[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-648053-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-648053-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","design-and-supervision-consultancy-for-rehabilitation-works-at-al-beiruni-secondary-boys-school-in-al-ram-apr-2025-main-drawings","DESIGN AND SUPERVISION CONSULTANCY FOR REHABILITATION WORKS AT AL-BEIRUNI SECONDARY BOYS SCHOOL IN AL-RAM - Apr 2025 - MAIN DRAWINGS","","Architectural design drawings and supervision consultancy material for rehabilitation works at Al-Beiruni Secondary Boys School in Al-Ram, funded by the Ministry of Education (MOE) with Enabel support. The set includes a main drawings section and a detailed list of architectural sheets such as existing and proposed ground floor plans, preparing works, proposed ceiling plans, and 3D shots for the main hall. The document provides drawing metadata like sheet numbers, dates, preparation and scale notes, and drafting legends with constraints on dimension scaling.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/design-and-supervision-consultancy-for-rehabilitation-works-at-al-beiruni-secondary-boys-school-in-al-ram-apr-2025-main-drawings/648053/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/design-and-supervision-consultancy-for-rehabilitation-works-at-al-beiruni-secondary-boys-school-in-al-ram-apr-2025-main-drawings/648053.png","ImageObject",300,407,{"name":42,"@type":43},"Miles","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-23",true,{"@type":52,"interactionType":53,"userInteractionCount":30},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What is the document’s purpose?","Question",{"text":62,"@type":63},"It presents the main architectural design drawings and the list of drawing sheets for the rehabilitation consultancy project for Al-Beiruni Secondary Boys School in Al-Ram.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"Who funds the project?",{"text":67,"@type":63},"The document states funding from the Ministry of Education (MOE) with Enabel.",{"name":69,"@type":60,"acceptedAnswer":70},"What kinds of drawings are included?",{"text":71,"@type":63},"It includes items such as existing ground floor plan(s), preparing work at the ground floor, proposed ground floor plan, proposed ground ceiling plan, and 3D shots of the main hall, each with corresponding sheet numbers and scales.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},648053,1792791902,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":30,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":79,"read_time":144},13056703019404,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","# *MAIN DRAWINGS*\n\n*DESIGN AND SUPERVISION CONSULTANCY FORREHABILITATION WORKS AT AL-BEIRUNI SECONDARY BOYSSCHOOL IN AL-RAM*  \nFunded by:  \nMINISTRY OF EDUCATION  \nMOE  \nEnabel  \nTet:(+972-2)2961565  \nFax:(+972-2)2961566  \nE-mail:diyar@diyar-consultants.com P.O.BOX 1065,Ramallah,Palestine  \n*APR,2025*  \nLUll1e     -山p  \n\n| Notes  \u003Cbr>oeueSos ARE IN CLUMLESs MoTED  \u003Cbr>-DIMENSIONS SHOULD NOT BE SCALED OUT  \u003Cbr>o  eLs AE NM UMLESS MoTED   |  |  |  |\n| --- | --- | --- | --- |\n| Legend:  \u003Cbr>SECTION NLMBER  \u003Cbr>REFERENCE SHEET NLMBER  \u003Cbr>ELNULSETNUMBER  \u003Cbr>FLOOR FNISH LEVEL  \u003Cbr>FLOOR CONCRETE LEVEL  \u003Cbr>LEVEL SGN NPLAN  \u003Cbr>WNDOW NLMBER  \u003Cbr>REFERENCE SHEETNLMBER  \u003Cbr>DOOR NUMBER  \u003Cbr>REFERENCE SHET NLMBER  \u003Cbr>RCCONCRETEFOR COL  \u003Cbr>CONCRETE  \u003Cbr>STONE WALL  \u003Cbr>HDLLOW BLOCKS  \u003Cbr>INSLLATION RANDOPAN3CMTHCK   |  |  |  |\n|  |  |  |  |\n| REV.   | DATE   | DESCHIPTION   |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n| MINISTRY OF EDUCATION  \u003Cbr>MOE   |  |  |  |\n| Funded by:  \u003Cbr>Enabel'   |  |  |  |\n| Arditectural &Engineering Firm:  \u003Cbr>nc  \u003Cbr>m75om PaBox 1e5-2  \u003Cbr>e-   |  |  |  |\n| DESIGN DRAWINGS   |  |  |  |\n| Project Name  \u003Cbr>DESIGN AND SUPERVISION  \u003Cbr>CONSULTANCY FOR  \u003Cbr>REHABILITATION WORKS AT  \u003Cbr>AL-BEIRUNI SECONDARY BOYS  \u003Cbr>SCHOOL IN AL-RAM   |  |  |  |\n| Draving Tide  \u003Cbr>LIST OF DRAWINGS   |  |  |  |\n| Prepared by   |  Diyar Consultans Co.   |  | Scale   |\n| Date   | Apr,2025   |  | SheetNo.  \u003Cbr>G-001   |\n\n# LIST OF DRAWINGS\n\n\n| ARCHITECTURAL DRAWINGS   |  |  |  |\n| --- | --- | --- | --- |\n| G-000   | COVER PAGE   |  |  |\n| G-001   | LIST OF DRAWINGS   |  |  |\n| A-101   | EXISTING GROUND FLOOR PLAN(SCALE 1-100)   |  |  |\n| A-102   | PREPARING WORK AT GROUND FLOOR(SCALE 1-100)   |  |  |\n| A-103   | PROPOSED GROUND FLOOR PLAN(SCALE 1-100)   |  |  |\n| A-104   | PROPOSED GROUND CEILING PLAN (SCALE 1-100)   |  |  |\n| A-105   | 3D SHOTS(MAIN HALL)   |  |  |\n| A-106   | 3D SHOTS(MAIN HALL)   |  |  |\n| A-107   | 3D SHOTS(MAIN HALL)   |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n\n\n| Notes:  \u003Cbr>оЛЕкМЫЕМЗЮМз а«є мсмимцезз мотео  \u003Cbr>-DMENSIONS SHOULD NOT BE SCALED OUT  \u003Cbr>оЛЕКЮУЕЕб аюе мм имшевб мотео   |  |  |  |\n| --- | --- | --- | --- |\n| Legend  \u003Cbr>5ЕСТЮОМ МИМВЕН  \u003Cbr>rEC SHFETNIMBEF  \u003Cbr>Србтнммвёетпимзея  \u003Cbr>нтоовпмбниеуе-  \u003Cbr>FLOOR CONCRETE LEVEL  \u003Cbr>LEVEL SMGNINPLAN  \u003Cbr>нРРМММЕЁТммвея  \u003Cbr>деЭЯМСМВНЕетмимвея  \u003Cbr>яс сомсаете гон сои  \u003Cbr>货827 CONCRETE  \u003Cbr>sтоме иан  \u003Cbr> ношом виоскб  \u003Cbr>nsиатом вамрорам зсмтнск   |  |  |  |\n| моктн  \u003Cbr>匪   |  |  |  |\n| неу.   | рАТЕ   | oesснтрттом   |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n| mm«тву ог ерисатпом  \u003Cbr>мое   |  |  |  |\n| Гипаеа Ъуг  \u003Cbr>Enabel  \u003Cbr>y   |  |  |  |\n| Агсмесшга а Еппеегпе Нгтпс  \u003Cbr>e715om PaBox15-97  \u003Cbr>班-e山   |  |  |  |\n| DESIGN DRAWINGS   |  |  |  |\n| Ргоуесг Мате:  \u003Cbr>DESIGNAND SUPERVISION  \u003Cbr>COnsuIтancу еок  \u003Cbr>rенавтАтiON vvOrKs Ат  \u003Cbr>AL-BEIRUNI SECONDARY BOYS  \u003Cbr>SCHOOL IN AL-RAM   |  |  |  |\n| Огамтпд Тпе  \u003Cbr>ехiбтмс своимо гиоов риам   |  |  |  |\n| Ргерагеа ЬуШ   | Оуаг Сопзисапс Со   |  | Scale  \u003Cbr>1:100  \u003Cbr>ф Аз   |\n| Date   | Арг,2025   |  | ЗлеегМЬ  \u003Cbr>A-101   |\n\nSCSI/1F00ERNALWALLELEVATION  \nSILLH=73 CM  \nSILLH=73 CM  \nSLLH=73CM  \nл  \n\n| Notes:  \u003Cbr>оЛЕкМЫЕМЗЮМз а«є мсмимцезз мотео  \u003Cbr>-DMENSIONS SHOULD NOT BE SCALED OUT  \u003Cbr>оЛЕКЮУЕЕб аюе мм имшевб мотео   |  |  |  |\n| --- | --- | --- | --- |\n| Цедепс  \u003Cbr>5ЕСТЮОМ МИМВЕН  \u003Cbr>rEC SHFETNIMBEF  \u003Cbr>Србтнммвёетпимзея  \u003Cbr>нтоовпмбниеуе-  \u003Cbr>FLOOR CONCRETE LEVEL  \u003Cbr>LEVEL SMGNINPLAN  \u003Cbr>нРРМММЕЁТммвея  \u003Cbr>деЭЯМСМВНЕетмимвея  \u003Cbr>вс сомспете гоя сои  \u003Cbr>27 CONCRETE  \u003Cbr>sтоме иан  \u003Cbr>ношом виоскб  \u003Cbr>nsиатом вамрорам зсмтнск   |  |  |  |\n| моктн  \u003Cbr>N   |  |  |  |\n| неу.   | рАТЕ   | oesснтрттом   |  |","cbCaibC5BXarqV0p","https://ap.wps.com/l/cbCaibC5BXarqV0p","pdf",8990739,26,"English","# MAIN DRAWINGS\n## LIST OF DRAWINGS\n## ARCHITECTURAL DRAWINGS","[{\"question\":\"What is the document’s purpose?\",\"answer\":\"It presents the main architectural design drawings and the list of drawing sheets for the rehabilitation consultancy project for Al-Beiruni Secondary Boys School in Al-Ram.\"},{\"question\":\"Who funds the project?\",\"answer\":\"The document states funding from the Ministry of Education (MOE) with Enabel.\"},{\"question\":\"What kinds of drawings are included?\",\"answer\":\"It includes items such as existing ground floor plan(s), preparing work at the ground floor, proposed ground floor plan, proposed ground ceiling plan, and 3D shots of the main hall, each with corresponding sheet numbers and scales.\"}]","DESIGN AND SUPERVISION CONSULTANCY FOR REHABILITATION WORKS AT AL-BEIRUNI SECONDARY BOYS SCHOOL IN AL-RAM - Apr 2025 - MAIN DRAWINGS | PDF",66]