[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-648414-105":59,"doc-detail-648414-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","design-coordination-checklist-plumbing","DESIGN COORDINATION CHECKLIST - Plumbing","","Design coordination checklist for plumbing scope, structured as a “No./Aspect Reviewed” verification table covering fixture locations, fire department connections, roof drains, and underground and foundation drainage. It includes clash and interference tracing across architectural, structural and mechanical systems (including BIM/REVIT), beam and riser penetration placement, and alignment of plumbing utility plans with civil drawings. Also verifies required clearances, electrical coordination, site sump pumps, piping for cooling towers and floor sinks, plus kitchen hood protection and grease trap provision.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/design-coordination-checklist-plumbing/648414/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/design-coordination-checklist-plumbing/648414.png","ImageObject",300,407,{"name":92,"@type":93},"Jiven","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-04","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What plumbing items does the checklist verify first?","Question",{"text":112,"@type":113},"It checks whether plumbing fixture locations match architectural drawings (including BIM/REVIT) and whether fire department connection locations match architectural requirements.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How does the checklist handle coordination and clashes?",{"text":117,"@type":113},"It requires tracing large plumbing lines to determine interferences with architectural, structural, and mechanical systems, explicitly including BIM/REVIT coordination.",{"name":119,"@type":110,"acceptedAnswer":120},"What site drainage and equipment coordination items are included?",{"text":121,"@type":113},"It verifies foundation/under-slab drainage against civil and geotechnical reports, locates floor drains/sinks and sump pits relative to footings, and confirms the site sump pump location matches civil drawings.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},648414,1792793408,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":14,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":24},1099513958607,"https://ap-avatar.wpscdn.com/avatar/100002390cf8733938c?x-image-process=image/resize,m_fixed,w_180,h_180&k=1778829742770036399","# DESIGN COORDINATION CHECKLIST\n\n\n| Project Name:   |  | Project No :   |\n| --- | --- | --- |\n| Drawing title,  \u003Cbr>with number  \u003Cbr>and revision   |  | Originator :  \u003Cbr>Checker  \u003Cbr>:  \u003Cbr>Reviewer   |\n\n\n| No.   | Aspect Reviewed   | Coordinated  \u003Cbr>Yes No N/A   |  |  | Remarks   |\n| --- | --- | --- | --- | --- | --- |\n| 1   | Plumbing fixture locations match architectural  \u003Cbr>(including BIM/REVIT)   |  |  |  |  |\n| 2   | Location and type of fire department  \u003Cbr>connection matches architectural   |  |  |  |  |\n| 3   | Roof drain locations match architectural   |  |  |  |  |\n| 4   | Plumbing utility plan locations and elevations  \u003Cbr>match civil   |  |  |  |  |\n| 5   | Trace large plumbing lines to determine  \u003Cbr>interferences with architectural,structural and  \u003Cbr>mechanical(including BIM/REVIT)   |  |  |  |  |\n| 6   | Required beam penetrations arelocated in  \u003Cbr>plan and elevation on structural   |  |  |  |  |\n| 7   | Verify plumbing riser locationsin relation to  \u003Cbr>floor beams   |  |  |  |  |\n| 8   | Verify plumbing riser locationsin relation to  \u003Cbr>floor beams   |  |  |  |  |\n| 9   | Foundation/under slab drainage matches civil  \u003Cbr>and geotechnical report   |  |  |  |  |\n| 10   | Locate floor drains,floor sinks and