[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-639633-105":59,"doc-detail-639633-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","derm-sample-om-manual-and-guidelines-revision-12102018-pa","DERM-Sample O&M Manual and Guidelines - Revision-12/10/2018-PA","","DERM sample operations and maintenance (O&M) manual and guidelines for generating a comparable, customized manual for a domestic wastewater collection and transmission system. The material states that the sample cannot be copied as-is for SE certification submission and must be aligned with county ordinance detail levels. It specifies facility-specific preparation requirements, scenario selection, reporting procedures for pump station elapsed time (ET) meter readings via a web application, and consistency with approved plans, as-builts, and permit applications. Includes a sample cover sheet and an indexed section outline.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/derm-sample-om-manual-and-guidelines-revision-12102018-pa/639633/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/derm-sample-om-manual-and-guidelines-revision-12102018-pa/639633.png","ImageObject",300,407,{"name":92,"@type":93},"Liam","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29","2026-10-22",true,{"@type":102,"interactionType":103,"userInteractionCount":81},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"Why can’t the sample O&M manual guidelines be submitted as-is for SE certification?","Question",{"text":112,"@type":113},"It cannot be copied and submitted directly to meet O&M manual requirements. The manual submitted must provide information about the proposed sewer system to be certified according to the sample/guidelines requirements.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What must be done regarding pump station elapsed time (ET) meter readings?",{"text":117,"@type":113},"ET meter readings must be submitted to DERM using the WEB application designed for ET data entry, referencing Section 10 and the PSO permit. The submitted manual must include Section 10 as-is (unedited) to inform the permittee about ET reporting.",{"name":119,"@type":110,"acceptedAnswer":120},"What content and consistency checks are required for the sewer system O&M manual?",{"text":121,"@type":113},"The O&M manual must be consistent with SE construction permit-approved plans, as-builts, FDEP/DERM certification applications, test reports, and PSO application. If substantial deviations exist, a SE permit revision must be applied for before submitting the O&M manual for approval.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},639633,1792878292,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":81,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145},8796095461564,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","DERM-Sample O&M Manual and Guidelines  \n(Revision-12/10/2018-PA)  \nSample Manual Objective:  \nThis Operations and Maintenance (O&M) Manual is provided as a guide for the generation of a comparable manual to be customized for your own sanitary sewer collection system. It is intended to be indicative of the level of detail required by the County ordinance for this document. The material specifically supplied herein does not correspond to any actual facility, nor does the equipment listed match any real product in manufacturer, dimensions, or product number.  \nAN APPLICATION'S SUBMITTAL TO PLACE A DOMESTIC WASTEWATER COLLECTION AND TRANSMISSION SYSTEM INTO OPERATION (SE CERTIFICATION) SHALL NOT BE APPROVED WITHOU THE O&M MANUAL  \nAPPROVAL.  \nTHIS DOCUMENT(O&M SAMPLE-GUIDELINES MANUAL) CANNOT BE COPIED AND SUBMITTED AS IS TO MEET THE O&M MANUAL REQUIREMENTS. THE MANUAL TO BE SUBMITTED REQUIRES TO PROVIDE THE INFORMATION OF THE SEWER SYSTEM PROPOSED TO BE CERTIFIED ACCORDING TO THE REQUIREMENTS OF THE SAMPLE/ GUIDELINES MANUAL.  \nGuidelines to be considered in preparing the manual:  \n􀁸 An O&M Manual specific to your facility must be produced and submitted by the permittee or representative to the Department of Regulatory and Economic Resources (RER), Water & Wastewater Division.  \n􀁸 T h i s s a m p l e s h a l l b e u s e d o n l y a s a t e m p late or guideline for the preparation of the O&M Manual to be submitted. The manual to be submitted shall follow the sample/guidelines RER O&M Manual format and index of contents.  \n􀁸 In some portions of this document, there are multiple examples for different scenarios. In creating the specific O&M Manual document, the preparer must select the correct choice and include such detailed information as the sample indicates.  \n􀁸 The reporting procedures section has been written to meet the requirements of the present ordinance and may be used as provided.  \nThe pump station Elapsed Time (ET) meter readings must be submitted to DERM via  \n􀁸 the WEB Application specifically designed for the ET Data Entry according to Section 10 in this manual and the PSO permit. Section10 shall be included in your manual as is (unedited) . This section is to inform the permittee in reference to ET readings reporting.  \n􀁸 The materials relating to the collection system have been written to meet the ordinance requirements for this subject for private facilities. This material is required by Miami-Dade County Ordinance 96-166 and is more fully described in other documents in this package.  \n. The site plan of the sewer system must be submitted including the collection, pump station, and force main system(s) in accordnace with the Section No.1 and sample site plans provided in the sample/guidelines manual. Site plan(s) shall not be approved if incomplete information is provided according to the site plan(s) requirements. The consultant should be aware that any part of the sewer system(s) (existing or new) in the property where the serwer system(s) proposed to be certified is located shall be identified as Private or Public and Existing or New (see sample site plans in this Manual Guidelines) .  \n. The O&M manual shall be consistent with the SE construction permit-approved plans, asbuilts, FDEP / DERM certification applications, test reports, and PSO application. If any substantial deviation exist between the SE approved plans and the asbuilts, the consultant should apply for a SE permit revision before submitting the O&M Manual for approval. Contact Water&Wastewater Division (W&WD) for an evaluation of the changes in the sewer system approved and permit revision requirements (305-372-6600) .  \n. The utility serving the sewer system proposed tobe certified at the point of connection at public sewers shall be identified in the overall sewer site plan required in Section 1 of the O&M Manual. The identification note shall be similar to \"Private sewers collected by WASD, City of Miami Beach, etc, at POC\".  \n. The folio(s)","cbCaiiKJJolCSLhI","https://ap.wps.com/l/cbCaiiKJJolCSLhI","pdf",1436993,29,"English","# Sample Manual Objective\n# Guidelines to be considered in preparing the manual\n## Pump station ET meter readings reporting\n## Collection system and site plan submission\n## Consistency with approved plans and permit revision\n# Sample Cover Sheet\n# Index","[{\"question\":\"Why can’t the sample O\\u0026M manual guidelines be submitted as-is for SE certification?\",\"answer\":\"It cannot be copied and submitted directly to meet O\\u0026M manual requirements. The manual submitted must provide information about the proposed sewer system to be certified according to the sample/guidelines requirements.\"},{\"question\":\"What must be done regarding pump station elapsed time (ET) meter readings?\",\"answer\":\"ET meter readings must be submitted to DERM using the WEB application designed for ET data entry, referencing Section 10 and the PSO permit. The submitted manual must include Section 10 as-is (unedited) to inform the permittee about ET reporting.\"},{\"question\":\"What content and consistency checks are required for the sewer system O\\u0026M manual?\",\"answer\":\"The O\\u0026M manual must be consistent with SE construction permit-approved plans, as-builts, FDEP/DERM certification applications, test reports, and PSO application. If substantial deviations exist, a SE permit revision must be applied for before submitting the O\\u0026M manual for approval.\"}]","DERM-Sample O&M Manual and Guidelines - Revision-12/10/2018-PA | PDF",1792704682,73]