document identifier 331-87 and revision 11, focused on nuclear engineering design engineering activities. Provides an introduction and supporting clauses covering scope, purpose, applicability, effective date, references, definitions, abbreviations, and roles and responsibilities. Describes the design process, including kick-off, contracting, detailed design execution, design package approval, and management of design documents. Includes guidance on multi-disciplinary designs, attachments, electronic storage, controlled copies, safety evaluations, temporary alteration forms (TAFs), specifications, and factory acceptance tests (FATs).","| | Guideline | Nuclear Engineering |\n| --- | --- | --- |\n\nTitle: Design Engineering Guide Document Identifier: 331-87  \nAlternative Reference KGU-017  \nNumber:  \nArea of Applicability: Nuclear Engineering  \nFunctional Area: Design Engineering  \nRevision: 11  \nTotal Pages: 48  \nNext Review Date: September 2024  \nDisclosure Controlled Disclosure  \nClassification:  \n\n| Compiled by\u003Cbr>|  | Functional Responsibility\u003Cbr>|  | Authorized by\u003Cbr>\u003Cbr>R Goldstein\u003Cbr>Design Engineering Manager\u003Cbr>Date: 2021-09-21 |\n| --- | --- | --- | --- | --- |\n| R Maapola Engineer\u003Cbr>Date: 2021-09-15 |  | N Mtoko\u003Cbr>NTP Manager\u003Cbr>Date: 2021-09-15 |  |  |\n|  |  |  |  |  |\n\nDesign Engineering Guide Unique Identifier: 331-87  \nRevision: 11  \nPage: 2 of 44  \nNuclear Additional Classification Information  \nBusiness Level: 3  \nWorking Document: 3  \nImportance Classification: NSA  \nNNR Approval: No  \nSafety Committee Approval: No  \nALARA Review: No  \nFunctional Control Area: Design Engineering  \nCONTROLLED DISCLOSURE  \nWhen downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30  \nDesign Engineering Guide Unique Identifier: 331-87  \nRevision: 11  \nPage: 3 of 44  \nContent  \nPage  \n1. Introduction ............................................................................................................................... 5  \n2. Supporting Clauses .................................................................................................................. 5  \n2.1 Scope ............................................................................................................................... 5  \n2.1.1 Purpose ................................................................................................................. 5  \n2.1.2 Applicability ........................................................................................................... 5  \n2.1.3 Effective date ......................................................................................................... 5  \n2.2 Normative/Informative References ................................................................................... 5  \n2.2.1 Normative .............................................................................................................. 5  \n2.2.2 Informative............................................................................................................. 6  \n2.3 Definitions ........................................................................................................................ 9  \n2.4 Abbreviations ................................................................................................................. 10  \n2.5 Roles and Responsibilities ............................................................................................. 11  \n2.5.1 General ............................................................................................................... 11  \n2.5.2 The Design Package Compiler .......................................................................... 12  \n2.5.3 The Design Package Co-compiler ..................................................................... 12  \n2.5.4 The Design Package Reviewer ......................................................................... 12  \n2.5.5 Concurrence Review Process ........................................................................... 13  \n2.5.6 Post Implementation Design Review Meeting .................................................. 14  \n2.6 Process for Monitoring.................................................................................................... 14  \n2.7 Related/Supporting Documents ................................","cbCaiiUt4dZ2QRaA","https://ap.wps.com/l/cbCaiiUt4dZ2QRaA","pdf",897934,47,"English","en",105,"# Introduction\n# Supporting Clauses\n## Scope\n## Normative/Informative References\n## Definitions\n## Abbreviations\n## Roles and Responsibilities\n## Process for Monitoring\n## Related/Supporting Documents\n# The Design Process\n## Description\n## The Design Document\n## Multi-disciplinary Designs\n## Attachments\n## Electronic Storage of Design Files\n## Controlled Copies\n## Safety Evaluations\n## Temporary Alteration Forms (TAFs)\n## Specifications\n## Factory Acceptance Tests (FATs)","[{\"question\":\"What is the document identifier and revision for this guide?\",\"answer\":\"The guide lists “Design Engineering Guide Unique Identifier: 331-87” and “Revision: 11.”\"},{\"question\":\"What areas does the guide cover under supporting clauses?\",\"answer\":\"It covers scope (purpose, applicability, effective date), references (normative and informative), definitions, abbreviations, roles and responsibilities, monitoring processes, and related/supporting documents.\"},{\"question\":\"How does the guide describe the design process for nuclear engineering?\",\"answer\":\"It outlines steps including kick-off meeting, contracting for work scope, detailed design execution, and design package approval, along with handling of design documents, multi-disciplinary designs, attachments, electronic storage, controlled copies, safety evaluations, TAFs, specifications, and FATs.\"}]","Design Engineering Guide - Document Identifier 331-87 - Revision 11 | PDF",1793226876,118,{"code":4,"msg":82,"data":83},"ok",{"site_id":75,"language":74,"slug":84,"title":65,"keywords":85,"description":66,"schema_data":86,"social_meta":140,"head_meta":142,"extra_data":144,"updated_unix":79},"design-engineering-guide-document-identifier-331-87-revision-11","",{"@graph":87,"@context":139},[88,102,122],{"@type":89,"itemListElement":90},"BreadcrumbList",[91,95,97,100],{"item":92,"name":93,"@type":94,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":96,"name":9,"@type":94,"position":14},"https://docshare.wps.com/document/",{"item":98,"name":40,"@type":94,"position":99},"https://docshare.wps.com/document/research-report/",3,{"item":101,"name":65,"@type":94,"position":19},"https://docshare.wps.com/document/design-engineering-guide-document-identifier-331-87-revision-11/663343/",{"url":101,"name":65,"@type":103,"image":104,"author":109,"headline":65,"publisher":111,"fileFormat":114,"inLanguage":74,"description":66,"dateModified":115,"datePublished":116,"encodingFormat":114,"isAccessibleForFree":117,"interactionStatistic":118},"DigitalDocument",{"url":105,"@type":106,"width":107,"height":108},"https://docshare.wps.com/thumbnails/design-engineering-guide-document-identifier-331-87-revision-11/663343.png","ImageObject",300,407,{"name":63,"@type":110},"Person",{"url":92,"name":112,"@type":113},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":119,"interactionType":120,"userInteractionCount":24},"InteractionCounter",{"@type":121},"ViewAction",{"@type":123,"mainEntity":124},"FAQPage",[125,131,135],{"name":126,"@type":127,"acceptedAnswer":128},"What is the document identifier and revision for this guide?","Question",{"text":129,"@type":130},"The guide lists “Design Engineering Guide Unique Identifier: 331-87” and “Revision: 11.”","Answer",{"name":132,"@type":127,"acceptedAnswer":133},"What areas does the guide cover under supporting clauses?",{"text":134,"@type":130},"It covers scope (purpose, applicability, effective date), references (normative and informative), definitions, abbreviations, roles and responsibilities, monitoring processes, and related/supporting documents.",{"name":136,"@type":127,"acceptedAnswer":137},"How does the guide describe the design process for nuclear engineering?",{"text":138,"@type":130},"It outlines steps including kick-off meeting, contracting for work scope, detailed design execution, and design package approval, along with handling of design documents, multi-disciplinary designs, attachments, electronic storage, controlled copies, safety evaluations, TAFs, specifications, and FATs.","https://schema.org",{"og:url":101,"og:type":141,"og:title":65,"og:site_name":112,"og:description":66},"article",{"robots":143,"canonical":101},"index,follow",{"doc_id":61,"site_id":75}]