[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-663698-105":59,"doc-detail-663698-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","dc-cabinet-specifications-wood-laboratory-casework-section-12-35-5319","DC Cabinet Specifications - Wood Laboratory Casework Section 12 35 53.19","","Wood laboratory casework specifications detailing flush or reveal overlay cabinet construction, engineered-core doors and drawers, premium veneer fronts, and dimensional placement extending past the cabinet body. Defines scope for cabinets, supporting structures, tops and ledges, filler panels, utility service outlet accessories, electrical receptacles and switches, and laboratory sinks, drains, and associated fittings packaged for appropriate contractors. Establishes basis of work using Diversified Casework Majestic series, requires no alternates, and outlines quality assurance, SEFA 8W compliance, MAS/Green Guard certification, factory-certified installation, shrink-wrap protection, and installation submittal and cleaning requirements.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/dc-cabinet-specifications-wood-laboratory-casework-section-12-35-5319/663698/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/dc-cabinet-specifications-wood-laboratory-casework-section-12-35-5319/663698.png","ImageObject",300,407,{"name":92,"@type":93},"Rhys","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What items are included in the cabinet and casework scope?","Question",{"text":112,"@type":113},"All cabinets and casework components are included, including tops, ledges, supporting structures, miscellaneous equipment items, filler panels, knee space panels, and scribes, plus required utility service outlet fittings and mounted electrical components.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Which product line and construction standard are specified as the basis of work?",{"text":117,"@type":113},"The specification uses Diversified Casework (Diversified Casework) - Majestic Series (reveal overlay) Maple Cabinetry as the standard for wood laboratory casework quality and functional installation.",{"name":119,"@type":110,"acceptedAnswer":120},"What quality assurance requirements must the contractor and cabinets meet?",{"text":121,"@type":113},"The contractor must provide proper work tops and fume hoods for single-source responsibility, ensure cabinets are foam and shrink wrapped, and demonstrate compliance through SEFA 8W testing with documentation, plus MAS or Green Guard certification documentation.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},663698,1793230585,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144},687207024643,"https://ap-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","CABINET  \nspe  \nCABINET SPECIFICATIONS  \nMajestic  \nMillennium Monarch  \n• Flush or Reveal Overlay Construction  \n• 3/4″ Engineered Core Doors and Drawers  \n• Door and Drawer Fronts with Premium Grade Veneers (3 mm Banding)  \n• Door and Drawer Fronts Occupy a Plane  \n• Extending 3/4″ Past the Cabinet Body  \n• Vertical Grain Match for Doors and Drawers  \nSECTION 12 35 53.19 – WOOD LABORATORY CASEWORK MajM 07.25.21  \nDiv  \nPART 1 GENERAL  \n1.01 SUMMARY  \nA. Section Includes:  \n1. All cabinets and casework, including tops, ledges, supporting structures, and miscellaneous items of equipment as listed in these specifications, or equipment schedules including delivery to the building, setting in place, leveling, scribing to walls and floors as required. Furnish and install all filler panels, knee space panels and scribes as shown on drawings. Installation shall be completed by a factory certified installer.  \n2. Furnish and deliver all utility service outlet accessory fittings, electrical receptacles, and switches, as listed in these specifications, equipment schedules or as shown on drawings as mounted on the laboratory furniture. Items shall be furnished with supply tank nipples and lock nuts, loose in boxes and properly marked. All plumbing and electrical fittings will be packaged separately and properly marked for delivery to the appropriate contractor.  \n3. Furnish and deliver, packed in boxes for installation by the mechanical contractor, all laboratory sinks, cup sinks or drains, drain troughs, overflows and sink outlets with integral tailpieces, which occur above the floor and where these items are part of the equipment or listed in the specifications, equipment schedules or shown on the drawings. Integral tailpieces when required shall be in accordance with the manufacturer's standards. All tailpieces shall be furnished less the couplings required to connect them to the drain piping system.  \n4. Furnish service strip supports and set in place service tunnels, service turrets, supporting structures and reagent racks of the type shown on the details.  \n5. Remove all debris, dirt and rubbish accumulated as a result of the installation of the laboratory casework to an onsite container provided by others, leaving the premises clean and orderly.  \nB. Related Divisions:  \n1. Divisions 05 00 00 & 06 00 00: Behind-the-Wall Blocking and Studs  \n2. Division 09 00 00: Base Molding  \n3. Division 11 53 13: Chemical Fume Hoods  \n4. Division 22 00 00: Plumbing  \n5. Division 26 00 00: Electrical Fittings and Connections  \nC. Related Publications:  \n1. Architectural Woodwork Institute Quality Standards , 8th Edition  \n2. NFPA 30-National Fire Protection Association  \n3. NFPA-45-National Fire Protection Association  \n4. UL-Underwriters Laboratory  \n5. ASTM D552-Bending Test  \n6. SEFA 8W-Laboratory Furniture  \n1.02 BASIS OF WORK  \nA. This specification uses Diversified Casework ([www.diversifiedcasework.com](www.diversifiedcasework.com)) -Majestic Series (reveal overlay) Maple Cabinetry as the standard of construction for wood laboratory casework. The construction standards of this product line shall provide the basis for quality and functional installation. Pricing from other manufacturers must be submitted as an alternate in order to assure quality standards are maintained.  \nB. Supply all equipment in accordance with this specification. No alternates, deviations or exceptions to the specified construction or materials are allowed.  \nC. As a means of maintaining the desired level of quality, any and all other manufacturers  \nshall be submitted as an alternate to the specified product provided by Diversified Casework.  \nD. The owner / owner representative reserves the right to reject qualified or alternate proposals and to award based on product value where such action assures the owner greater integrity of product.  \n1.03 QUALITY ASSURANCE – the following items are required components of this specification and cannot be modified.  \nA. The wo","cbCaintIkz9PwASB","https://ap.wps.com/l/cbCaintIkz9PwASB","pdf",972754,87,"English","# Part 1 General\n## 1.01 Summary\n## 1.02 Basis of Work\n## 1.03 Quality Assurance\n## 1.04 Submittals","[{\"question\":\"What items are included in the cabinet and casework scope?\",\"answer\":\"All cabinets and casework components are included, including tops, ledges, supporting structures, miscellaneous equipment items, filler panels, knee space panels, and scribes, plus required utility service outlet fittings and mounted electrical components.\"},{\"question\":\"Which product line and construction standard are specified as the basis of work?\",\"answer\":\"The specification uses Diversified Casework (Diversified Casework) - Majestic Series (reveal overlay) Maple Cabinetry as the standard for wood laboratory casework quality and functional installation.\"},{\"question\":\"What quality assurance requirements must the contractor and cabinets meet?\",\"answer\":\"The contractor must provide proper work tops and fume hoods for single-source responsibility, ensure cabinets are foam and shrink wrapped, and demonstrate compliance through SEFA 8W testing with documentation, plus MAS or Green Guard certification documentation.\"}]","DC Cabinet Specifications - Wood Laboratory Casework Section 12 35 53.19 | PDF",219]