[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-648670-105":59,"doc-detail-648670-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","deschutes-public-library-request-for-qualifications-rfq-22-2315-library-shelving-millwork-addendum-1","Deschutes Public Library Request for Qualifications (RFQ) #22-23/15 Library Shelving Millwork - Addendum #1","","Addendum #1 updates the Deschutes Public Library Request for Qualifications for Library Shelving Millwork ORS279B supporting bond-funded construction projects. It specifies a replacement of the legal advertisement page, adds appendix end panel specifications for the La Pine and Sisters branches, clarifies the proposal submission deadline (January 19, 2023 at 2:00 PM), and confirms proposals cannot be emailed. The addendum also clarifies wood panel/top pricing/unit breakdown, replaces appendix 6 with a revised detailed cost proposal worksheet, and provides instructions for acknowledging receipt of all addenda on the proposal response form.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/deschutes-public-library-request-for-qualifications-rfq-22-2315-library-shelving-millwork-addendum-1/648670/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/deschutes-public-library-request-for-qualifications-rfq-22-2315-library-shelving-millwork-addendum-1/648670.png","ImageObject",300,407,{"name":92,"@type":93},"Sarah ","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-26","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What major document change does Addendum #1 make on Page 2?","Question",{"text":112,"@type":113},"It inserts the existing Page 2 text provided in the addendum and states the original Page 2 has been replaced with Item #1 above, showing the revised due date.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"When are proposals due, and can they be emailed?",{"text":117,"@type":113},"Proposals are due January 19, 2023 at 2:00 PM. The proposal cannot be emailed; a thumb drive or other standard USB device with the same capability must be delivered with the printed hard copies.",{"name":119,"@type":110,"acceptedAnswer":120},"How does the addendum clarify pricing and the wood panel/top breakdown (Appendix 6)?",{"text":121,"@type":113},"It states the revised Appendix 6 replaces the prior detailed cost proposal worksheet and clarifies unit pricing. It also notes drawings are correct and directs pricing detail for the center panel as noted in the revised worksheet.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},648670,1793030486,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":26},962085320529,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","Deschutes Public Library  \nAdministrative Offices Owner’s Representative: Greg Holcomb  \n507 NW Wall St, Bend, OR 97703 Ph \\#541-312-5291  \nemail: [greg@redpointcm.com](greg@redpointcm.com)  \n[chris@redpointcm.com](chris@redpointcm.com)  \nADDENDUM \\#1  \nDeschutes Public Library  \nREQUEST FOR QUALIFICATIONS (RFQ) \\#22-23/15 LIBRARY SHELVING MILLWORK ORS279B  \nIN SUPPORT OF BOND-FUNDED CONSTRUCTION PROJECTS Make note of the following changes and additions to the request for proposals document. ~~Strike Through~~ indicates “DELETE” and RED TEXT indicates“INSERT”.  \n1) Page 2 – Legal Advertisement: Insert Existing Page 2 with the following  \nDeschutes Public Library  \nAdministrative Offices Owner’s Representative: Greg Holcomb  \n507 NW Wall St, Bend, OR 97703 Ph \\#541-312-5291  \nemail: [greg@redpointcm.com](greg@redpointcm.com)  \n[chris@redpointcm.com](chris@redpointcm.com)  \n2) ADD TO BOTTOM OF PAGE 10 LIBRARY SHELVING MILLWORK REQUEST FOR PROPOSAL:  \nAPPENDIX 8 LA PINE SHELVING END PANEL SPECIFICATIONS APPENDIX 9 SISTERS SHELVING END PANEL SPECIFICATIONS  \n3)  QUESTION:  Page 2 of RFP has due the 13th…page 1 the 19th  \nANSWER: PROPOSALS ARE DUE JANUARY 19, 2023 AT 2:00 PM.  \nORIGINAL PAGE 2 HAS BEEN REPLACED WITH ITEM \\#1  \nABOVE. REVISED PAGE 2 SHOWS DUE DATE  \nJANUARY 19, 2023.  \n4)  QUESTION:  Can the proposal be emailed?  \nANSWER: THE PROPOSAL CANNOT BE EMAILED. A THUMB  \nDRIVE OR OTHER STANDARD USB DEVICE WITH SAME CAPABILITY MUST BE DELIVERED WITH THE PRINTED HARDCOPIES  \n5)  QUESTION:  I do not see the wood panel/top spec WD-1 & WD-2  \nANSWER: WOOD SPECIFICATIONS INCLUDED IN THIS  \nADDENDUM AND LABELED “APPENDIX 8 LAPINE SHELVING END PANEL SPECIFICATIONS” AND  \n“APPENDIX 9 SISTERS SHELVING END PANEL  \nSPECIFICATIONS”  \n6)  QUESTION: Appendix 6, how should we break-out the wood? Example: S361172-5S – if stand alone unit it would have 2 end panels and 1  top, If in a row of 4 units it would be 2 end panels and 4 tops etc. should we  look at the drawing and price all the anels/tops associated with these units  as 1 combined price?  \nANSWER: APPENDIX 6 REV LIBRARY SHELVING MILLWORK  \nDETAILED COST PROPOAL WORKSHEET 1 (INCLUDED IN THIS ADDENDUM) REPLACES APPENDIX 6 LIBRARY SHELVING MILLWORK DETAILED COST PROPOSAL WORKSHEET 1 AND CLARIFIES UNIT PRICING.  \nDeschutes Public Library  \nAdministrative Offices Owner’s Representative: Greg Holcomb  \n507 NW Wall St, Bend, OR 97703 Ph \\#541-312-5291  \nemail: [greg@redpointcm.com](greg@redpointcm.com)  \n[chris@redpointcm.com](chris@redpointcm.com)  \n7)  QUESTION:  Drawings are showing panels between wall units…is this  correct?  \nANSWER: DRAWINGS ARE CORRECT. PROVIDE PRICING DETAIL  \nFOR CENTER PANEL AS NOTED IN APPENDIX 6 REV LIBRARY SHELVING MILLWORK DETAILED COST PROPOSAL WORKSHEET 1  \nReminder: Be certain to note receipt of this and any subsequent addenda on the“CERTIFICATION AND CONTRACT OFFER” Proposal Response Form. Acknowledgment of this addendum is a mandatory requirement. Proposals received without responses to all the addenda may be considered nonresponsive.  \nGreg Holcomb Owner’s Representative Deschutes Public Library  \nADDENDUM 8  \nDESCHUTES PUBLIC LIBRARY  \nLA PINE BRANCH  \nLA PINE, OREGON  \nSECTION 06 40 00  \nARCHITECTURAL WOODWORK  \nPART 1 GENERAL  \n1.1 SUMMARY  \nA. Section Includes:  \n1. Wood paneling.  \n2.  Shelving end panels.  \n3. Casework.  \n4. Wood door and relite frames.  \n5. Wood stairs and railings.  \n6. Shop finishing.  \n7. Glazing for architectural woodwork elements.  \n8. LEED documentation.  \nB. Related Sections:  \n1. 01 81 13-Sustainable Building Requirements: LEED requirements for the Project.  \n2. 06 10 00-Rough Carpentry: Blocking for finish carpentry.  \n3. 08 14 00-Wood Doors: Flush doors.  \n4. 08 71 00-Door Hardware.  \n5. 09 90 00-Painting and Coating: Field applied opaque finish coatings.  \n6. 09 93 13-Field Applied Transparent Wood Finishes: Field applied clear wood finishes.  \n1.2 REFERENCES  \nA. American National Standards (ANSI)  \n1. ANSI A208 .1-S","cbCaiqL6NsLwvsBd","https://ap.wps.com/l/cbCaiqL6NsLwvsBd","pdf",636953,24,"English","# ADDENDUM #1\n## Request for Qualifications (RFQ) Updates\n## Submission, Email, and Delivery Requirements\n## Pricing Clarifications and Revised Cost Worksheet\n## Architectural Woodwork Section 06 40 00 Overview","[{\"question\":\"What major document change does Addendum #1 make on Page 2?\",\"answer\":\"It inserts the existing Page 2 text provided in the addendum and states the original Page 2 has been replaced with Item #1 above, showing the revised due date.\"},{\"question\":\"When are proposals due, and can they be emailed?\",\"answer\":\"Proposals are due January 19, 2023 at 2:00 PM. The proposal cannot be emailed; a thumb drive or other standard USB device with the same capability must be delivered with the printed hard copies.\"},{\"question\":\"How does the addendum clarify pricing and the wood panel/top breakdown (Appendix 6)?\",\"answer\":\"It states the revised Appendix 6 replaces the prior detailed cost proposal worksheet and clarifies unit pricing. It also notes drawings are correct and directs pricing detail for the center panel as noted in the revised worksheet.\"}]","Deschutes Public Library Request for Qualifications (RFQ) #22-23/15 Library Shelving Millwork - Addendum #1 | PDF",1792794540]