[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-662545-105":59,"doc-detail-662545-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","daphne-utilities-standard-specifications-2019","Daphne Utilities - Standard Specifications - 2019","","Daphne Utilities Standard Specifications provide approved engineering and construction requirements for sanitary sewer and utility infrastructure. The document defines developer, engineer, and architect submittal steps, then establishes design criteria for sanitary sewer, water systems, and gas facilities. Construction specifications cover water mains installation, inspection, materials, testing, chlorination, and safety controls, along with sanitary sewer mains, manhole rehabilitation, CIPP sewer rehabilitation, and sewage pumping station requirements including controls, monitoring, pumps, and acceptance.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/daphne-utilities-standard-specifications-2019/662545/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/daphne-utilities-standard-specifications-2019/662545.png","ImageObject",300,407,{"name":92,"@type":93},"acoobca","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":24},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What approval and submittal steps are included in the standard specifications?","Question",{"text":112,"@type":113},"The document lists Division I guidelines for developers, engineers, and architects, and specifies an application process for approval to construct sanitary sewer and/or water distribution and/or gas facilities.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Which systems are covered by the design criteria?",{"text":117,"@type":113},"Division II includes general criteria and specific design criteria for sanitary sewer, water systems, and gas facilities, plus a summary of key components.",{"name":119,"@type":110,"acceptedAnswer":120},"How do the construction specifications address sewer and pump station work?",{"text":121,"@type":113},"Division III defines installation and testing requirements for water mains and sanitary sewer mains, rehabilitation methods for manholes (urethane/epoxy) and sewer mains (CIPP), and specifications for sewage pumping stations including pumps, electrical/controls, remote monitoring, continuity of operations, and acceptance.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},662545,1793219824,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":24,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144},3985747870733,"https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd","STANDARD SPECIFICATIONS  \nDaphne Utilities  \nApproved: September 1992  \nLast Amended: January 2019  \nDAPHNE UTILITIES  \nSTANDARD SPECIFICATIONS  \nINDEX  \nTITLE  PAGE NO.  \nDIVISION I -SUBMITTAL REQUIREMENTS  \nGuidelines for Developers, Engineers & Architects I-1- I-4  \nApplication for Approval to Construct Sanitary Sewer I-5- I-9  \nand/or Water Distribution and/or Gas Facilities  \nDIVISION II -DESIGN CRITERIA  \nA. General Criteria II-1- II-3  \nB. Sanitary Sewer System Design Criteria II-3- II-6  \nC. Water System Design Criteria II-6- II-7  \nD. Gas System Design Criteria II-7- II-9  \nE. Summary At A Glance of Key Components II-10- II-11  \nDIVISION III-CONSTRUCTION SPECIFICATIONS  \nSECTION 1-General Specifications for Water Mains  \n1.01- Scope 1-1  \n1.02- Work Included 1-1  \n1.03- Schedule of Operations 1-1  \n1.04- Materials 1-1-1-13 1.05- Inspection 1-13-1-14 1.06- Handling Pipe and Accessories 1-14 1.07- Removing and Replacing Pavement 1-14 1.08- Alignment and Grade 1-15 1.09- Excavation and Preparation of Trench 1-15-1-17 1.10- Pipe Laying 1-17-1-18 1.11- Jointing Pipe 1-18 1.12- Setting Valves, Valve Boxes, Fittings and Blow-Offs 1-18-1-19 1.13- Setting Hydrants 1-19 1.14- Plugging Dead Ends 1-20 1.15- Anchorage of Bends, Tees and Plugs 1-20 1.16- Hydrostatic Testing 1-20-1-22 1.17- Chlorination of Completed Pipeline 1-22-1-24 1.18- Concrete 1-24 1.19- Backfilling 1-24 1.20- Erosion Control 1-24 1.21- Maintenance of Surfaces 1-24 1.22- Clean-Up 1-24 1.23- Pressure Tests and Chlorination Adjacent to Existing Water Lines 1-25 1.24- Existing Water System 1-25 1.25- Dust Control 1-25 1.26- Public Safety 1-25 1.27- Tapping of Water Mains 1-25 1.28- Extra Depth for Water Lines 1-26 1.29- Use of Chemicals 1-26  \nINDEX  \nTITLE  PAGE NO.  \nSECTION 1-General Specifications for Water Mains Cont.  \n1.30- Permits, Certificates, Laws and Ordinances 1-26  \n1.31- Underground Utilities 1-26  \n1.32- Shop Drawings and Record Drawings 1-26  \n1.33- Abandoned Water Mains and Appurtenances 1-27  \n1.34- Project Documentation 1-27-1-28  \nSECTION 2-General Specifications for Water Pumping Stations  \n2.01- Scope 2-1  \n2.02- Location 2-1  \n2.03- Pumping Stations 2-1-2-2  \n2.04- Pumps 2-2  \n2.05- Booster Pump Station 2-2-2-14  \n2.06- Appurtenances 2-14-2-15  \n2.07- Inspection 2-15  \n2.08- Installation 2-15-2-16  \n2.09- Field Quality Control 2-16  \n2.10- Cleaning 2-16  \n2.11- Protection 2-16  \n2.12- Quality Assurance 2-16-2-17  \n2.13- Record Drawings 2-17-2-18  \n2.14- Warranty 2-18  \n2.15- Emergency Standby Power 2-18  \n2.16- Shop Drawings and Record Drawings 2-18  \nSECTION 3-General Specifications for Sanitary Sewer Mains  \n3.01- Scope 3-1  \n3.02- Work Included 3-1  \n3.03- Schedule of Operations 3-1  \n3.04- Materials 3-1-3-6  \n3.05- Encasement Pipe 3-6  \n3.06- Precast Manhole 3-6-3-10  \n3.07- Manhole Testing 3-10-3-12  \n3.08- Manhole Steps 3-12  \n3.09- Castings 3-12-3-13  \n3.10- Drop Connections for Manholes 3-13  \n3.11- Concrete 3-13  \n3.12- Mortar for Sewer Structures 3-13  \n3.13- Running Boards, Saddle Piles and Mats 3-13  \n3.14- Gravel, Slag or Crushed Stone 3-13  \n3.15- Embedment of PVC Pipe for Gravity Sewer Pipe 3-13-3-15  \n3.16- Backfill 3-15  \n3.17- Erosion and Property Control 3-15  \n3.18- Alignment and Grade 3-15-3-16  \n3.19- Excavation and Preparation of Trench 3-16-3-18  \n3.20- Removing and Replacing Pavement 3-18  \n3.21- Pumping and Bypassing 3-18-3-19  \nINDEX  \nTITLE  PAGE NO.  \nSECTION 3-General Specifications for Sanitary Sewer Mains Cont.  \n3.22- Transitions from Dissimilar Pipes 3-19  \n3.23- Inspection 3-19  \n3.24- Handling Pipe and Accessories 3-19-3-20  \n3.25- Pipe Laying 3-20-3-22  \n3.26- Bracing 3-23  \n3.27- Creek Crossings 3-23  \n3.28- Installation of Force Mains 3-23-3-24  \n3.29- Air and Vacuum Valves for Force Mains 3-24  \n3.30- Infiltration 3-25  \n3.31- Testing of Sanitary Sewers 3-25-3-27  \n3.32- Installation of Force Main Valves 3-27-3-28  \n3.33- Clean-Up 3-28  \n3.34- Use of Chemicals 3-28  \n3.35- Permits, Certificates, Laws","cbCaikTG4Iwg060w","https://ap.wps.com/l/cbCaikTG4Iwg060w","pdf",4971146,266,"English","# Division I - Submittal Requirements\n## Guidelines for Developers, Engineers & Architects\n## Application for Approval to Construct Sanitary Sewer and/or Water Distribution and/or Gas Facilities\n# Division II - Design Criteria\n## General Criteria\n## Sanitary Sewer System Design Criteria\n## Water System Design Criteria\n## Gas System Design Criteria\n## Summary At A Glance of Key Components\n# Division III - Construction Specifications\n## Section 1 - General Specifications for Water Mains\n## Section 2 - General Specifications for Water Pumping Stations\n## Section 3 - General Specifications for Sanitary Sewer Mains\n## Section 4 - Urethane/Epoxy Rehabilitation of Manholes\n## Section 5 - Rehabilitation of Sanitary Sewer Mains by the Cured-In-Place-Pipe (CIPP) Method\n## Section 6 - General Specifications for Sewage Pumping Station","[{\"question\":\"What approval and submittal steps are included in the standard specifications?\",\"answer\":\"The document lists Division I guidelines for developers, engineers, and architects, and specifies an application process for approval to construct sanitary sewer and/or water distribution and/or gas facilities.\"},{\"question\":\"Which systems are covered by the design criteria?\",\"answer\":\"Division II includes general criteria and specific design criteria for sanitary sewer, water systems, and gas facilities, plus a summary of key components.\"},{\"question\":\"How do the construction specifications address sewer and pump station work?\",\"answer\":\"Division III defines installation and testing requirements for water mains and sanitary sewer mains, rehabilitation methods for manholes (urethane/epoxy) and sewer mains (CIPP), and specifications for sewage pumping stations including pumps, electrical/controls, remote monitoring, continuity of operations, and acceptance.\"}]","Daphne Utilities - Standard Specifications - 2019 | PDF",670]