[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-296167-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-296167-en":131},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","design-criteria-and-engineering-standards-revision-june-2025","Design Criteria and Engineering Standards - Revision June 2025","","Design Criteria and Engineering Standards document detailing major revisions effective June 2025. It enumerates updates to general, drawing, first and second submission requirements, site alterations, underground servicing approval, and chapter renumbering affecting submissions and approvals for municipal projects. Revisions also cover approved materials, erosion and sediment control, record drawings, development with private services, lot grading, watershed planning and storm water management controls, pipe capacity and maintenance holes, and multiple engineering standards tables. Major updates are listed for standard drawings including traffic, stormwater, and roadway elements.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/design-criteria-and-engineering-standards-revision-june-2025/296167/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/design-criteria-and-engineering-standards-revision-june-2025/296167.png","ImageObject",300,407,{"name":42,"@type":43},"Rhys","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-09-18",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",13,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What revision timeframe is stated in the document?","Question",{"text":63,"@type":64},"The document states the revision is June 2025.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What types of areas are covered by the major revisions on design criteria?",{"text":68,"@type":64},"It covers requirements such as general and drawing requirements, first and second submissions, site alterations, underground servicing approval, submissions and approvals for municipal projects, and several stormwater and lot grading-related sections.",{"name":70,"@type":61,"acceptedAnswer":71},"Does the document include updates to standard drawings?",{"text":72,"@type":64},"Yes. It lists major revisions and new standards for Town of Whitby standard drawings, including elements like stop bar locations, multi-use paths, speed humps, driveways, roadway ROW notes, trench restoration details, and accessibility/EV-related details.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},296167,1789728969,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,106,111,115,120,123,127],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},6,"Technology",50,"technology",{"id":107,"doc_module":4,"doc_module_name":25,"category_name":108,"show_sort_weight":109,"slug":110},7,"Healthcare",40,"healthcare",{"id":112,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":113,"slug":114},8,30,"research-report",{"id":116,"doc_module":4,"doc_module_name":25,"category_name":117,"show_sort_weight":118,"slug":119},9,"Religion & Spirituality",20,"religion-spirituality",{"id":118,"doc_module":4,"doc_module_name":25,"category_name":121,"show_sort_weight":118,"slug":122},"World Cup","world-cup",{"id":124,"doc_module":4,"doc_module_name":25,"category_name":125,"show_sort_weight":124,"slug":126},10,"Lifestyle","lifestyle",{"id":128,"doc_module":4,"doc_module_name":25,"category_name":129,"show_sort_weight":97,"slug":130},19,"General","general",{"code":4,"msg":82,"data":132},{"doc_id":79,"user_id":133,"nickname":42,"user_avatar":134,"doc_module":4,"category_id":112,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":140,"language":141,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":142,"faqs":143,"seo_title":144,"seo_description":12,"update_tm":80,"read_time":145,"preview_page_count":4},687207024643,"https://ap-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","| | | |\n| --- | --- | --- |\n| Design Criteria and Engineering Standards |  |  |\n| |  |  |\n\nRevision June 2025  \n\n| Approved By | Signature |\n| --- | --- |\n| Peter Angelo, P.Eng.\u003Cbr>Director, Engineering | |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n\n\n|  |\n| --- |\n| Design Criteria |\n|  |\n\nMajor Revisions on Design Criteria:  \n1. A2 .01 General requirements have been revised.  \n2. A2 .02 Drawing requirements have been revised.  \n3. A3 .02 First Submission requirements have been revised.  \n4. A3 .03 Second Submission requirements have been revised.  \n5. A3.06 Site Alteration has been added.  \n6. A3.07 Underground Servicing Approval has been added  \n7. A4.02 Drawing Requirements-note “e” has been removed.  \n8. A5 .00 Submissions and Approvals – Municipal Projects-chapter number has been revised to A4 .03 Submissions and Approvals. Rest of the chapter numbers have been updated.  \n9. A5 .06 Approved Materials has been revised.  \n10. A5.07 Erosion and Sediment Control Plan has been revised.  \n11. A6.00 Record Drawings, the first paragraph has been revised, note a has been revised.  \n12. A7 .00 Development with Private Services, chapter title has been revised.  \n13. A7 .04 Lot Grading has been revised.  \n14. B2 .00 Watershed Planning/Storm Water Management has been revised.  \n15. B2 .01 Lot Level Controls, note “c”, “e” and “f” has been revised.  \n16. B2 .02 Conveyance Controls, note “d” and “e” has been revised.  \n17. B2.03 End-Pipe Strom Water Management Facilities, note “c” and “d” has been revised.  \n18. B2 .04 Storm Water Quality Treatment Facility Requirements, note “a”, “r” and “s”has been revised.  \n19. B2 .06 Non-conventional Stormwater Management Facilities has been added.  \n20. B2.07 Industrial, Commercial and Institutional (ICI) Developments has been added.  \n21. B3.04 Pipe Capacity, note “e” has been revised.  \n22. B3.09 Maintenance Holes, note “d”, “I” and “s” has been revised.  \n23. B13 .1 General, note “e” has been revised.  \n24. Table C3 .01 pavement width has been revised to include local road.  \n25. Table C3 .01 General, boulevard width and bike lane requirements and note “12”has been revised.  \n26. C3 .01.1 Minimum Visibility Triangle requirements have been revised.  \n27. C5 .02 Locations of Community Mail Boxes requirements have been revised.  \n28. C6 .01.1 Residential Driveways, note “c” has been revised.  \n29. C6 .03.1 Curb Standard – New Developments, note “d” has been revised.  \n30. C7 .00 Traffic Calming, speed humps detail has been referenced.  \n31. C10 .05 Detailed Design and Submission Requirements, note “c” has been revised.  \n32. C11 Public Laneways, note “a”, “b” and “e” has been revised.  \n33. D2 .01 Lot Grading Design, note “c” has been revised.  \n34. D5 .00 Lot Grading Requirements for Infill Development has been revised.  \n35. D5 .03 Lot Grading Criteria for Infill Housing, notes have been revised.  \n36. D5 .04 Lot Grading and Stormwater Management Criteria for Infill Housing, note“l” and “m” has been revised.  \n37. D7 .00 Foundation Control and Lot Grading Certification has been revised.  \n38. F5 .00 Fencing, note “c” has been removed.  \n39. G1 .00 General, second paragraph has been removed.  \n40. The whole Chapter “J” has been renumbered to “I”  \n41. J3 .03.1 (renumbered to I3 .03. 1) Internal Works has been revised.  \n42. J3 .04 (renumbered to I3 .04) Building Section Requirements has been removed.  \n43. J4 .05 (renumbered to I4 .05) Urban Standard for Private Internal Street, subsection Road Width has been revised from 6.5m to 6m (face of curb to face of  \ncurb)  \n44. J4 .05 (renumbered to I4 .05) Urban Standard for Private Internal Street, subsection Cul-De-Sac, third point –“or a cul-de-sac” has been removed.  \n45. J4 .08 (renumbered to I4 .08) Groundwater Pumping, Drawdown and Foundation Drainage, a new chapter has been added.  \n46. Appendix A Digital Information Submission requirements have been revised.  \n47. Appendix B Engineering Drawings requirements have been revised.  \n48. Appendix F New append","cbCaitzLgEKKwoJU","https://ap.wps.com/l/cbCaitzLgEKKwoJU","pdf",13519738,317,"English","# Major Revisions on Design Criteria\n## Major Revisions on Standard Drawings\n### Town of Whitby Standard Drawing Updates","[{\"question\":\"What revision timeframe is stated in the document?\",\"answer\":\"The document states the revision is June 2025.\"},{\"question\":\"What types of areas are covered by the major revisions on design criteria?\",\"answer\":\"It covers requirements such as general and drawing requirements, first and second submissions, site alterations, underground servicing approval, submissions and approvals for municipal projects, and several stormwater and lot grading-related sections.\"},{\"question\":\"Does the document include updates to standard drawings?\",\"answer\":\"Yes. It lists major revisions and new standards for Town of Whitby standard drawings, including elements like stop bar locations, multi-use paths, speed humps, driveways, roadway ROW notes, trench restoration details, and accessibility/EV-related details.\"}]","Design Criteria and Engineering Standards - Revision June 2025 | PDF",799]