[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649871-105":59,"doc-detail-649871-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","cp0035195020drawing20a-120repost","CP00351950%20Drawing%20A-1%20Repost","","Construction drawing set covering demolition and renovation plans for the University of South Carolina Men's Basketball Office renovation on Assembly Street (bid set). Includes detailed wall and door assembly notes such as hollow metal knock-down frames, gypsum board type X at rated walls, metal studs and runners, perimeter sealant, and schedules for doors. Specifies steps like removing existing wall as required for a new door frame and patching to match existing conditions, with typical finishes noted.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/cp0035195020drawing20a-120repost/649871/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/cp0035195020drawing20a-120repost/649871.png","ImageObject",300,407,{"name":92,"@type":93},"How to eat","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-31","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What work is covered in these demolition and renovation plans?","Question",{"text":112,"@type":113},"The sheet set covers demolition and renovation plans for the University of South Carolina Men's Basketball Office renovation on Assembly Street (bid set).","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Which door and frame system is specified?",{"text":117,"@type":113},"A hollow metal knock-down frame is specified, with painted finishes and door installation “as scheduled.”",{"name":119,"@type":110,"acceptedAnswer":120},"What is required regarding the existing wall for the new door frame?",{"text":121,"@type":113},"Remove the existing wall as required for the new door frame, then patch the wall at the frame to match existing conditions.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},649871,1792809839,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81},962093541613,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","| 6/28/2012 1 1 : 15:53 AM | \u003Cbr>PLAN NORTH\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>HOLLOW METAL KNOCK-DOWN FRAME, PAINTED\u003Cbr>\u003Cbr>\u003Cbr>5/8\" GYPSUM BOARD (TYPE \"X\" AT RATED WALLS)\u003Cbr>\u003Cbr>METAL STUD @ HEAD\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>CONT. SEALANT @ PERIM. EA. SIDE TYP\u003Cbr>\u003Cbr>DOOR AS SCHEDULED\u003Cbr>\u003Cbr>\u003Cbr>METAL RUNNER\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>EXISTING WALL\u003Cbr>NOTE: REMOVE EXISTING WALL AS REQ'D FOR NEW DOOR FRAME. PATCH WALL AT FRAME\u003Cbr>TO MATCH EXISTING.\u003Cbr>\u003Cbr>F.V.\u003Cbr>1 15/16\"\u003Cbr>1 15/16\"\u003Cbr>2\" HG2 \u003Cbr>HEAD DETAIL \u003Cbr>SCALE\u003Cbr>1-1/2\" = 1'-0\" \u003Cbr>\u003Cbr>HOLLOW METAL\u003Cbr>KNOCK-DOWN FRAME,\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>5/8\" GYPSUM BOARD (TYPE 'X' AT RATED WALLS)\u003Cbr>\u003Cbr>DOUBLE METAL STUDS @ JAMB\u003Cbr>\u003Cbr>\u003Cbr>CONT. SEALANT @ PERIM. EA. SIDE TYP\u003Cbr>\u003Cbr>EXISTING WALL\u003Cbr>2\"\u003Cbr>\u003Cbr>PAINTED\u003Cbr>NOTE: REMOVE EXISTING WALL AS REQ'D FOR NEW DOOR FRAME. PATCH WALL AT FRAME TO MATCH EXISTING. JG2 JAMB DETAIL \u003Cbr>SCALE\u003Cbr>1-1/2\" = 1'-0\" \u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>DOUBLE METAL STUDS @ JAMB\u003Cbr>\u003Cbr>SHIM AS REQ'D\u003Cbr>\u003Cbr>EXISTING WALL\u003Cbr>5/8\"\u003Cbr>5/8\"\u003Cbr>4 7/8\" +/-\u003Cbr>1/4\" 2\"\u003Cbr>NOTE: REMOVE EXISTING WALL AS REQ'D FOR NEW DOOR FRAME. PATCH WALL AT FRAME TO MATCH EXISTING.\u003Cbr> 5/8\" GYP BD. PATCH TO MATCH EXISTING,\u003Cbr>PAINT. TYP\u003Cbr> 3/4\" THK. WOOD TRIM, PAINT TO MATCH\u003Cbr>ADJACENT WALL, TYP\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>HG1 JAMB DETAIL \u003Cbr>SCALE\u003Cbr>1-1/2\" = 1'-0\" JG1 JAMB DETAIL \u003Cbr>SCALE\u003Cbr>1-1/2\" = 1'-0\"\u003Cbr>|  |  |\n| --- | --- | --- | --- |\n|  |  | \u003Cbr>|  |\n|  |  | 1217 Hampton Street Columbia, SC 29201 | T: 803.771.2999 F: 803.771.2858 |\n|  |  | CORPORATE SEAL\u003Cbr>A/E SEAL\u003Cbr>\u003Cbr>PROJECT TITLE\u003Cbr>UNIVERSITY OF SOUTH CAROLINA MEN'S BASKETBALL OFFICE RENOVATION\u003Cbr>ASSEMBLY STREET\u003Cbr>BID SET |  |\n|  |  | Conditions of Use: This drawing and the design thereon are the property of Quackenbush Architects + Planners. Thereproduction, copying, or use of this drawing without the written consent of Quackenbush Architects + Planners is prohibited and any infringement will be subject to legal action.\u003Cbr>REVISIONS\u003Cbr>NO REVISION DATE\u003Cbr>SHEET INFORMATION Date JUNE 18, 2012 Project No. 12.130.02 Scale As indicated Drawn By JRF Checked By BLH\u003Cbr>TITLE\u003Cbr>DEMOLITION AND RENOVATION PLANS\u003Cbr>\u003Cbr>A1\u003Cbr>SHEET NO. |  |","cbCaigN4DyYE2Wda","https://ap.wps.com/l/cbCaigN4DyYE2Wda","pdf",178880,"English","# Demolition and Renovation Plans\n## Door and Frame Details\n## Wall Patch and Finish Notes","[{\"question\":\"What work is covered in these demolition and renovation plans?\",\"answer\":\"The sheet set covers demolition and renovation plans for the University of South Carolina Men's Basketball Office renovation on Assembly Street (bid set).\"},{\"question\":\"Which door and frame system is specified?\",\"answer\":\"A hollow metal knock-down frame is specified, with painted finishes and door installation “as scheduled.”\"},{\"question\":\"What is required regarding the existing wall for the new door frame?\",\"answer\":\"Remove the existing wall as required for the new door frame, then patch the wall at the frame to match existing conditions.\"}]","CP00351950%20Drawing%20A-1%20Repost | PDF"]