[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-662485-105":59,"doc-detail-662485-en":122},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":115,"head_meta":117,"extra_data":119,"updated_unix":121},105,"en","cosf-checklist-for-retaining-wall-permit-drawings","COSF Checklist for Retaining Wall Permit Drawings","","Checklist detailing submission requirements for retaining wall permit drawings. Specifies owner or engineer certification, required drawing format and legibility, plan metadata such as address, lot information, dates, north arrow and scale, and engineering seal/signature when walls exceed height limits. Requires depiction of the 100-year flood plain, grading with contours and spot grades, state waters and buffers, all buffers and setbacks, drainage and easements, specimen tree locations and limits, and construction disturbance limits. Includes additional wall-type-specific elements for all walls, mechanically stabilized earth with geogrid, cast-in-place concrete walls, and timber walls, plus project applicant fields.",{"@graph":69,"@context":114},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/cosf-checklist-for-retaining-wall-permit-drawings/662485/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/cosf-checklist-for-retaining-wall-permit-drawings/662485.png","ImageObject",300,407,{"name":92,"@type":93},"Rhys","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":24},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108],{"name":109,"@type":110,"acceptedAnswer":111},"What additional details are required for different retaining wall types?","Question",{"text":112,"@type":113},"For mechanically stabilized earth walls, include modular unit/product specifications and reinforcing layer profiles plus backfill zones and materials. For cast-in-place concrete walls, provide rebar schedules and details, step footing details if applicable, veneer, concrete strength/cement type, and cold joints/shear keys. For timber walls, specify timber dimensions and treatment, tieback system, and connection details such as nailing/pin/rebar with material sizes/specs, plus wall batter from vertical.","Answer","https://schema.org",{"og:url":83,"og:type":116,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":118,"canonical":83},"index,follow",{"doc_id":120,"site_id":62},662485,1793218269,{"code":4,"msg":5,"data":123},{"doc_id":120,"user_id":124,"nickname":92,"user_avatar":125,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":126,"file_id":127,"file_url":128,"file_type":129,"file_size":130,"view_count":24,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":81,"language":131,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":132,"faqs":133,"seo_title":134,"seo_description":67,"update_tm":121,"read_time":39},687207024643,"https://ap-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","Checklist for  \nRetaining Wall Permit Drawings  \nGeneral  \n􀀴 Attach Owner or Engineer Certification-completely filled out  \n􀀴 Scaled drawing on 8½” x 11\" paper format (or pre-folded to same or smaller)  \n􀀴 Legible print for ALL text (min. 0.08\")  \n􀀴 Street address and subdivision name, lot number and block or unit, land lot and district numbers  \n􀀴 Date of plan  \n􀀴 North arrow and scale  \n􀀴 Professional Engineer’s seal and signature required on any wall higher than 8 feet  \n􀀴 Show 100-year flood plain  \n􀀴 Show existing grading and proposed grading plan with contours and spot grades  \n􀀴 Show State Waters, if any, and associated buffers measured from the top of bank  \n􀀴 Show all buffers of any type, no improvement setbacks, and landscape strips on the lot/property  \n􀀴 Show all drainage, sewer, access, flood, detention pond, private or other easements on the lot  \n􀀴 Show location and protection limits of any specimen trees  \n􀀴 Show tree save limits,(if applicable)  \n􀀴 Show limits of construction/disturbance on the subject property  \nAll Walls  \n􀀴 Provide nominal wall thickness dimensions at top and bottom of walls  \n􀀴 Show footing dimensions in plan and section  \n􀀴 Provide wall section  \n􀀴 Provide surface drainage at top of wall  \nCommunity Development Services Telephone: (470)809-7200  \n5440 Fulton Ind Blvd Atlanta, Ga 30336  \n􀀴 Provide toe drains, weepholes, as applicable  \n􀀴 State required (applied) soil bearing pressure (PSF)  \n􀀴 Indicate railings where required by code  \nFor Mechanically Stabilized Earth Walls, Geogrid, Etc.  \n􀀴 Indicate modular unit manufactured with product type/specification  \n􀀴 Provide wall profile or section(s) showing reinforcing layers  \n􀀴 Show/specify reinforcing/grids strength by ASTM or manufacturer designations  \n􀀴 Specify all backfill zones and materials  \nFor Cast-In-Place ConcreteWalls  \n􀀴 Provide rebar schedule, details, sizes, bends  \n􀀴 Provide step footing detail, if applicable, with reinforcing details  \n􀀴 Indicate veneer, if any  \n􀀴 Specify concrete strength, cement type  \n􀀴 Show cold joints, shear keys  \nFor Timber Walls  \n􀀴 Show/specify timber dimensions, timber treatment,(creosote, etc. ), tieback system  \n􀀴 Detail nailing/pin/rebar connections and material sizes/specs  \n􀀴 Indicate wall batter from vertical  \nPROJECT NAME:    LDP \\#   DATE SUBMITTED: SEWER BASIN:    \nAPPLICANT:     \nPRINT NAME SIGNATURE  \nFIRM:   PHONE:   \nACCEPTED/DENIED FOR CDS:   \n081099","cbCair8N6mrz6vC5","https://ap.wps.com/l/cbCair8N6mrz6vC5","pdf",96271,"English","# General\n## All Walls\n## Mechanically Stabilized Earth Walls, Geogrid, Etc.\n## Cast-In-Place Concrete Walls\n## Timber Walls\n## Project Submission Fields","[{\"question\":\"What additional details are required for different retaining wall types?\",\"answer\":\"For mechanically stabilized earth walls, include modular unit/product specifications and reinforcing layer profiles plus backfill zones and materials. For cast-in-place concrete walls, provide rebar schedules and details, step footing details if applicable, veneer, concrete strength/cement type, and cold joints/shear keys. For timber walls, specify timber dimensions and treatment, tieback system, and connection details such as nailing/pin/rebar with material sizes/specs, plus wall batter from vertical.\"}]","COSF Checklist for Retaining Wall Permit Drawings | PDF"]