sump pits in  \u003Cbr>relation to footings   |  |  |  |  |\n| 11   | Location of site sump pumps matches civil   |  |  |  |  |\n| 12   | Piping should avoid electrical rooms and  \u003Cbr>elevator machine rooms   |  |  |  |  |\n| 13   | Sufficient clear spaces provided at plumbing  \u003Cbr>chases for pipes and carriers   |  |  |  |  |\n| 14   | Plumbing electrical requirements match  \u003Cbr>electrical   |  |  |  |  |\n| 15   | Architectural plumbing chases are provided for  \u003Cbr>plumbing risers   |  |  |  |  |\n| 16   | Fire hose cabinet locations match architectural   |  |  |  |  |\n| 17   | Floor sinks provided for mechanical equipment   |  |  |  |  |\n| 18   | Provide make-up water line with backflow  \u003Cbr>device for cooling towers   |  |  |  |  |\n\ninfo@united-bim.com  \n+1(860)317-7105  \n1 of 2  \nDate:  /   /  \nPLUMBING  \nfDin回口  \nVer_Feb252020  \nCredlit:BuildLACCD  \nDESIGN COORDINATION CHECKLIST  \n\n| Project Name:   |  | Project No :   |\n| --- | --- | --- |\n| Drawing title,  \u003Cbr>with number  \u003Cbr>and revision   |  | Originator :  \u003Cbr>Checker  \u003Cbr>:  \u003Cbr>Reviewer   |\n\n\n| No.   | Aspect Reviewed   | Coordinated  \u003Cbr>Yes No N/A   |  |  | Remarks   |\n| --- | --- | --- | --- | --- | --- |\n| 19   | Provide floor sink at each cooling coil bank   |  |  |  |  |\n| 20   | Coordinate location of above ground site  \u003Cbr>valves and backflow preventers with civil and  \u003Cbr>landscaping(including BIM/REVIT)   |  |  |  |  |\n| 21   | Heating hot water systems willprovide hot  \u003Cbr>water within a reasonable time   |  |  |  |  |\n| 22   | Plumbing flow switch/tamper switch locations  \u003Cbr>match electrical plans and fire/life safety riser   |  |  |  |  |\n| 23   | Exterior horizontal mechanicalopeningsin  \u003Cbr>slabs and roofs have drain and storm drain  \u003Cbr>piping   |  |  |  |  |\n| 24   | Emergencygenerator muffler and exhaust  \u003Cbr>piping is shown   |  |  |  |  |\n| 25   | Storage tanks coordinated with structural   |  |  |  |  |\n| 26   | Fire protection tank coordinated with  \u003Cbr>structural   |  |  |  |  |\n| 27   | Verify underground fuel tanks are double  \u003Cbr>walled with a leak detection system   |  |  |  |  |\n| 28   | Irrigation point of connection matches  \u003Cbr>landscape drawings   |  |  |  |  |\n| 29   | Provide trap primers for floor drains and floor  \u003Cbr>sinks   |  |  |  |  |\n| 30   | Provide plumbing connections as shown on the  \u003Cbr>kitchen drawings   |  |  |  |  |\n| 31   | Provide fire protection for kitchen hoods   |  |  |  |  |\n| 32   | Provide grease trap for kitchen equipment   |  |  |  |  |\n\ninfo@united-bim.com +1(860)317-7105  \nDate:  /   /  \nPLUMBING  \nfOin回贝口  \nVer_Feb252020  \nCredlit:BuildLACCD","cbCaidRdhUg0pivg","https://ap.wps.com/l/cbCaidRdhUg0pivg","pdf",200237,"English","# Plumbing Design Coordination Checklist\n## Reviewed Plumbing Aspects","[{\"question\":\"What plumbing items does the checklist verify first?\",\"answer\":\"It checks whether plumbing fixture locations match architectural drawings (including BIM/REVIT) and whether fire department connection locations match architectural requirements.\"},{\"question\":\"How does the checklist handle coordination and clashes?\",\"answer\":\"It requires tracing large plumbing lines to determine interferences with architectural, structural, and mechanical systems, explicitly including BIM/REVIT coordination.\"},{\"question\":\"What site drainage and equipment coordination items are included?\",\"answer\":\"It verifies foundation/under-slab drainage against civil and geotechnical reports, locates floor drains/sinks and sump pits relative to footings, and confirms the site sump pump location matches civil drawings.\"}]","DESIGN COORDINATION CHECKLIST - Plumbing | PDF"]