[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-664852-105":59,"doc-detail-664852-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","demolition-management-plan-issue-no-1-square-civil-pty-ltd-revision-14","Demolition Management Plan - Issue No. 1 - Square Civil Pty Ltd Revision 1.4","","Demolition Management Plan prepared for the Greenwich Hospital project at 97-115 River Rd, Greenwich NSW 2065, for Hindmarsh, trading as Chalouhi. The document sets out controlled distribution, revision history (including dates and changed sections), and a structured contents framework covering introduction, environmental policy, waste management, scope of works, methodology, inspection and preliminaries, hazardous materials handling, demolition sequencing, staging plans, and site plans. It specifies compliance with AS2601-2001 and outlines procedures for environmental and waste management, including indicative recycling and tipping targets, plus required licences and notifications for asbestos and demolition.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/demolition-management-plan-issue-no-1-square-civil-pty-ltd-revision-14/664852/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/demolition-management-plan-issue-no-1-square-civil-pty-ltd-revision-14/664852.png","ImageObject",300,407,{"name":92,"@type":93},"asba","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":24},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What project and site details does the Demolition Management Plan cover?","Question",{"text":112,"@type":113},"It covers demolition works for Greenwich Hospital at 97-115 River Rd, Greenwich NSW 2065, commissioned by Hindmarsh and undertaken by Square Civil Pty Ltd trading as Chalouhi.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How is environmental and waste management addressed in the plan?",{"text":117,"@type":113},"The plan includes an environmental policy section and waste management approach, with indicative tipped tonnage and recycling targets, plus segregation and processing areas established on site to facilitate recycling.",{"name":119,"@type":110,"acceptedAnswer":120},"What approach does the plan specify for hazardous materials and asbestos?",{"text":121,"@type":113},"The methodology includes inspection and preliminaries, handling and disposal of hazardous materials, and asbestos removal and disposal in accordance with EPA conditions and relevant notifications and licences listed in the appendices.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},664852,1793276504,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":24,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144},3985747872567,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","Demolition  \nManagement Plan  \nCLIENT: HINDMARSH  \nPROJECT NAME: Greenwich Hospital  \nADDRESS: 97-115 River Rd Greenwich NSW 2065. NSW PCODE: 2065  \nIssue No. 1.0 Square Civil Pty Ltd ABN 72 614 018 585 Trading as CHALOUHI  \nBusiness Name: Square Civil Pty Ltd  \nTrading Name: Chalouhi  \nDocument Title: Demolition Management Plan  \nDocument\\#: MAN-004 Revision\\# 1.3 Date: 07/05/2026  \nDistribution List Controlled copies of this site plan have been issued to the following people  \n\n| No: | Recipient | Company | Position | Initial Issue Date: |\n| --- | --- | --- | --- | --- |\n| 01 | Maryo Faris | Chalouhi | Project Manager | 16/04/2026 |\n| 02 | Kevin Lu | Chalouhi | Project Engineer | 16/04/2026 |\n| 03 | Jad Kawtarani | Chalouhi | Site Engineer | 16/04/2026 |\n| 04 | Kirk Papoulis | Chalouhi | Site Manager | 16/04/2026 |\n| 05 | Hindmarsh Project Team | Hindmarsh | Varied | 16/04/2026 |\n\nRevision Record: Any revision made to this DMP is to be recorded below:  \n\n| Revision | Date | Section | Page | Revision Details |\n| --- | --- | --- | --- | --- |\n| 1.0 | 16/04/2026 | All | All | Initial Creation |\n| 1. 1 | 24/04/2026 | All | All | Revised |\n| 1. 