[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-664853-105":59,"doc-detail-664853-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","demolition-plan-demolition-plan","DEMOLITION PLAN - Demolition Plan","","Architectural demolition plan package for a remodel project at County Fire Station No. 17, including project name, address, drawing metadata, and drawing identification. The demolition drawings specify what existing interior walls, doors, casework, lavatory counters, flooring, plumbing fixtures, equipment, windows, and related items are to be removed for new openings. Demolition general notes govern ductwork removal back to the plenum, utility coordination, safety control and disposal, utility notifications, selective salvage of reusable items, and coordination with mechanical, electrical, and plumbing plans, including cutting, capping, and sealing per codes.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/demolition-plan-demolition-plan/664853/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/demolition-plan-demolition-plan/664853.png","ImageObject",300,407,{"name":92,"@type":93},"ahduag","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What existing elements are scheduled for removal in the demolition plan?","Question",{"text":112,"@type":113},"The plan lists interior walls, doors and frames, casework, lavatory counters, flooring, plumbing fixtures, equipment, and windows to be removed, along with portions of wall removed for new openings.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How are ductwork and HVAC demolition requirements defined?",{"text":117,"@type":113},"All existing ductwork is to be removed back to the plenum unless noted otherwise, and abandoned HVAC equipment and ductwork must be removed and coordinated with the mechanical plans.",{"name":119,"@type":110,"acceptedAnswer":120},"What coordination and safety obligations apply to demolition work?",{"text":121,"@type":113},"The contractor must coordinate mechanical, electrical, and plumbing demolition work with the relevant plans and the general contractor, notify affected utility companies before starting, provide temporary means of egress and safety devices, and patch and repair floor slab and walls after demolition prior to new construction.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},664853,1793276507,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81},3985747870414,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","| 1   | J O H N K R I S T E D J A  \u003Cbr>A R c H I T E c T  \u003Cbr>ARCHITECTURE ■ PLANNING  \u003Cbr>6288 BUTTERFIELD WAY  \u003Cbr>PLACERVILLE,CA 95667  \u003Cbr>(916)933-7633 T  \u003Cbr>(916)933-7650 F   |  |  |  |  |\n| --- | --- | --- | --- | --- | --- |\n|  | ARCHITECT'S STAMP   |  |  |  |  |\n|  | CONSULTANT   |  |  |  |  |\n|  | PROJECT NAME  \u003Cbr>COUNTY  \u003Cbr>FIRE STATION NO.17  \u003Cbr>REMODEL   |  |  |  |  |\n|  | PROJECT ADDRESS  \u003Cbr>C426  \u003Cbr>6430 PONY EXPRESS TRAIL  \u003Cbr>POLLOCK PINES,CA 95726   |  |  |  |  |\n|  | DRAWING NAME  \u003Cbr>DEMOLITION  \u003Cbr>PLAN   |  |  |  |  |\n|  | SUBMITTAL   |  |  |  | DATE   |\n|  |  |  |  |  |  |\n|  |  |  |  |  |  |\n|  |  |  |  |  |  |\n|  |  |  |  |  |  |\n|  |  |  |  |  |  |\n|  |  |  |  |  |  |\n|  | NO   | DATE   | REVISION   |  |  |\n|  | △   |  |  |  |  |\n|  |  |  |  |  |  |\n|  | △   |  |  |  |  |\n|  | △   |  |  |  |  |\n|  | △   |  |  |  |  |\n|  | △   |  |  |  |  |\n|  | △   |  |  |  |  |\n|  | DRAWN BY:JK   |  |  | CHECKED BY:JK   |  |\n|  | DATE:07/28/2020   |  |  | SCALE:NOTED   |  |\n|  | 202103  \u003Cbr>PROJECT NUMBER:   |  |  |  |  |\n|  | DRAWING NUMBER:  \u003Cbr>A2.1   |  |  |  |  |\n|  |  |  |  |  |  |\n\nPORTION OF(E)WALL TO BE REMOVED FOR NEW OPENING  \nD1D2D3D4D5D6D7D8D9DD  \nEXIST.INTERIOR WALL TO BE REMOVED  \nEXIST.DOOR/FRAMES TO BE REMOVED  \nEXIST.CASEWORK TO BE REMOVED  \nEXIST.LAVATORY COUNTER TO BE REMOVED  \nEXIST.FLOORING