[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-664851-105":59,"doc-detail-664851-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","demolition-plans-basement-first-second-thid-floors","Demolition Plans - Basement, First, Second, Thid Floors","","Demolition plans specify staged removal and replacement scope for a multi-floor building, including exterior and interior elements. Exterior work requires removing dashed windows and doors, repairing a metal clad bay window with associated sheathing and trim, while preserving the existing fire escape and fire balcony. Interior scope includes removing dashed walls, doors, and partitions with related MEP components, stripping floor and ceiling finishes to substrate, and defining contractor responsibilities for disposal, protection, patching, and coordination.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/demolition-plans-basement-first-second-thid-floors/664851/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/demolition-plans-basement-first-second-thid-floors/664851.png","ImageObject",300,407,{"name":92,"@type":93},"dawugda","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What exterior items are required to be removed or preserved?","Question",{"text":112,"@type":113},"Remove all windows and doors shown dashed. Repair the existing metal clad bay window as necessary, and keep the existing fire escape and fire balcony.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What is the interior demolition scope regarding walls, doors, and finishes?",{"text":117,"@type":113},"Remove all existing walls, doors, and partitions shown dashed, including mechanical, electrical, and plumbing items there in. Remove floor and ceiling finishes back to substrate and retain the existing main stair.",{"name":119,"@type":110,"acceptedAnswer":120},"What responsibilities are assigned to the general contractor for coordination and utility handling?",{"text":121,"@type":113},"The general contractor must coordinate demolition with structural drawings, provide temporary shoring as required, locate and coordinate all existing utilities prior to excavation, and coordinate careful removal of existing lighting with new lighting plans.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},664851,1793276504,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81},3985747870947,"https://ap-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","File Location : L :\\Titleblocks\\24x36Titleblock-New .dwg  \n[E] MOSAIC FLOOR TO BE REMOVED  \n[E] WOOD TREADSAND RISERS TO BE REPLACED  \nMYRTLE STREET  \nEXISTING VESTIBULE WALLS TO REMAIN, REMOVE ALL INTERCOMS, MAILBOXES & LOCK BOXES AND REPAIR WALLS  \n83 PICKNEY STREET  \n81 PICKNEY STREET  \nSecond Floor Plan 3/16\" = 1'-0\"  \n83 PICKNEY STREET  \n81 PICKNEY STREET  \nThird Floor Plan 3/16\" = 1'-0\"  \nDEMOLITION NOTES DEMOLITION LEGEND  \nE X T E R I O R:  \n1. REMOVE ALL WINDOWS AND DOORS SHOWN DASHED.  \n2. REPAIR EXISTING METAL CLAD BAY WINDOW, ASSOCIATED SHEATHING AND TRIM AS NECESSARY.  \n3. EXISTING FIRE ESCAPE AND FIRE BALCONY TO REMAIN  \nI N T E R I O R:  \n1. REMOVE ALL EXISTING WALLS, DOORS, AND PARTITIONS SHOWN DASHED, INCLUDING ALL MECHANICAL, ELECTRICAL AND PLUMBING ITEMS THERE IN.  \n2. EXISTING MAIN STAIR TO REMAIN.  \n3. REMOVE ALL FLOOR AND CEILING FINISHES BACK TO SUBSTRATE.  \n4. CONTRACTOR RESPONSIBLE FOR THE REMOVAL AND DISPOSAL OF APPLIANCES AND PLUMBING FIXTURES, ACCESSORIES AND ASSOCIATED HARDWARE.  \n5. CONTRACTOR IS RESPONSIBLE FOR THE DEMOLITION OF ALL CEILINGS, FURRING STRIPS AND FASTENERS DOWN TO EXPOSED STRUCTURE WHERE INDICATED.  \n6. G. C. IS RESPONSIBLE FOR PATCHING AND FINISHING ANY REMAINING WALLS AFFECTED BY THE DEMOLITION TO MATCH EXISTING EXACTLY.  \n7. G. C. SHALL BE FULLY RESPONSIBLE FOR PROTECTING ALL EXISTING SURFACES AND ITEMS TO REMAIN, TYPICAL THROUGHOUT.  \n8. G. C. IS RESPONSIBLE FOR LOCATING/COORDINATING ALL EXISTING UTILITIES PRIOR TO EXCAVATION AND ANY OBSTRUCTION SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR TO COMPLETING WORK.  \n9. COORDINATE ALL DEMOLITION WITH STRUCTURAL DRAWINGS. PROVIDE TEMPORARY SHORING AS REQUIRED.  \n10. GC IS RESPONSIBLE FOR PROVIDING DEMOLITION ENGINEERING.  \n11. EXISTING INTERIOR PARTITIONS ARE ASSUMED 2x4 WOOD STUDS WITH PLASTER OR GWB FINISH.  \n12. REMOVE AND PROPERLY DISPOSE OF ALL BASE TRIM, WAINSCOTING, CASING, AND CROWN MOLDING UNLESS OTHERWISE NOTED.  \nMEP NOTES  \n1. G. C. IS RESPONSIBLE FOR THE REMOVAL OF ALL PLUMBING FIXTURES.  \n2. G. C. IS RESPONSIBLE FOR KEEPING AND CAPPING OFF ANY PIPING WITHIN WALLS NOT BEING DEMOLISHED.  \n3. G. C. TO COORDINATE CAREFUL REMOVAL OF EXISTING LIGHTING WITH NEW LIGHTING PLANS.  \n4. G. C. TO MAKE OBSOLETE ALL EXISTING KNOB AND TUBE WIRING. REMOVE WHERE DEMOLITION ALLOWS.  \n5. G. C. SHALL REMOVE ALL EXISTING WIRING, FIXTURES, AND PIPE LINES ON REAR ELEVATION OF BUILDING.  \nRoom  \nname  \n101  \n150 SF  \nDOOR TO BE DEMOLISHED  \nWALL TO REMAIN  \nWALL TO BE DEMOLISHED  \nWINDOW TO BE REPLACED  \nROOM TAG  \nU. N. O. UNLESS NOTED OTHERWISE  \n  CENTERLINE  \nA. F. F. ABOVE FINISHED FLOOR  \nG.C. GENERAL CONTRACTOR  \nV. I. F. VERIFY IN FIELD  \nAREA OF FLOOR TO BE REMOVED  \nAREA OF FLOOR TO BE INFILLED  \n5 D1/4-o0\"lition Notes 6 D1/4-o0\"lition Legend  \n| \u003Cbr>MEYER & MEYER\u003Cbr>ARCHITECTURE AND\u003Cbr>INTERIORS\u003Cbr>F: 617.266.2952\u003Cbr>T: 617.266.0555\u003Cbr>396 Commonwealth Avenue Boston, Massachusetts 02215 |\n| --- |\n| Project:\u003Cbr>112 Myrtle Street\u003Cbr>Boston, MA\u003Cbr>Issue Dates and Revisions:\u003Cbr>Permit Set 2/22/19\u003Cbr>Bid Set 8/1/19\u003Cbr>General Notes:\u003Cbr>General Contractor shall make all Subcontractors and Suppliers aware of the requirements of these notes.\u003Cbr>All work shall be performed in compliance with all applicable Local, State and National Building, Life Safety and Electrical Codes.\u003Cbr>General Contractor shall be responsible for securing all permits as necessary for the completion of work shown throughout the Contract Documents.\u003Cbr>General Contractor shall lay out in the field the entire work to verify dimensional relationships before constructing any part, and shall verify all existing conditions and locations before proceeding.\u003Cbr>Failure to verify dimensions and conditions before proceeding may subject the General Contractor to the required removal of completed work at General Contractor cost, ifa discrepancy which could have been discovered causes modifications to the plans.\u003Cbr>General Contractor shall coordinate the dimensional requir","cbCailKdO2WaGJMy","https://ap.wps.com/l/cbCailKdO2WaGJMy","pdf",291295,"English","# Demolition Notes\n## Exterior\n## Interior\n# MEP Notes\n# Project Information\n## Registration and Drawing Details","[{\"question\":\"What exterior items are required to be removed or preserved?\",\"answer\":\"Remove all windows and doors shown dashed. Repair the existing metal clad bay window as necessary, and keep the existing fire escape and fire balcony.\"},{\"question\":\"What is the interior demolition scope regarding walls, doors, and finishes?\",\"answer\":\"Remove all existing walls, doors, and partitions shown dashed, including mechanical, electrical, and plumbing items there in. Remove floor and ceiling finishes back to substrate and retain the existing main stair.\"},{\"question\":\"What responsibilities are assigned to the general contractor for coordination and utility handling?\",\"answer\":\"The general contractor must coordinate demolition with structural drawings, provide temporary shoring as required, locate and coordinate all existing utilities prior to excavation, and coordinate careful removal of existing lighting with new lighting plans.\"}]","Demolition Plans - Basement, First, Second, Thid Floors | PDF"]