2 | 28/04/2026 | All | All | Revised temp services and missing program |\n| 1.3 | 07/05/2026 | All | All | Revised Demolition Methodology and Certificates included |\n| 1.4 | 07/05/2026 | All | All | Revised Demolition Methodology and Certificates included |\n\nThis Demolition Management Plan has been prepared by:  \nPrint Name: Maryo Faris (Project Manager)  \nSigned:  Dated: 07/05/2026  \nPage 1  \nSQUARE CIVIL Demolition Management Plan Version 1.3  \nDOCUMENT CONTROLS – DISTRIBUTION & REVISION 1  \nCONTENTS 2  \nDMP 001 INTRODUCTION 3  \nDMP 002 ENVIRONMENTAL POLICY 4  \nDMP 003 WASTE MANAGEMENT 5  \nDMP 004 SCOPE OF WORKS 6  \n4.1 Site Description and Layout 6  \n4.2 Detailed Scope of works 6  \nDMP 005 METHODOLOGY 8  \n5.1 General 8  \n5.2 Inspection and Preliminaries 9  \n5.3 Handling and Disposal of Hazardous Materials 11  \n5.4 Demolition Methodology 11  \n5.6 Staging Plan 17  \nDPM 006 SITE PLANS 18  \nDMP 007 KEY ITEMS 20  \nAPPENDIX A 22  \nDemolition Licence 22  \nFriable Asbestos Removal Licence 23  \nEPA Licence 24  \nPublic Liability Certificate of Currency 25  \nWorkers Compensation Insurance 26  \nSafe Wok NSW Notification – Demolition 27  \nSafe Work NSW Notification – Asbestos 28  \nAPPENDIX B 29  \nAPPENDIX C 30  \nAPPENDIX D 31  \nAPPENDIX E 32  \nPage 2  \nSQUARE CIVIL Demolition Management Plan Version 1.3  \nHindmarsh Constructions commissioned Chalouhi to undertake and complete the demolition works at Greenwich Hospital, 97-115 River Road, Greenwich, NSW. The site location is shown on Figure below.  \n([Googlemaps.com.au](Googlemaps.com.au) – Image of Site )  \nThe DMP has been prepared in accordance with AS2601-2001 .Quality Temporary Works Engineer will be engage who holds the appropriate Professional Indemnity (PI) insurance.  \nThe demolition will have to follow a sequence to be agreed upon with a temporary works engineer as per the methodology submitted. In particular placing machinery on slabs and demolition control joint of the main 5 storey building. We will review and confirm the main hospital building’s control joint location to determine the precise point at which demolition works will cease prior to commencing long-reach demolition activities. The same Temporary Works Engineer will provide individual certifications/approvals for each building regarding the use of small machinery—such as a positrack or bobcat—operating on suspended floors for the removal of demolition waste.  \nThe DMP will be followed by Chalouhi as an action plan for the project. All supervisors and staff will be required to read and work to the methodology unless directed by senior management or the principal contractor, in which instance the DMP will be modified to incorporate the changes to the plan. These changes may be the result in Design, Engineering, or Programming issues.  \nChalouhi will comply with all legislations, ","cbCaivlrJuw6maiz","https://ap.wps.com/l/cbCaivlrJuw6maiz","pdf",19705966,43,"English","# DMP 001 INTRODUCTION\n# DMP 002 ENVIRONMENTAL POLICY\n## Environmental policy and compliance provisions\n# DMP 003 WASTE MANAGEMENT\n# DMP 004 SCOPE OF WORKS\n## Site Description and Layout\n## Detailed Scope of works\n# DMP 005 METHODOLOGY\n## General\n## Inspection and Preliminaries\n## Handling and Disposal of Hazardous Materials\n## Demolition Methodology\n## Staging Plan\n# DMP 006 SITE PLANS\n# DMP 007 KEY ITEMS\n# APPENDIX A\n## Demolition Licence and supporting permits\n# APPENDIX B\n# APPENDIX C\n# APPENDIX D\n# APPENDIX E","[{\"question\":\"What project and site details does the Demolition Management Plan cover?\",\"answer\":\"It covers demolition works for Greenwich Hospital at 97-115 River Rd, Greenwich NSW 2065, commissioned by Hindmarsh and undertaken by Square Civil Pty Ltd trading as Chalouhi.\"},{\"question\":\"How is environmental and waste management addressed in the plan?\",\"answer\":\"The plan includes an environmental policy section and waste management approach, with indicative tipped tonnage and recycling targets, plus segregation and processing areas established on site to facilitate recycling.\"},{\"question\":\"What approach does the plan specify for hazardous materials and asbestos?\",\"answer\":\"The methodology includes inspection and preliminaries, handling and disposal of hazardous materials, and asbestos removal and disposal in accordance with EPA conditions and relevant notifications and licences listed in the appendices.\"}]","Demolition Management Plan - Issue No. 1 - Square Civil Pty Ltd Revision 1.4 | PDF",108]