[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-662440-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-662440-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","customer-side-make-ready-detailed-site-design-guide","Customer Side Make Ready - Detailed Site Design Guide","","Customer Side Make Ready - Detailed Site Design Guide explains how to develop and submit a detailed site design for a Charge Ready project during the Design and Build phase. It details the Site Design process steps and the make-ready infrastructure workflow, emphasizing preparation through an SCE-provided T&D Narrative and required customer deliverables. It provides guidance for creating an accurate Base Map, including responsibilities, data gathering sources, measurement techniques, and the value of precision for review efficiency, easement identification, and construction scheduling.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/technology/","Technology",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/customer-side-make-ready-detailed-site-design-guide/662440/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/customer-side-make-ready-detailed-site-design-guide/662440.png","ImageObject",300,407,{"name":42,"@type":43},"Fishy","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-29","2026-10-28",true,{"@type":52,"interactionType":53,"userInteractionCount":22},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What inputs does SCE provide for customers to develop a detailed Site Design?","Question",{"text":62,"@type":63},"SCE provides customers all necessary information, including circuit and source details, location descriptions, and the connection point of utility infrastructure to the meter or panel. SCE also provides a T&D Narrative document based on the submitted site plan and expected load for utility infrastructure upgrades.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What is the purpose of the T&D Narrative in the make-ready process?",{"text":67,"@type":63},"The T&D Narrative serves as the connection point for the dedicated meter and the new panel. Customers use it to guide their preliminary design and submission package.",{"name":69,"@type":60,"acceptedAnswer":70},"How do customers create an accurate Base Map?",{"text":71,"@type":63},"Customers must account for accurate measurements of all site features in the final drawings through a site survey. A licensed Land Surveyor or civil engineering firm conducts the survey, and customers should gather existing site information from sources such as plot plans, deeds, satellite imaging, and prior site plans before measuring.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},662440,1793217932,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,104,109,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":102,"slug":103},6,50,"technology",{"id":105,"doc_module":4,"doc_module_name":25,"category_name":106,"show_sort_weight":107,"slug":108},7,"Healthcare",40,"healthcare",{"id":110,"doc_module":4,"doc_module_name":25,"category_name":111,"show_sort_weight":112,"slug":113},8,"Research & Report",30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":101,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":22,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":79,"read_time":144},14431098389841,"https://eur-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","# Customer Side Make Ready-Detailed Site Design Guide\n\n2023  \nSITE DESIGN PROCESS  \n\n| 04 SITE DESIGN DEVELOPMENT  \u003Cbr>PROCESS STEPS   |\n| --- |\n| 05 BASE MAP   |\n| 06 DATA GATHERING/  \u003Cbr>MEASUREMENTS   |\n| 07 DRAWING   |\n| 11 T&D NARRATIVE   |\n| 13 SITE DESIGN   |\n| 16 SITE DESIGN-PARKING GARAGE   |\n| 19 SITE DESIGN-  \u003Cbr>PARKING GARAGE ADA   |\n| 20 CIVIL PLAN   |\n| 21 CIVIL PLAN-OPEN PARKING   |\n| 22 E-SHEET&LOAD CALCULATION   |\n| 23 IMPORTANT DOCUMENTATION  \u003Cbr>REQUIREMENTS   |\n\n# Site Design Process\n\nFor applications that reach the Design and Build phase,SCE will have provided customerswith all the information necessary,including circuit,source,location description,and theconnection point of utility infrastructure to the meter or panel,to develop a detailed SiteDesign for your Charge Ready Project.  \nSCE will provide customers with a T&D Narrative document (sample below),which SCEwill have developed based on the site plan submitted,and the expected load for utilityinfrastructure upgrades.  \nThe T&D Narrative serves as the connection point for the dedicated meter and new panel.  \nSITE DESIGN PROCESS  \n## MAKE-READY INFRASTRUCTURE\n\n\n| 04 SITE DESIGN DEVELOPMENT  \u003Cbr>PROCESS STEPS   |\n| --- |\n| 05 BASE MAP   |\n| 06 DATA GATHERING/  \u003Cbr>MEASUREMENTS   |\n| 07 DRAWING   |\n| 11 T&D NARRATIVE   |\n| 13 SITE DESIGN   |\n| 16 SITE DESIGN-PARKING GARAGE   |\n| 19 SITE DESIGN-  \u003Cbr>PARKING GARAGE ADA   |\n| 20 CIVIL PLAN   |\n| 21 CIVIL PLAN-OPEN PARKING   |\n| 22 E-SHEET&LOAD CALCULATION   |\n| 23 IMPORTANT DOCUMENTATION  \u003Cbr>REQUIREMENTS   |\n\nUsing the T&D Narrative,Preliminary Design,and Procured EVSE technical specifications,customers must developa detailed Site Design to submit to SCE for review and approval prior to permitting and construction.The followingsections outline SCE's submission requirements and recommendations for Site Design development.  \n\n| SITE DESIGN PROCESS   | SOUTHERN CALI  \u003Cbr>EDIS  \u003Cbr>Site Design Development Process Steps  \u003Cbr>Energy for What's A   |\n| --- | --- |\n| 04 SITE DESIGN DEVELOPMENT  \u003Cbr>PROCESS STEPS   | ①  \u003Cbr>3  \u003Cbr>Base Map  \u003Cbr>Civil Plan  \u003Cbr>Detailed Site Design  \u003Cbr>Detailed Property  \u003Cbr>Site/Building electrical  \u003Cbr>EV Charge Layout  \u003Cbr>Boundary  \u003Cbr>drawing  \u003Cbr>T&D Narrative Connection  \u003Cbr>Existing utilities  \u003Cbr>EVSE Nameplate Rating  \u003Cbr>Electrical Plans  \u003Cbr>All features outlined in  \u003Cbr>Annual Load Calculations  \u003Cbr>CAD file Requirements  \u003Cbr>All features outlined in  \u003Cbr>CAD file Requirements  \u003Cbr>83   |\n| 05 BASE MAP   |  |\n| 06 DATA GATHERING/  \u003Cbr>MEASUREMENTS   |  |\n| 07 DRAWING   |  |\n| 11 T&D NARRATIVE   |  |\n| 13 SITE DESIGN   |  |\n| 16 SITE DESIGN-PARKING GARAGE   |  |\n| 19 SITE DESIGN-  \u003Cbr>PARKING GARAGE ADA   |  |\n| 20 CIVIL PLAN   |  |\n| 21 CIVIL PLAN-OPEN PARKING   |  |\n| 22 E-SHEET&LOAD CALCULATION   |  |\n| 23 IMPORTANT DOCUMENTATION  \u003Cbr>REQUIREMENTS   | ⑥2023 Southern California Edison   |\n\nFORNIA  \nON  \nhead  \n04  \nSOUTHERN CALIFORNIA  \n## Base Map\n\nEDISON  \nSITE DESIGN PROCESS  \nEnergy for What's Ahead  \n\n| 04 SITE DESIGN DEVELOPMENT  \u003Cbr>PROCESS STEPS   | Having the Base Map as a CAD file is one of the first steps in  \u003Cbr>creating a successful site design.The Base Map is a drawing  \u003Cbr>that proportionally and geographically depicts the current  \u003Cbr>conditions of a site.The Base Map shows what is currently  \u003Cbr>on the property,the property locations,and the size of the  \u003Cbr>property.It is the customer's responsibility to submit files  \u003Cbr>that include these data and that the information is current  \u003Cbr>and accurate.The following guide will help you develop a  \u003Cbr>Base Map.  \u003Cbr>Measurements  \u003Cbr>Drawing  \u003Cbr>Data Gathering   |\n| --- | --- |\n| 05 BASE MAP   |  |\n| 06 DATA GATHERING/  \u003Cbr>MEASUREMENTS   |  |\n| 07 DRAWING   |  |\n| 11 T&D NARRATIVE   |  |\n| 13 SITE DESIGN   |  |\n| 16 SITE DESIGN-PARKING GARAGE   |  |\n| 19 SITE DESIGN-  \u003Cbr>PARKING GARAGE ADA   |  |\n| 20 CIVIL PLAN   |  |\n| 21 CIVIL PLAN-OPEN PARKING   |  |\n| 22 E-SHEET&LOAD CALCULATION   |  |\n| 23 IMPOR","cbCaio7iaqSDNqw1","https://ap.wps.com/l/cbCaio7iaqSDNqw1","pdf",24293693,23,"English","# Site Design Process\n## Make-Ready Infrastructure\n# Base Map\n## Data Gathering","[{\"question\":\"What inputs does SCE provide for customers to develop a detailed Site Design?\",\"answer\":\"SCE provides customers all necessary information, including circuit and source details, location descriptions, and the connection point of utility infrastructure to the meter or panel. SCE also provides a T\\u0026D Narrative document based on the submitted site plan and expected load for utility infrastructure upgrades.\"},{\"question\":\"What is the purpose of the T\\u0026D Narrative in the make-ready process?\",\"answer\":\"The T\\u0026D Narrative serves as the connection point for the dedicated meter and the new panel. Customers use it to guide their preliminary design and submission package.\"},{\"question\":\"How do customers create an accurate Base Map?\",\"answer\":\"Customers must account for accurate measurements of all site features in the final drawings through a site survey. A licensed Land Surveyor or civil engineering firm conducts the survey, and customers should gather existing site information from sources such as plot plans, deeds, satellite imaging, and prior site plans before measuring.\"}]","Customer Side Make Ready - Detailed Site Design Guide | PDF",58]