[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-201409-105":59,"doc-detail-201409-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","crane-operation-shop-bridge-jib-crane-document-960c-sop-403-revision-3","CRANE OPERATION - SHOP BRIDGE & JIB CRANE - Document 960C-SOP-403 - Revision 3","","Standard Operating Procedure 960C-SOP-403, Revision 3, defines a step-by-step method for safely operating shop bridge and jib type cranes in Heavy Construction Mining operations. The procedure establishes purpose and scope, identifies critical high-level hazards, and specifies controls covering inspection and authorization, operational limits, avoidance of shock loading, safe rigging practices, and protection from line-of-fire, pinch points, and unsecured loads. It emphasizes compliance with company standards, codes, processes, and referenced documentation before work starts.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/crane-operation-shop-bridge-jib-crane-document-960c-sop-403-revision-3/201409/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/crane-operation-shop-bridge-jib-crane-document-960c-sop-403-revision-3/201409.png","ImageObject",300,407,{"name":92,"@type":93},"Ophelia","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-12","2026-09-04",true,{"@type":102,"interactionType":103,"userInteractionCount":29},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the purpose of SOP 960C-SOP-403 for shop bridge and jib cranes?","Question",{"text":112,"@type":113},"It establishes a company standard to safely and effectively carry out work related to operating shop bridge and jib type cranes.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Who is allowed to operate the overhead crane(s) and how should inspections be handled?",{"text":117,"@type":113},"Only designated personnel or trainees under direct supervision may operate the crane(s). Competent and qualified workers must inspect the crane(s), ensure safe operating condition, and document all inspections, including annual and pre-use frequencies.",{"name":119,"@type":110,"acceptedAnswer":120},"What actions must be taken if the crane is defective, damaged, or shock loaded?",{"text":121,"@type":113},"Do not operate the overhead crane(s) if defective and/or damaged; lock/tag out and report to the supervisor. If shock loading is suspected, remove the crane from service, have it inspected by a qualified person, and re-certify for lifting.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},201409,1788533273,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":29,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144},7971461741311,"https://ap-avatar.wpscdn.com/avatar/74000253aff267980c6?x-image-process=image/resize,m_fixed,w_180,h_180&k=1779345379180704826","*This document is not controlled if printed. *  \nCRANE OPERATION-SHOP BRIDGE & JIB CRANE  \n|  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- |\n| 3 | APP | FEB 22 , 2022 | Approved | Andre Brule | Tammy Siver | Gilbert Schreyer |\n| 2 | APP | OCT 01, 2012 | Approved | R. Shemeliuk | Tammy Siver | Barry Palmer |\n| Rev | Status | Rev. Date | Status Description | Prepared by | Reviewed by | Approved by |\n\n\n| STANDARD OPERATING PROCEDURE |  |  |\n| --- | --- | --- |\n|  |  |  |\n| CRANE OPERATION - SHOP BRIDGE & JIB CRANE |  | Document Number: 960C-SOP-403 |\n|  |  |  |\n| Original Approval Date: OCT 10, 2012 | Revision Number: 3 | Page 2 of 11 |\n| Latest Revision Date: FEB 22 , 2022 | Next Revision Date: FEB 22 , 2025 | Document Approval Level: 4 |\n\n*This document is not controlled if printed. *  \nThe following is a step by step procedure on how to complete a specific task or meet a facility specific requirement. Standard Operating Procedures (SOPs) are written for all identified critical tasks. By virtue of the hazard or complexity associated with critical tasks it is paramount that the SOP be followed as written. SOPs contain a listing of high-level hazards associated with the task, for detailed hazard analysis reference the applicable Task Hazard Assessments. SOPs do not replace the requirements contained in the company Standards, Codes, and Processes nor does it replace the need to comply with required legislation. Section 8.0 references documentation that the worker shall understand before work commences.  \n1.0 PURPOSE  \n• To establish a company standard to safely and effectively carry out work as it applies to operating shop bridge and jib type cranes.  \n2.0 SCOPE AND APPLICATION  \n• This document applies to all company Heavy Construction Mining operations. Ensure all site-specific requirements are being met or exceeded before performing the task.  \n3.0 HAZARDS AND CONTROLS  \n• Overhead crane(s) failing and/or malfunctioning due to improper inspection and/or use:  \no Overhead crane(s) will only be operated by designated personnel or by trainees under the direct supervision of a designated person. Always operate the crane (s) within manufacturer’s specifications.  \no Competent and qualified workers will conduct inspections on the crane(s) to ensure the equipment isin safe operating condition, all inspections will be documented.  \no Overhead crane(s) must be inspected on an annual, periodic, and pre use frequency. Annual inspections will be completed by a competent third-party engineering company and/or equipment manufacturer. Frequency of inspections may increase depending on crane use.  \no Do not operate the overhead crane(s) if it is found to be defective and/or damaged. The operator will lock/tag out, and report to the supervisor.  \no Do not block, adjust, or disconnect limit switches.  \n• Overloading the crane resulting in catastrophic failure:  \no Know the weights of components/parts to be lifted and/or suspended, always refer to OEM procedures for component/part information.  \no Read and understand the manufactures manual. Know, and understand the capacity limits of the overhead cranes. Never exceed the cranes marked safe working limits (SWL) .  \no Do not shock load the crane. If you suspect the crane or its components have been shock loaded, it must be removed from service, inspected by a qualified person and re-certified for lifting.  \n\n| STANDARD OPERATING PROCEDURE |  |  |\n| --- | --- | --- |\n|  |  |  |\n| CRANE OPERATION - SHOP BRIDGE & JIB CRANE |  | Document Number: 960C-SOP-403 |\n|  |  |  |\n| Original Approval Date: OCT 10, 2012 | Revision Number: 3 | Page 3 of 11 |\n| Latest Revision Date: FEB 22 , 2022 | Next Revision Date: FEB 22 , 2025 | Document Approval Level: 4 |\n\n*This document is not controlled if printed. *  \n• Unsecure rigging and rigging failure resulting in personal injury and/or property damage:  \no Thoroughly inspect all rigging components prior to use (e.g. lifting eyes, shackles, slings, ","cbCaifVhjRHnH2Wb","https://ap.wps.com/l/cbCaifVhjRHnH2Wb","pdf",511060,11,"English","# 1.0 PURPOSE\n# 2.0 SCOPE AND APPLICATION\n# 3.0 HAZARDS AND CONTROLS\n## Overhead crane inspection and malfunction controls\n## Overloading and catastrophic failure controls\n## Unsecure rigging and rigging failure controls\n## Crushing, line of fire and pinch point hazards\n## Unclear communication hazards","[{\"question\":\"What is the purpose of SOP 960C-SOP-403 for shop bridge and jib cranes?\",\"answer\":\"It establishes a company standard to safely and effectively carry out work related to operating shop bridge and jib type cranes.\"},{\"question\":\"Who is allowed to operate the overhead crane(s) and how should inspections be handled?\",\"answer\":\"Only designated personnel or trainees under direct supervision may operate the crane(s). Competent and qualified workers must inspect the crane(s), ensure safe operating condition, and document all inspections, including annual and pre-use frequencies.\"},{\"question\":\"What actions must be taken if the crane is defective, damaged, or shock loaded?\",\"answer\":\"Do not operate the overhead crane(s) if defective and/or damaged; lock/tag out and report to the supervisor. If shock loading is suspected, remove the crane from service, have it inspected by a qualified person, and re-certify for lifting.\"}]","CRANE OPERATION - SHOP BRIDGE & JIB CRANE - Document 960C-SOP-403 - Revision 3 | PDF",28]