TO BE REMOVED  \nEXIST.PLUMBING FIXTURE TO BE REMOVED  \nEXIST.EQUIPMENT TO BE REMOVED  \nEXIST.WINDOW TO BE REMOVED  \nEXIST.PAlTe2 To BE EWoED  \nAPPROVED BY  \nEL DORADO COUNTY  \nCOMMUNITY DEVELOPMENT AGENCY  \nPLANNING SERVICES  \nDate:  \nBy:  \nConditions:  \n1/4\"=1'-0\"  \n# DEMOLITION PLAN\n\nDEMOLITION GENERAL NOTES              \n17.ALL(E)DUCTWORK ARE TO BE REMOVED BACK TO THE PLENUM U.N.O.ON THE  \n## 13.DEMOLITION CONTRACTOR SHALL REMOVE ALL (E)FLOOR COVERING AND/OR\n\nMECHANICAL PLANS.ALL ABANDONED HVAC EQUIPMENT AND DUCTWORK SHALL BE  \n## 88NTAGT8RA2A8DE ARACEFAC5 ARn WCCNFEHAJERIALS\n\n1.  \nFINISHES,UNDERLAYMENT,GLUE AND ANY OTHADHESIVE AND SHALL PREPARE  \nREMOVED  \nTHE FLOOR SLAB FOR THE NEW FLOOR FINISHES OR COVERINGS AS SPECIFIED  \nSOSC5O°EKNG ARLGSBLE BGATRYNARBSCERAESAEN  \nBY THE MANUFACTURER  \n18.CONTRACTOR TO COORDINATE THE REMOVAL,DISCONNECTION AND/OR CAPPING OF  \n## 2.\n\nANY UTILITIES WITH OWNER AS NECESSARY.ALL UNDER-SLAB UTILITY LINES TO  \n14.DEMOLITION CONTRACTOR SHALL COORDINATE ALL MECHANICAL,ELECTRICAL ANDPLUMBING DEMOLITION WORK WTH PLANS PRIOR TO THE COMMENCEMENT OFANY_WORK AND COORDINATE HIS_WORK WTH THE GENERAL CONTRACTOR ANDOTHER SUB-CONTRACTORS AS NECESSARY  \nBE CUT,CAPPED AND SEALED PER STATE AND LOCAL CODES  \n3.CONFQRM JO APPLICABLE CODE FOR DEMOLITION OFSTSTRUCTURES.SAFETY OF ADJACENT STRUCTURES,DUST  \n## 19.ELECTRICAL CONTRACTOR SHALL DISCONNECT AND REMOVE ALL(E)ELECTRICAL AND\n\nCONTROL and DISPOSAL OF MATERIALS  \nFLEPHONE OUTLETS AND ALL ASSOCIATED WIRES IN WALLS SCHEDULED TO_BE  \n## 4.NOIFY AFFECTED UTILITY COMPANIES BEFORE STARTING\n\nREMOVED AND TERMINATED AT THE LAST OUTLET THAT REMAINS IN SERVCE  \nWORK and COMPLY WITH THEIR REQUIREMENTS  \n15.ALL MECHANICAL,ELECTRICAL AND PLUMBING FIXTURES,EQUIPMENT AND/ORDEVICES IN WORKING AND IN SATISFACTORY CONDITION TO REMAIN AND RE-USEDAS NOTED PER PLANS.WHEN SPECIFIED TO BE SALVAGED OR RECONDITIONEDFOR RE-USE,THESE ITEMS ARE TO BE INSPECTED BYA QUALIFIED TECHNICIANOR TRADESPERSON AND_SHALL ADVISE THE OWNER AND ARCHITECT_OF VIABILITYOF SALVAGED ITEMS FOR RE-USE.COORDINATE WTH MECHANICAL,ELECTRICALAND PLUMBING PLANS  \n## 5.DEMOLISH EXISTING WORK IN AN ORDERLY AND CAREFUL MANNERAS REQ’D\n\n20.ALL EMPTY OR ABANDONED CONDUIT AND JUNCTION BOXES TO BE REMOVED BACK  \nTO ACCOMMODATE NEW WORK,PREVENT MOVEMENT OR SETTLEMENT OF STRUCT.  \nTO ITS SOURCE  \nPROVIDE BRACING AND/OR 'SHORING AS REQUIRED TO MAINTAIN SAFETY  \n21.REMOVAL AND CAPPING OF PLUMBING FIXTURES T0 BE COORDINATED PER PLAN  \n## 6.COORDINATE ALL DEMOLITION WORK WTH OWNER AS NECESSARY\n\nAND WITH GENERAL CONTRACTOR_TO MAINTAIN REQUIRED MINIMUM USAGE DURING  \nCONSTRUCTION(WHEN APPLICABLE)  \n## 7.GEN","cbCaifGqkz3V7kxE","https://ap.wps.com/l/cbCaifGqkz3V7kxE","pdf",2641864,"English","# DEMOLITION PLAN\n## Project and Drawing Information\n## Demolition General Notes","[{\"question\":\"What existing elements are scheduled for removal in the demolition plan?\",\"answer\":\"The plan lists interior walls, doors and frames, casework, lavatory counters, flooring, plumbing fixtures, equipment, and windows to be removed, along with portions of wall removed for new openings.\"},{\"question\":\"How are ductwork and HVAC demolition requirements defined?\",\"answer\":\"All existing ductwork is to be removed back to the plenum unless noted otherwise, and abandoned HVAC equipment and ductwork must be removed and coordinated with the mechanical plans.\"},{\"question\":\"What coordination and safety obligations apply to demolition work?\",\"answer\":\"The contractor must coordinate mechanical, electrical, and plumbing demolition work with the relevant plans and the general contractor, notify affected utility companies before starting, provide temporary means of egress and safety devices, and patch and repair floor slab and walls after demolition prior to new construction.\"}]","DEMOLITION PLAN - Demolition Plan | PDF"]